51-Doc 00 73 00 03 - Appendix A - Prevailing Wage Determination (SN 26-09095).pdf
PDF 33 KB Posted
- Attached to
- 1121 Horsham Road Demolition (26-01054)
- Solicitation number
- US.258594
- Issued by
- Pennsylvania
About this file
This document is a Prevailing Wage Determination issued by the Commonwealth of Pennsylvania Department of Labor & Industry for the 1121 Horsham Road Demolition project (Serial Number 26-09095) in Horsham Township, Montgomery County. The project involves demolition of an existing residential home, abandonment of existing water and sanitary services at the mains, grading of disturbed areas to match surrounding topography, and permanent stabilization of the site. The project was awarded to Horsham Township on November 18, 2026, with a determination date of October 15, 2026. The determination was assigned to the Philadelphia Field Office and classified as a Highway project.
The document establishes prevailing wage rates applicable to the project across multiple trade classifications, including Building and Heavy/Highway categories. Wage rates are provided for various positions such as carpenters, electricians, plumbers, laborers (multiple classes), equipment operators (multiple classes), and numerous other skilled trades, with hourly rates ranging from approximately $24.28 to $74.86 before fringe benefits. Each classification includes both hourly wage rates and fringe benefit amounts, with effective dates and expiration dates specified for rate periods extending from 2022 through 2030. The determination serves as the mandatory wage standard for all workers employed on this public works project in Pennsylvania.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: 1121 Horsham Road Demolition (26-01054)
General Description: This project involves demolition of an existing residential home. Existing water service and sanitary service will need to be abandoned at the mains. All disturbed areas are to be graded to match the surrounding topography and permanently stabilized.
Project Locality Horsham Township
Awarding Agency: Horsham Township
Contract Award Date: 11/18/2026
Serial Number: 26-09095
Project Classification: Highway
Determination Date: 10/15/2026
Assigned Field Office: Philadelphia
Field Office Phone Number: (215)560-1858
Toll Free Phone Number:
Project County: Montgomery County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 10/15/2026 Page 1 of 7
Project: 26-09095 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55
Asbestos & Insulation Workers 5/1/2026 $64.51 $50.26 $114.77
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2024 $36.71 $19.13 $55.84
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2026 $41.34 $19.23 $60.57
Boilermakers 1/1/2024 $52.10 $35.72 $87.82
Boilermakers 1/1/2026 $58.00 $36.57 $94.57
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Bricklayer 5/1/2026 $51.15 $34.92 $86.07
Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $55.83 $30.39 $86.22
Carpenter - Chief of Party (Surveying & Layout) 5/1/2027 $58.03 $30.74 $88.77
Carpenter - Chief of Party (Surveying & Layout) 5/1/2028 $60.29 $31.09 $91.38
Carpenter - Chief of Party (Surveying & Layout) 5/1/2029 $62.63 $31.44 $94.07
Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $48.55 $30.39 $78.94
Carpenter - Instrument Person (Surveying & Layout) 5/1/2027 $50.46 $30.74 $81.20
Carpenter - Instrument Person (Surveying & Layout) 5/1/2028 $52.43 $31.09 $83.52
Carpenter - Instrument Person (Surveying & Layout) 5/1/2029 $54.46 $31.44 $85.90
Carpenter - Instrument Person (Surveying & Layout) 5/1/2030 $56.55 $31.79 $88.34
Carpenter - Rodman (Surveying & Layout) 5/1/2026 $24.28 $21.99 $46.27
Carpenter - Rodman (Surveying & Layout) 5/1/2027 $25.23 $22.34 $47.57
Carpenter - Rodman (Surveying & Layout) 5/1/2028 $26.22 $22.69 $48.91
Carpenter - Rodman (Surveying & Layout) 5/1/2029 $27.23 $23.04 $50.27
Carpenter - Rodman (Surveying & Layout) 5/1/2030 $28.28 $23.39 $51.67
Carpenters 5/1/2026 $48.55 $30.39 $78.94
Carpenters 5/1/2027 $50.46 $30.74 $81.20
Carpenters 5/1/2028 $52.43 $31.09 $83.52
Carpenters 5/1/2029 $54.46 $31.44 $85.90
Carpenters 5/1/2030 $56.55 $31.79 $88.34
Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96
Cement Masons 5/1/2024 $46.70 $32.46 $79.16
Cement Masons 5/1/2025 $48.70 $32.46 $81.16
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49
Drywall Finisher 5/1/2026 $41.10 $32.99 $74.09
Electricians 5/1/2026 $62.41 $48.50 $110.91
Electricians 5/1/2027 $66.53 $50.63 $117.16
Electricians 5/1/2028 $70.83 $52.83 $123.66
Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62
Elevator Constructor 1/1/2026 $74.86 $46.86 $121.72
Floor Coverer 5/1/2025 $51.67 $31.69 $83.36
Floor Coverer 5/1/2026 $52.84 $32.86 $85.70
Glazier 5/1/2025 $49.96 $38.34 $88.30
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/15/2026 Page 2 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Glazier 5/1/2026 $51.30 $39.37 $90.67
Interior Finish 5/1/2023 $34.60 $25.80 $60.40
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04
Iron Workers (Riggers) 7/1/2026 $48.84 $36.52 $85.36
Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45
Iron Workers (Rodman/Reinforcing) 7/1/2026 $52.39 $36.90 $89.29
Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70
Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93
Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45
Marble Finisher 5/1/2025 $41.17 $30.75 $71.92
Marble Finisher 5/1/2026 $42.07 $31.85 $73.92
Marble Mason 5/1/2023 $47.20 $31.95 $79.15
Marble Setter 5/1/2026 $51.50 $33.80 $85.30
Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01
Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01
Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90
Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90
Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69
Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69
Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58
Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58
Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40
Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40
Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01
Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01
Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78
Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78
Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50
Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50
Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81
Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21
Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43
Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83
Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93
Painters Class 1 (see notes) 5/1/2026 $45.71 $35.22 $80.93
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/15/2026 Page 3 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02
Painters Class 4 (see notes) 5/1/2026 $48.45 $35.22 $83.67
Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2025 $70.53 $39.46 $109.99 plumber 5/1/2026 $73.73 $40.36 $114.09
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Pointers, Caulkers, Cleaners 5/1/2026 $53.35 $32.30 $85.65
Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80
Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75
Roofers (Shingle) 5/1/2023 $32.85 $22.10 $54.95
Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55
Roofers (Slate & Tile) 5/1/2023 $35.85 $22.10 $57.95
Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55
Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79
Sheet Metal Workers 5/1/2026 $65.06 $54.48 $119.54
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39
Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22
Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22
Steamfitters 5/1/2024 $70.32 $43.09 $113.41
Steamfitters 5/1/2025 $72.52 $44.89 $117.41
Stone Masons 5/1/2025 $50.00 $32.80 $82.80
Stone Masons 5/1/2026 $51.50 $33.80 $85.30
Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02
Terrazzo Finisher 5/1/2026 $47.78 $29.61 $77.39
Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29
Terrazzo Grinder 5/1/2026 $47.78 $29.61 $77.39
Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47
Terrazzo Mechanics 5/1/2026 $53.36 $32.61 $85.97
Tile Finisher 5/1/2025 $41.17 $30.75 $71.92
Tile Finisher 5/1/2026 $42.07 $31.85 $73.92
Tile Setter 5/1/2025 $52.21 $31.26 $83.47
Tile Setter 5/1/2026 $53.36 $32.61 $85.97
Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33
Truckdriver class 1(see notes) 5/1/2026 $38.57 $23.87 $62.44
Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43
Truckdriver class 2 (see notes) 5/1/2026 $38.67 $23.87 $62.54
Truckdriver class 3 (see notes) 5/1/2026 $38.92 $23.87 $62.79
Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55
Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/15/2026 Page 4 of 7
Project: 26-09095 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Bricklayer 5/1/2026 $51.15 $34.92 $86.07
Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05
Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96
Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45
Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15
Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07
Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51
Carpenter 5/1/2025 $57.36 $30.09 $87.45
Carpenter 5/1/2026 $58.71 $30.44 $89.15
Cement Masons 5/1/2023 $43.20 $32.91 $76.11
Cement Masons 5/1/2025 $46.55 $32.66 $79.21
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/ Pile driver diver 5/1/2025 $60.31 $44.97 $105.28
Dockbuilder/ Pile driver diver 5/1/2026 $61.88 $45.47 $107.35
Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Electric Lineman 6/3/2024 $62.07 $33.96 $96.03
Electric Lineman 6/2/2025 $65.10 $34.45 $99.55
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67
Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47
Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00
Laborers (Class 01 - See notes) 5/1/2026 $41.65 $27.90 $69.55
Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 02 - See notes) 5/1/2026 $41.85 $27.90 $69.75
Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 03 - See notes) 5/1/2026 $41.85 $27.90 $69.75
Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80
Laborers (Class 04 - See notes) 5/1/2026 $36.45 $27.90 $64.35
Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85
Laborers (Class 05 - See notes) 5/1/2026 $42.50 $27.90 $70.40
Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90
Laborers (Class 06 - See notes) 5/1/2026 $42.55 $27.90 $70.45
Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75
Laborers (Class 07 - See notes) 5/1/2026 $42.40 $27.90 $70.30
Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 08 - See notes) 5/1/2026 $42.15 $27.90 $70.05
Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35
Laborers (Class 09 - See notes) 5/1/2026 $42.00 $27.90 $69.90
Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/15/2026 Page 5 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Laborers (Class 10- See notes) 5/1/2026 $42.15 $27.90 $70.05
Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40
Laborers (Class 11 -See Notes) 5/1/2026 $42.05 $27.90 $69.95
Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10
Laborers (Class 12 -See Notes) 5/1/2026 $42.85 $27.90 $70.75
Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13
Laborers (Class 13 -See Notes) 5/1/2026 $45.78 $27.90 $73.68
Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70
Laborers (Class 14 -See Notes) 5/1/2026 $41.90 $27.90 $69.80
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2026 $35.52 $19.83 $55.35
Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83
Laborers Utility (PGW ONLY) 5/1/2026 $42.55 $19.83 $62.38
Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33
Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.52 $34.49 $89.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.67 $35.34 $91.01
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.52 $35.38 $92.90
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.68 $36.22 $94.90
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.27 $34.42 $88.69
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.43 $35.26 $90.69
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.29 $35.29 $92.58
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.44 $36.14 $94.58
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2025 $50.18 $33.22 $83.40
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.34 $34.06 $85.40
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2025 $49.88 $33.13 $83.01
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.04 $33.97 $85.01
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2025 $48.16 $32.62 $80.78
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2026 $49.32 $33.46 $82.78
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2025 $47.17 $32.33 $79.50
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2026 $48.34 $33.16 $81.50
Operators Class 07 (A) - See Notes (Building, Heavy, 5/1/2025 $66.26 $39.55 $105.81
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/15/2026 Page 6 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Highway)
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.73 $40.48 $108.21
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2025 $65.97 $39.46 $105.43
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.44 $40.39 $107.83
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76
Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61
Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76
Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2024 $66.80 $42.93 $109.73
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62
Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18
Truckdriver class 1(see notes) 5/1/2026 $38.42 $23.87 $62.29
Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28
Truckdriver class 2 (see notes) 5/1/2026 $38.52 $23.87 $62.39
Truckdriver class 3 (see notes) 5/1/2026 $38.77 $23.87 $62.64
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 10/15/2026 Page 7 of 7
File details come from the government source that posted it. Updated .