This document contains a specification for disinfecting potable water tanks on NOAA ships. The specification outlines general requirements including diluting and introducing chlorine treatment solution only through a sounding tube or threaded connection. It provides a disinfect procedure of filling the tank with potable water until overflow, introducing chlorine solution to reach 100 parts-per-million Free Available Chlorine for at least four hours, and draining and refilling if the level drops below 50 parts-per-million. A related federal contract opportunity is for FY22 RFQ for drydock repairs of the NOAA Ship RONALD H. BROWN, solicited by the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Attachment D.3 Past Performance Questionnaire REV 1.docx DOCX document
Amendment 0001.pdf PDF
Attachment D.2 Past Performance Information Form REV 1.docx DOCX document
RFQ RONALD H. BROWN DRYDOCK REPAIRS REVISION 1.pdf PDF
073-6932898.pdf PDF
BROWN Register of Lifting Appliances and Loose Gear_2020.pdf PDF
Portable Fire Extinguisher List.pdf PDF
Attachment D.1 RONALD H. BROWN FY 22 DRYDOCK SPEC PACKAGE.pdf PDF
RB Ventilation Manual Closure List.pdf PDF
TM RB 573-02.pdf PDF
RB-245 Vol I.pdf PDF
AIRMAR 12Hz Transducer Drawing.pdf PDF
RB-461A-07 Multibeam Fairing Construction REV Ar.pdf PDF
Righting Device Inspection Form Blank.pdf PDF
181-6932834.pdf PDF
Alfa Laval PureBallast Technical Manual.pdf PDF
101-6932801.pdf PDF
183-6932837.pdf PDF
RB-245 Vol II.pdf PDF
528-6932928.pdf PDF
101-6932805.pdf PDF
573-6932840.pdf PDF
Tech Manual RB-573-05 Sect. 1_2.pdf PDF
997-1A.pdf PDF
NOAA_RHB_480VAC_SWBD_ONLY_RED.pdf PDF
RB-085-001.pdf PDF
000-1F.pdf PDF
RB-568-00_Bow Thruster Tech Man Sect 2.pdf PDF
00-631-001 PAINT SCHEDULE.pdf PDF
501-6932918.pdf PDF
Attachment D.5 Price Schedule.xlsx XLSX spreadsheet
Tech Manaul 167-00.pdf PDF
101-6932815.pdf PDF
Motor Inventory_NOAA Ship BROWN.xls XLS spreadsheet
101-6932819.pdf PDF
573-1C.pdf PDF
Attachment D.3 Past Performance Questionnaire.docx DOCX document
573-6932841.pdf PDF
RB-529-002.pdf PDF
101-6932804.pdf PDF
171-6932832.pdf PDF
Attachment D.6 NOAA AIRS PROCESS.pdf PDF
Tank Capacity Summary.pdf PDF
631-3B.pdf PDF
101-6932813.pdf PDF
635-2.pdf PDF
300-6932772 One Line.pdf PDF
000-2C.pdf PDF
Switchboard Breakers Info.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-533-1

AUGUST 1991

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-533-1

POTABLE WATER TANK DISINFECTION

1. SCOPE. This specification contains the general requirements for disinfecting potable water tanks on NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 General Requirements.

3.1.1 When introducing chlorine treatment solution to a

potable water tank, ensure that the solution is diluted and is introduced only through a sounding tube or threaded connection.

Immediately after adding the treatment solution, add a rinse consisting of at least five gallons of potable water through the same sounding tube or threaded connection.

3.1.2 Isolate the tank(s) from the rest of the potable

water service system and thoroughly rinse and drain the tank interiors.

3.2 Disinfect Procedure.

3.2.1 Fill the potable water tank with potable water until

it overflows, exercising care not to pressurize the tank. As it fills, introduce sufficient chlorine solution to provide at least 100 parts-per-million (ppm) Free Available Chlorine (FAC) content in the completely filled tank.

3.2.2 Monitor the FAC content hourly for at least four

hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to the tank to bring the FAC content back up to 100 ppm and begin the four-hour period anew. Continue until the FAC content remains at or above 50 ppm for a four-hour period.

3.2.3 If more than one tank is to be disinfected, repeat

the above procedure for the other tank. At the contractor's discretion, the same water used to disinfect the first tank may

AMC-533-1

AUGUST 1991

be used, as long as the initial FAC content in the second tank is increased to 100 ppm at the start of the four-hour test period.

3.2.4 Drain the tank(s) and refill with potable water.

Repeat the above tests, except that an initial FAC content of

1.0 ppm or greater shall be provided, the monitoring period shall be 30 minutes, and the minimum allowable FAC content shall be

0.2 ppm.

3.2.5 After successfully completing the 30-minute test

period, drain and refill the tank(s) with potable water until the total FAC content falls to 1.0 ppm or less.

END OF SPECIFICATION