31-Sec 02 41 16 - DEMOLITION.pdf

PDF 131 KB Posted

Attached to
1121 Horsham Road Demolition (26-01054)
Solicitation number
US.258594
Issued by
Pennsylvania

About this file

Demolition Specifications Summary

This is a demolition specification document (Section 02 41 16) for the 1121 Horsham Road demolition project in Pennsylvania. The project scope includes removal and proper disposal of the designated residential structure and associated facilities, with existing water and sanitary services to be abandoned at the mains per the project description. The contractor must follow the Sequence of Construction outlined in Section 01 11 13 and submit demolition procedures and schedules in accordance with Section 01 33 00. All work must comply with Pennsylvania's Asbestos Occupations Accreditation and Certification Act of 1990 and Federal National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations, including notification to the Pennsylvania Department of Environmental Protection (DEP) prior to commencement. The specifications require progressive, orderly demolition conducted one floor at a time from top to bottom, with foundation walls removed to a depth of minus 18 inches and basement floors broken up for drainage.

The contractor must maintain protected egress and access, erect temporary barriers for security, and control dust throughout demolition operations. All utilities must be located, disconnected, and capped with locations marked on project record documents. Demolished materials must be removed from the site as work progresses, and all disturbed areas must be backfilled with certified clean fill in maximum 12-inch lifts, compacted to 90 percent of maximum dry density per Modified Effort ASTM D1557, and graded to match surrounding topography with proper drainage. Waste disposal must comply with the Solid Waste Management Act, Municipal Waste Planning, Recycling and Waste Reduction Act, Clean Streams Law, and Resource Conservation and Recovery Act, with materials prohibited from disposal in any watercourse or body of water. The specification explicitly prohibits burning of debris without written permission from local authorities and prohibits use of swinging demolition equipment adjacent to public thoroughfares.

View the file

Other files

File Type Posted
10-Sec 01 56 39. - LANDSCAPE PROTECTION.pdf PDF
12-Doc 00 01 10 - TABLE OF CONTENTS.pdf PDF
41-Doc 00 73 00 02 - Appendix A - cover sht.pdf PDF
56-Horsham Road Demo Plans 2026-11-03.pdf PDF
15-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
1-Sec 01 29 00 - CONTRACT CONSIDERATIONS.pdf PDF
54-Sec 01 22 00 - MEASUREMENT AND PAYMENT.pdf PDF
20-Doc 00 52 00 - AGREEMENT.pdf PDF
52-x1 - Horsham Road Demo Plans 2026-10-14.pdf PDF
27-Doc 00 91 13 - ADDENDA.pdf PDF
44-Doc 00 73 00 08 - Appendix D - cover sht.pdf PDF
33-Doc 00 62 76 - Application for Payment.pdf PDF
43-Doc 00 73 00 06 - Appendix C - cover sht.pdf PDF
34-Doc 00 62 16 - CERTIFICATE OF INSURANCE.pdf PDF
30-Doc 00 72 00 - GENERAL CONDITIONS.pdf PDF
26-Doc 00 41 00 - BID FORM - EBID.pdf PDF
47-Doc 00 73 00 10 - Appendix E - cover sht.pdf PDF
17-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
9-Doc 00 21 13.1-Instr for Electronic Bidding.pdf PDF
46-Doc 00 73 00 04 - Appendix B - cover sht.pdf PDF
42-Doc 00 73 00 05 - Appendix B - Public Works Employment Verification Form.pdf PDF
24-Doc 00 65 19.16 - SUBCONTRACTORS RELEASE OF LIENS.pdf PDF
40-Doc 00 11 13 - ADVERTISEMENT FOR BIDS - 1121 Horsham Road Demo.pdf PDF
48-Doc 00 73 00 07 - Appendix C - ACM Survey Rpt final.pdf PDF
38-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
49-Doc 00 73 00 09 - Appendix D - lead rpt final.pdf PDF
8-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
5-Sec 01 33 00 - SUBMITTALS.pdf PDF
6-Sec 01 50 00 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS.pdf PDF
29-Sec 01 57 13 Soil Erosion and Sediment Control.pdf PDF
32-Sec 32 92 00 - Finish Grading, Seeding and Sodding.pdf PDF
18-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
4-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
25-Sec 31 23 33 - Excavation, Backfill and Compaction.pdf PDF
21-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
13-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
2-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
7-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
3-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
28-Doc 00 21 13 - INSTRUCTIONS TO BIDDERS - EBID - 2025.pdf PDF
51-Doc 00 73 00 03 - Appendix A - Prevailing Wage Determination (SN 26-09095).pdf PDF
37-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
19-Doc 00 63 63 - Change Order.pdf PDF
22-Doc 00 43 13 - BID BOND.pdf PDF
50-Doc 00 73 00 01 - SUPPLEMENTARY CONDITIONS.pdf PDF
36-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
45-Doc 00 73 00 11 - Appendix E - Universal Waste Report final.pdf PDF
35-Doc 00 65 19.13 - SUBCONTRACTORS AFFIDAVIT.pdf PDF
55-Attendance List.pdf PDF
53-Doc 00 01 15 - TABLE OF CONTENTS - LIST OF DRAWINGS.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION

02 41 16-1

SECTION 02 41 16

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Remove and properly dispose of all items shown on the Drawings in accordance with the Sequence of Construction in Section 01 11 13 including the following:

1. Remove designated structures and associated facilities.

1.02 RELATED WORK

A. Section 01 11 13: Summary of Work B. Section 01 70 00: Contract Closeout: Project record documents.

1.03 SUBMITTALS

A. Submit demolition and removal procedures and schedule under provisions of Section 01 33 00.

B. Submit asbestos containing material demolition and removal procedures and schedule meeting the requirements of this section under provisions of Section 01 33 00.

1.04 EXISTING CONDITIONS

A. Conduct demolition to minimize interference with adjacent building areas. Maintain protected egress and access at all times.

B. Provide, erect, and maintain temporary barriers and security devices.

C. Satisfactorily prevent of control dust resulting from demolition.

D. The OWNER does not assume responsibility for the condition of the various buildings or loss of fixtures, equipment, material, or other objects between submittal of the proposal and actual possession of the buildings.

E. Comply with the National Emission Standard for Asbestos, as contained in the Federal

Register, Vol. 55, No. 224.

PART 2 - PRODUCTS

Not Used

PART 3 - EXECUTION

3.01 PREPARATION

A. Locate existing active utilities and verify whether each utility will remain in service and therefore requires protection of is part of the demolition and removal activity.

B. Protect existing items which are not indicated to be altered.

C. Prior to starting work make arrangements with the proper authorities for turning off and

02 41 16-2 disconnecting utilities in conjunction with demolition activities. Disconnect, remove, and cap designated utility services within demolition areas. Mark location of disconnected utilities.

Identify and indicate capping locations on Project Record Documents.

D. Comply with the requirements, outlined in Pennsylvania’s Asbestos Occupations

Accreditation and Certification Act of 1990 (Acts 194 and 161) as well as Federal National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations, for providing notification to all State and County agencies having regulatory enforcement responsibility for demolition and asbestos abatement projects prior to the start of any such work. Such notification should be made using the “Asbestos Abatement and Demolition/Renovation Notification Form,” which may be obtained by contacting the DEP Asbestos Office at (717) 787-9257, or the nearest DEP regional office. The form (2700-FM-AQ0021) may also be obtained here: https://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=2685

3.02 EXECUTION

A. All work shall be accordance with all applicable regulations, laws, statutes and standards of the PADEP, EPA and OSHA.

B. Before starting work, make arrangements with the proper authorities for turning off and disconnecting utilities in connection with demolition operations. Perform the work according to local requirements.

C. Do not interfere with functioning wells, cisterns, cesspools or other ground openings outside of the condemned area. Securely and permanently cap well casings. Cut off and cap pipes leading into or out of wells.

C. Demolish in an orderly and careful manner. Protect any existing structures to remain from damage.

D. Remove existing fences and guide rail posts, unless otherwise directed. Do not disturb existing paving unless it becomes necessary to do so in order to complete other work.

E. Do not use a swinging ball immediately adjacent to any public thoroughfare or in any area where it may create a public hazard.

F. Do not, under any circumstances, set fire to structures. Burning of debris shall not be allowed except by written permission of local police or fire authorities and unless the burning conforms with State Air Pollution Control Commissions regulations. Do not begin burning until a copy of the written permission has been received by the Engineer.

G. Restrict demolition to horizontal operations, one floor of a structure at a time. Progressively demolish a structure or structures, except for the striping of fixtures, from top to bottom, one floor at a time. Bay, or sectional type demolition will be considered, provided a detailed plan, including the building’s structural framework, is submitted and accepted prior to the work.

Progressively demolish each bay or sectional-type structures from top to bottom as well.

Completely demolish each bay or section before starting operations on any adjacent bay or section. Remove each bay or section in a manner that maintains the integrity and proper support of adjacent bays or sections.

H. Remove walls, remove the foundations walls to minus 18”. Break up basement floors for drainage.

I. Except where noted otherwise, immediately remove demolished materials from site.

J. Remove materials to be re-installed or retained in manner to prevent damage.

https://www.depgreenport.state.pa.us/elibrary/GetFolder?FolderID=2685

02 41 16-3

K. Remove, store, and protect for re-installation the following materials and equipment:

- Nothing

L. Remove and promptly dispose of contaminated, vermin infested, or dangerous materials encountered.

M. Remove demolished materials from site as work progresses. Upon completion of work, leave areas of work in clean condition.

N. Waste materials, scrap, or excess construction materials may not be disposed of in any watercourse, floodway or body of water, but shall be collected, stored and disposed of in accordance with the Solid Waste Management Act (35 P.S. §§ 6018.101-6018.1003), the Municipal Waste, Planning, Recycling and Waste Reduction Act (53 P.S. §§ 4000.101- 4000.1904), the Clean Streams Law (35 P.S. §§ 691.1-691.1001), the Resource Conservation and Recovery Act, as amended (42 U.S.C. § 6901 et seq.) and related rules and regulations.

O. Carefully backfill cellars and other subsurfaces with certified clean fill, and grade to the adjacent ground level. Backfill and grade to ensure proper drainage.

1. Lift Thickness Limitations:

a. Lift thicknesses shall be limited to twelve (12) inches maximum for backfill in non-paved areas and for structure excavations.

b. Any demolished concrete used as part of the backfill shall be free of large voids to minimize the potential for settlement.

2. Compaction

a. The following percentages of maximum dry density shall be achieved:

Modified Effort

ASTM D1557

• Backfill within Unpaved Areas 90%

END OF SECTION

END OF SECTION