517-25-291 Drawings Final.pdf

PDF 27 MB Posted

Attached to
Z1DA--SPS Equipment Site Preparation (VA-25-00046418) | EDA: 6/5/25
Solicitation number
36C24525B0007
Issued by

About this file

These architectural drawings detail the SPS (Sterile Processing Services) Equipment Site Preparation project for the Beckley VA Medical Center located at 200 Veterans Avenue in Beckley, West Virginia. The project involves renovating an existing basement area (specifically rooms BC-108K, BA-103, and surrounding spaces) to prepare for new medical equipment installation, including detailed demolition and infrastructure modification requirements. Key technical specifications include: ceiling height verification (currently 7'-6"), infrastructure pipe relocation, equipment removal, and potential ceiling height adjustments to accommodate new sterilization equipment.

The project documentation (Drawing Number 517-25-291) provides comprehensive site plans, basement layouts, existing equipment plan and elevation views, and photographic documentation. Critical contractor requirements include: maintaining medical center operations during renovation, working primarily 12:00 PM Friday through 4:30 PM Monday to minimize disruption, coordinating with VA Safety Officer, protecting air intake systems, keeping roadways accessible, and ensuring patient safety throughout the construction process. The project is part of solicitation 36C24525B0007 through the Department of Veterans Affairs Veterans Health Administration, with a targeted completion date of June 5, 2025.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG

NO.18

BLDG

NO.10

BUILDING NO.7

BUILDING NO.1

V

ETERA

N S A

V E

B

LD

G N

O .6

BLDG

NO.22

Lo w er P ar ki ng L ot

V

ET

ER

A

N S

D R

IV

E

To R

T.

BLDG. 1

BLDG. 1

G ra ve l l ot

St af f p ar ki ng

BLDG NO. 17

Salt Pit Shed

Eqip. Storage Shed

Metal Storage Bldg.'s

BLDG. 8

Secu rity

Peri mete r R oa d

Se cu rit y

Pe rim et er

R oa d

Secu rity

Peri mete r R oa d

FENCE

FENCE

FE

N

C E

FENCE

FE

NCE

FENCE

FENCE

FEN

CE

FENCE

Shelter #1

BLDG

NO.20

BLDG

NO.23

BLDG

NO.12

BLDG

NO.16

M et al S to ra ge B ld g.

BLDG

NO.11

Po lic e

Trai nin g

Equ ip.

Decon

NO.32 NO.31

NO.33

NO.34

N O

.2

NO.30

N O

.2

N O

.2

TLO

F

-2"

+4 '-6

F.

E

F.E

BLDG

NO.35

BLDG. 8

A

G R

A N

V

ILLE

FIFTH ST.

M cC

LU

R

E

ST

RA

N

D O

LP

H

S T.

CLAYTON ST.PERSHING ST.

A V

E.

CITY BOUNDARY

BURGESS

O A

K W

O O

D

KOINER ST.

ST

CARTER ST.

200 VETERANS AVENUE

D.V.A. MEDICAL CENTER

BECKLEY WV 25801

M

ER

C

ER

ST.

WHITESTICK CREEK

VETERANS DR.

V

ET

ER

A

N S

AVE.

ED

G

EW

O

O D

D R

CROSS ST.

EDGEWOOD DR.

JU

N

C

TI

O N

S

TR

EE

T

FRANCIS LN.

FO

R

D S

T.

NIXON

SOUTH

STREET

HART

ST.

M

ERCER

COLLEGE AVENUE

LE

E

ST

AVE.

A V

EN

U

E

RALEIGH AVE.

ST

V

IR

G

IN

IA

CITY A

VENUE

CENTRAL AVE.

BECKLEY

BELLEVUE

ALT

IVAN

STREET

FOURTH

CENTRAL

BENCH LN.

AVENUE

V

IR

G

IN

IA

S

T.

AVE.

PINE ST.

MEADOWS CT.

A V

E.

TH

IR

D

C O

N W

A Y

S T.

FI

R

ST

A V

E. SECOND

STADIUM

PARK AVE.

FREEM

A

N

ST.LA.

A W

N A

V E.

ST.

FR

A

N K

LIN

DRAWING TITLEDRAWING #

COVER SHEET / SITE PLANG-001

1. ALL WORK SHALL COMPLY WITH ANY REQUIRED BUILDING CODES, REGULATIONS, REQUIREMENTS

AND PERMITS THAT HAVE BEEN ADOPTED BY THE LOCAL, STATE OR FEDERAL AUTHORITIES

HAVING JURISDICTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH THE

APPROPRIATE SECTIONS OF THE BUILDING CODES AND TO OBTAIN ANY NECESSARY PERMITS.

2. THE INFORMATION SHOWN REGARDING EXISTING CONDITIONS ON ALL DRAWINGS AND AS NOTED ELSEWHERE WERE BASED ON FIELD OBSERVATIONS AS OF DECEMBER 2024. THE CONTRACTOR IS

RESPONSIBLE TO MAKE A SITE VISIT TO FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO SUBMITTING A BID. DRAWINGS ARE NOT TO SCALE AND SHOULD NOT BE

SCALED FOR DIMENSIONS.

3. THE CONTRACTOR MUST HAVE PRIOR APPROVAL FROM THE COR FOR LOCATION OF MATERIAL

STORAGE AREAS, EQUIPMENT SETUP SITES AND STAGING AREAS FOR ALL DEMOLITION AND NEW

WORK. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE

VETERAN PATIENTS, VETERAN FAMILIES, MEDICAL CENTER STAFF AND THE MEDICAL CENTER

STRUCTURE DURING CONSTRUCTION. THE CONTRACTOR SHALL KEEP THE MEDICAL CENTER

CLEAN AND FREE OF CONSTRUCTION DEBRIS AT ALL TIMES.

4. NORMAL MEDICAL CENTER WORK HOURS ARE 7:00 AM TO 5:00 PM MONDAY THRU FRIDAY.

CONTRACTOR WORK IS TO BE PERFORMED 12:00 PM FRIDAY THRU 4:30 PM MONDAY TO MITIGATE

SPS DOWN TIME. ALTERATIONS TO THIS SCHEDULE CAN BE SUBMITTED TO THE COR FOR

CONSIDERATION. ALL UTILITY SHUT DOWNS MUST BE COORDINATED WITH THE COR PRIOR TO THE

OCCURRENCE. ALL UTILITY SHUT DOWNS SHALL BE IN STRICT ACCORDANCE WITH MEDICAL

CENTER POLICIES AND THE SPECIFICATIONS. CONTRACTOR WILL BE RESPONSIBLE TO ENSURE AIR INTAKES IN AREA OF CONSTRUCTION WILL BE MAINTAINED / PROTECTED TO PREVENT NOXIOUS

ODORS AND CONTAMINANTS FROM ENTERING THE HOSPITAL. ALL AIR HANDLER OPERATIONS,

INCLUDING ALTERNATIVE INTAKE DUCTS, WILL BE COORDINATED IN ADVANCE BETWEEN THE VA

SAFETY OFFICER / COR AND THE CONTRACTOR PRIOR TO WORK TAKING PLACE TO ENSURE AIR

QUALITY AND PROMOTE PATIENT SAFETY WITHIN THE HOSPITAL

5. CONTRACTORS ARE TO KEEP ALL ROADWAYS AND ENTRANCES TO THE MEDICAL CENTER OPEN

AND ACCESSIBLE AT ALL TIMES, UNLESS APPROVED BY THE COR.

6. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT A FINISHED PROJECT. THEY DO NOT

INDICATE METHODS OF CONSTRUCTION OR SPECIFIC PRODUCTS. SOME SPECIFICATIONS DO

ALLOW FOR A SPECIFIC OPTION OR CHOICE. IT SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO SUBMIT HIS SPECIFIC OPTION OR CHOICE FOR APPROVAL PRIOR TO

IMPLEMENTATION.

7. THE DRAWINGS ARE DIAGRAMMATICAL AND SHOW THE INTENT OF WORK TO BE COMPLETED. THE

CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS TO RENDER A

COMPLETE WORKING SYSTEM AS REQUIRED FROM THE CONTRACT. ANY ERRORS OR OMISSIONS

SHOULD BE REPORTED TO THE COR.

8. THE GOVERNMENT HAS SALVAGE RIGHTS TO ANY AND ALL EQUIPMENT OR MATERIAL BEING

REMOVED UNDER THIS CONTRACT AS DIRECTED BY THE COR.

9. ANY EVENING AND NIGHT WORK SHALL BE APPROVED BY THE COR BEFORE THE OCCURANCE.

EVENING AND NIGHT WORK MUST BE COMPLETED AND WORK AREAS CLEANED BY 5:00 AM EACH

MORNING. VETERAN PATIENTS, VISITORS AND STAFF BEGIN ARRIVING FOR DAILY CLINICS AT 6:00

AM. CONTRACTOR SHALL NOT BE PERMITTED TO CLOSE DOWN AREAS DURING NORMAL HOURS OF

OPERATION UNLESS AS COORDINATED WITH AND APPROVED BY THE VA FACILITY LEADERSHIP.

10. LIGHTNING PROTECTION SYSTEMS WILL BE PROTECTED AND LEFT INTACT DURING

CONSTRUCTION. DAMAGES DURING CONSTRUCTION WILL BE REPAIRED BY THE CONTRACTOR AT

NO COST TO THE GOVERNMENT.

BASEMENT LAYOUTA-001

A-002 A-003 A-004

SPS WORK AREA AND CURRENT EQUIPMENT LOCATION

SPS PHOTOS 1

SPS PHOTOS 2

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

G-001

COVER SHEET / SITE PLAN BECKLEY VAMC - SPS EQUIPMENT

SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM SB

FINAL CONSTUCTION

DOCUMENTS

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

200 VETERANS AVENUE

BECKLEY, WV 25801

PROJECT No. 517-25-291

SPS Equipment Site Preparation

FOR

CONSTRUCTION

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text

EXISTING CONCRETE RAMP

AutoCAD SHX Text

BLDG. # 5

AutoCAD SHX Text

BLDG. # 4

AutoCAD SHX Text

BLDG. # 3

AutoCAD SHX Text

BLDG. # 2

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

CONCRETE SIDEWALK

AutoCAD SHX Text

DI

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text Gate ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/DECIDUOUS_TREE_6_PV.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg ftp://image.autodesk.com/drawing/SHRUB_5.dwg AutoCAD SHX Text 13 PS (Parking Structure)

AutoCAD SHX Text o

AutoCAD SHX Text 2316.8

AutoCAD SHX Text 2351.6

AutoCAD SHX Text 2349.8

AutoCAD SHX Text 2349.8

AutoCAD SHX Text 2352.6

AutoCAD SHX Text 2341.8

AutoCAD SHX Text 2339.8

AutoCAD SHX Text 2331.8

AutoCAD SHX Text 2347.7

AutoCAD SHX Text 2346.7

AutoCAD SHX Text 2349.1

AutoCAD SHX Text N

AutoCAD SHX Text

%%ULOCATION MAP

AutoCAD SHX Text

%%UPROJECT DRAWING INDEX

AutoCAD SHX Text %%uGENERAL NOTES

BASEMENT

BUILDING 1

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

A-001

BASEMENT LAYOUT BECKLEY VAMC - SPS

EQUIPMENT SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM SB

FINAL CONSTUCTION

DOCUMENTS

FOR

CONSTRUCTION

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP DN

AutoCAD SHX Text

ROLLING SHUTTER

AutoCAD SHX Text

ROLLING SHUTTER

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

FEMALE STAFF

AutoCAD SHX Text

WASH RM

AutoCAD SHX Text

BA-125

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

BC-101B

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BB-123D

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

BB-116A

AutoCAD SHX Text

ELECTRICAL CLOSET

AutoCAD SHX Text

BB-117A

AutoCAD SHX Text

CHEMICAL

AutoCAD SHX Text

SPILL KIT

AutoCAD SHX Text

BC-104E

AutoCAD SHX Text

HAZARDOUS WASTE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-104A

AutoCAD SHX Text

FEMALE

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

BC-108D

AutoCAD SHX Text

SPRINKLER

AutoCAD SHX Text

RM

AutoCAD SHX Text

MALE / FEMALE

AutoCAD SHX Text

STAFF TOILET

AutoCAD SHX Text

BB-110

AutoCAD SHX Text

ETO STERILIZATION

AutoCAD SHX Text

BC-108K

AutoCAD SHX Text

MALE LOCKER

AutoCAD SHX Text

BA-102

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BA-101A

AutoCAD SHX Text

POST OFFICE

AutoCAD SHX Text

BA-100

AutoCAD SHX Text

MALE / FEMALE

AutoCAD SHX Text

STAFF TOILET

AutoCAD SHX Text

BC-106

AutoCAD SHX Text

CABINET

AutoCAD SHX Text

DECONTAMINATION

AutoCAD SHX Text

EQUIP STORAGE

AutoCAD SHX Text

AREA

AutoCAD SHX Text

BB-104

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BC-108H

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-111C

AutoCAD SHX Text

ANATOMICAL

AutoCAD SHX Text

PATHOLOGY

AutoCAD SHX Text

TEACHING FACILITY

AutoCAD SHX Text

MENS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

BB-116B

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

BC-113

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

MECH AREA

AutoCAD SHX Text

BB-103

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

BB-123

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-107C

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BB-123C

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

PS-1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

PS-2

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BA-109C

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BA-109A

AutoCAD SHX Text

OPTICAL RM

AutoCAD SHX Text

BA-109B

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

BA-109

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BA-110

AutoCAD SHX Text

HSK /

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

BA-111

AutoCAD SHX Text

STAIR WAY

AutoCAD SHX Text

- 6

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

PROTECTION

AutoCAD SHX Text

SPRINKLER

AutoCAD SHX Text

RM

AutoCAD SHX Text

BA-112

AutoCAD SHX Text

PRINTER RM

AutoCAD SHX Text

BA-117

AutoCAD SHX Text

WORK RM

AutoCAD SHX Text

BA-118

AutoCAD SHX Text

STAIR WAY

AutoCAD SHX Text

- 5

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-112A

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

BC-112

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

HSK

AutoCAD SHX Text

BC-111B

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-111A

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

BC-111

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BC-111D

AutoCAD SHX Text

RETAIL

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-114A

AutoCAD SHX Text

HC MENS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

BA-106

AutoCAD SHX Text

HC WOMENS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

BA-104

AutoCAD SHX Text

RETAIL STORAGE

AutoCAD SHX Text

BA-105

AutoCAD SHX Text

ABATOR

AutoCAD SHX Text

RM

AutoCAD SHX Text

BA-103A

AutoCAD SHX Text

RETAIL

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-114

AutoCAD SHX Text

BC-114A

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

BC-115

AutoCAD SHX Text

BC-108I

AutoCAD SHX Text

DECONT

AutoCAD SHX Text

BA-103

AutoCAD SHX Text

HSK

AutoCAD SHX Text

BA-108C

AutoCAD SHX Text

STEAM RM

AutoCAD SHX Text

BC-108H

AutoCAD SHX Text

DUMB

AutoCAD SHX Text

WAITER

AutoCAD SHX Text

BC-108C

AutoCAD SHX Text

SPD STORAGE

AutoCAD SHX Text

BC-108

AutoCAD SHX Text

HSK

AutoCAD SHX Text

BC-108A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-108B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-108E

AutoCAD SHX Text

BREAK

AutoCAD SHX Text

OUT

AutoCAD SHX Text

RM

AutoCAD SHX Text

BC-109

AutoCAD SHX Text

SPD SUPV

AutoCAD SHX Text

BC-110

AutoCAD SHX Text

MAIL SORTING

AutoCAD SHX Text

RM

AutoCAD SHX Text

BA-101

AutoCAD SHX Text

MAIL RM

AutoCAD SHX Text

BA-100A

AutoCAD SHX Text

VENDING

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STAIR WAY

AutoCAD SHX Text

- 3

AutoCAD SHX Text

PHARMACY

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-107D

AutoCAD SHX Text

STAIR WAY

AutoCAD SHX Text

- 7

AutoCAD SHX Text

BC-107

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

BC-104D

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

BC-104

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-2

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-3

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-1

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

PROTECTION

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

PROT

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

BB-121

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BA-119

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

RM

AutoCAD SHX Text

BC-100

AutoCAD SHX Text

HOUSE KEEPING

AutoCAD SHX Text

MEETING RM

AutoCAD SHX Text

BC-101

AutoCAD SHX Text

HOUSE KEEPING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-101A

AutoCAD SHX Text

LINEN STORAGE

AutoCAD SHX Text

BC-102

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

PROTECTION

AutoCAD SHX Text

LINEN STORAGE

AutoCAD SHX Text

BC-102B

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

PROTECTION

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BB-123D

AutoCAD SHX Text

NUTRITION

AutoCAD SHX Text

CARTS

AutoCAD SHX Text

BB-139

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-138

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

BC-104F

AutoCAD SHX Text

SEWING

AutoCAD SHX Text

RM

AutoCAD SHX Text

BC-103

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-137

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-137A

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BB-136

AutoCAD SHX Text

DRY STOCK

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-105A

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-105A

AutoCAD SHX Text

SPD OR

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

BC-105

AutoCAD SHX Text

NOURISHMENT

AutoCAD SHX Text

STORAGE RM

AutoCAD SHX Text

BB-132

AutoCAD SHX Text

SALAD

AutoCAD SHX Text

PREPARATION

AutoCAD SHX Text

RM

AutoCAD SHX Text

BB-133

AutoCAD SHX Text

SUPERVISORS

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BB-123A

AutoCAD SHX Text

HSK

AutoCAD SHX Text

BB-123B

AutoCAD SHX Text

NUTRITION AND

AutoCAD SHX Text

FOOD SVC CHIEF

AutoCAD SHX Text

BB-124A

AutoCAD SHX Text

DIETICIAN OFFICE

AutoCAD SHX Text

BB-124

AutoCAD SHX Text

AUDIO BOOTH

AutoCAD SHX Text

HEARING TEST RM

AutoCAD SHX Text

BB-120A

AutoCAD SHX Text

BB-126A

AutoCAD SHX Text

OFFICE CUBICLES

AutoCAD SHX Text

BB-126

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-134A

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-134

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-134B

AutoCAD SHX Text

CHIEF

AutoCAD SHX Text

INFORMATION

AutoCAD SHX Text

OFFICER

AutoCAD SHX Text

BB-125A

AutoCAD SHX Text

ENTRANCE

AutoCAD SHX Text

BB-125

AutoCAD SHX Text

OFFICE CUBICLES

AutoCAD SHX Text

BB-127

AutoCAD SHX Text

OFFICE CUBICLES

AutoCAD SHX Text

BB-128

AutoCAD SHX Text

SERVER RM

AutoCAD SHX Text

BB-129

AutoCAD SHX Text

TELEPHONE SWITCH RM

AutoCAD SHX Text

BB-130

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

RM

AutoCAD SHX Text

BB-135

AutoCAD SHX Text

SPD STORAGE

AutoCAD SHX Text

BC-105B

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-104G

AutoCAD SHX Text

CHEMICAL

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-104B

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BC-104C

AutoCAD SHX Text

SPD STORAGE

AutoCAD SHX Text

BA-121

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BA-124

AutoCAD SHX Text

BA-122

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BA-123

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BB-120

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BB-131

AutoCAD SHX Text

AUDIO BOOTH

AutoCAD SHX Text

HEARING TEST

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BB-119

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BB-118

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BB-117

AutoCAD SHX Text

STAIR WAY

AutoCAD SHX Text

- 2

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

BB-116

AutoCAD SHX Text

AH - 1 ENGG

AutoCAD SHX Text

MAINTENANCE RM

AutoCAD SHX Text

BB-115

AutoCAD SHX Text

ELECTRICAL VAULT RM

AutoCAD SHX Text

BB-113

AutoCAD SHX Text

EMERGENCY GENERATOR RM

AutoCAD SHX Text

BB-114

AutoCAD SHX Text

HSK

AutoCAD SHX Text

BB-111

AutoCAD SHX Text

EQUIP CLEANING

AutoCAD SHX Text

RM

AutoCAD SHX Text

BB-100

AutoCAD SHX Text

EQUIP

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BB-101

AutoCAD SHX Text

MECH RM

AutoCAD SHX Text

BB-102

AutoCAD SHX Text

STAIR WAY - 1

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text

CHUTE

AutoCAD SHX Text

BB-105

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BB-106

AutoCAD SHX Text

AUTOPSY

AutoCAD SHX Text

BB-107

AutoCAD SHX Text

FREEZER

AutoCAD SHX Text

BB-108

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BB-112

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BB-109

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

OPEN TO OUTSIDE

AutoCAD SHX Text

BA-101B

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BA-126

AutoCAD SHX Text

IRM

AutoCAD SHX Text

BA-126A

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

BA-115C

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

BA-115

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

BA-115A

AutoCAD SHX Text

LOCKER

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

MENS

AutoCAD SHX Text

RESTROOM

AutoCAD SHX Text

BA-113

AutoCAD SHX Text

BA-114A

AutoCAD SHX Text

BA-114B

AutoCAD SHX Text

MENS

AutoCAD SHX Text

LOCKER ROOM

AutoCAD SHX Text

BA-114

AutoCAD SHX Text

HEARING TEST RM

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 14'-4"

AutoCAD SHX Text

BA-120D

AutoCAD SHX Text

BREAK

AutoCAD SHX Text

RM

AutoCAD SHX Text

BA-120I

AutoCAD SHX Text

BA-120E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BA-120F

AutoCAD SHX Text

VAULT

AutoCAD SHX Text

BA-120B

AutoCAD SHX Text

CUSTOMER

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

BA-120

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

BA-115E

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

BA-115D

AutoCAD SHX Text

SHOWER

AutoCAD SHX Text Office

AutoCAD SHX Text Managers

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BA-120A

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BB-122A

AutoCAD SHX Text

BB-122

AutoCAD SHX Text

AUDIO BOOTH

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-107F

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-107E

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

WINDOW

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

BC-107G

AutoCAD SHX Text

BC-107

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

BC-107H

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text

BC-107I

AutoCAD SHX Text

WAREHOUSE

NOT TO SCALE

LEGEND

CURRENT EQUIPMENT

WORK AREA

SINK

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

A-002

SPS WORK AREA AND CURRENT

EQUIPMENT LOCATION

BECKLEY VAMC - SPS

EQUIPMENT SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM SB

FINAL CONSTUCTION

DOCUMENTS

FOR

CONSTRUCTION

AutoCAD SHX Text

ETO STERILIZATION

AutoCAD SHX Text

BC-108K

AutoCAD SHX Text

MALE LOCKER

AutoCAD SHX Text

BA-102

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BC-108H

AutoCAD SHX Text

HC WOMENS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

BA-104

AutoCAD SHX Text

MECH

AutoCAD SHX Text

BA-103A

AutoCAD SHX Text

BC-108I

AutoCAD SHX Text

SPS DECONT

AutoCAD SHX Text

BA-103

AutoCAD SHX Text

HSK

AutoCAD SHX Text

BA-108C

AutoCAD SHX Text

CART WASH

AutoCAD SHX Text

DUMB

AutoCAD SHX Text

WAITER

AutoCAD SHX Text

BC-108C

AutoCAD SHX Text

SPS

AutoCAD SHX Text

PREP & PACK

AutoCAD SHX Text

CORRIDOR BA1

LEGEND

CURRENT

WATER/STEAM/SEWER

PIPES AND OTHER

INFRASTRUCTURE

NOTES

· DRAWINGS NOT TO SCALE.

· NEW EQUIPMENT WILL BE INSTALLED IN

EXISTING EQUIPMENT'S LOCATION.

· SINK IDENTIFIED IN THE DRAWINGS WILL

NEED TO BE MOVED TO A DIFFERENT

LOCATION IN DECON

· CURRENT PIPES RUN IN DESIGNATED

AREA AND ABOVE STERILIZERS.

· CONTRACTOR SHALL FIELD VERIFY PIPE

LOCATIONS AND TO DETERMINE ALL

INFRASTRUCTURE THAT MAY NEED TO

BE MOVED, ADDED, OR REPLACED FOR

NEW EQUIPMENT.

· CEILING HEIGHT MAY NEED RAISED TO

ACCOMMODATE NEW EQUIPMENT.

· MEASURED CEILING HEIGHT IS 7'-6".

HOWEVER, CEILING HEIGHT MAY VARY

DEPENDING ON EXACT LOCATION.

· CONTRACTOR SHALL FIELD VERIFY

CEILING HEIGHT WHEN NECESSARY.

· SEE DRAWING G-001 FOR PROJECT

GENERAL NOTES.

STERILIZERS

SINK

EXISTING EQUIPMENT PLAN VIEW

· IT IS HIGHLY ADVISABLE FOR THE

CONTRACTOR TO COMPLETE A SITE VISIT

TO VERIFY THE NECESSARY AMOUNT OF

DEMOLITION.

· CONTRACTOR SHALL REMOVE AND

DISPOSE OF ALL NECESSARY MATERIALS

INCLUDING BUT NOT LIMITED TO:

EXISTING EQUIPMENT, PIPING, FLOORING,

WALL MATERIALS, AND WALL

PROTECTION.

· CONTRACTOR SHALL BE RESPONSIBLE

FOR COMPLETE DEMOLITION REMOVAL

AS PER THE SPECIFICATIONS.

· KEEP WORK AREAS CLEAN AND FREE OF

DEBRIS AND BUILD-UP.

· SEE DRAWING G-001 FOR PROJECT

GENERAL NOTES.

DEMOLITION NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

A-003

SPS EXISTING EQUIPMENT PLAN

VIEW

BECKLEY VAMC - SPS

EQUIPMENT SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM SB

FINAL CONSTUCTION

DOCUMENTS

FOR

CONSTRUCTION

AutoCAD SHX Text

PARTS WASHER

AutoCAD SHX Text

PARTS WASHER

AutoCAD SHX Text

ACCESS PANEL

EXISTING DECON ELEVATION VIEW

EXISTING PREP&PACK ELEVATION VIEW

STERILIZERS

SINK

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

A-004

SPS EXISTING EQUIPMENT

ELEVATION VIEW

BECKLEY VAMC - SPS

EQUIPMENT SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM SB

FINAL CONSTUCTION

DOCUMENTS

FOR

CONSTRUCTION

AutoCAD SHX Text

ACCESS PANEL

AutoCAD SHX Text

PARTS WASHER

AutoCAD SHX Text

PARTS WASHER

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

A-005

SPS PHOTOS 1 BECKLEY VAMC - SPS

EQUIPMENT SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM BB

FINAL CONSTUCTION

DOCUMENTS

FOR

CONSTRUCTION

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C:

\U se rs\

V.

A rch ite ct

\D oc um en ts\

7-

-5

_R en ov ate

U

SP

7-

0_

AR

CH

_R

_tk ov ats

EN

RS

5.r vt 3/2

6/2

1 1 :42

:37 P

M

A-006

SPS PHOTOS 2 BECKLEY VAMC - SPS

EQUIPMENT SITE PREPARATION

200 VETERANS AVE, BECKLEY WV 25801

517-25-291

01/22/2025 JM SB

FINAL CONSTUCTION

DOCUMENTS

FOR

CONSTRUCTION

Sheets and Views
G-001 - Cover Sheet-Site Plan_1_14924_185985c7.sv$-Layout1
Unsaved Drawing1-Basement Layout
Unsaved Drawing1-SPS Work Area
Unsaved Drawing1-SPS EXISTING EQUIPMENT PLAN VIEW
Unsaved Drawing1-SPS EXISTING EQUIPMENT ELEVATION VIEW
Unsaved Drawing1-Site Photos 1
Unsaved Drawing1-Site Photos 2

File details come from the government source that posted it. Updated .