About this file

This is a cost sheet attachment for a Request for Proposals issued by Salt Lake City Corporation for Fire Training Tower Maintenance services under solicitation number SLCI27003. The cost sheet serves as the formal pricing document that offerors must complete to submit their proposal for providing fire training tower maintenance services. The contract has a five-year lifecycle, and all costs necessary to maintain the requirements outlined in the Scope of Work (SLCI27003 Attachment 2) must be included in the cost submission.

The cost sheet requires offerors to provide pricing for two primary cost categories: Planned Preventative Support Costs (which include fees, number of visits per year, and proposed costs per support visit) and Unplanned (Corrective) Technical Support costs (which include hourly rates for labor, travel time, parts and materials as a percentage, economy airfare if applicable, and other charges). The total proposed costs, which will be calculated and highlighted in green on the cost sheet, will serve as the evaluation criterion, with the lowest total proposed cost determining the award. All yellow-highlighted cells are designated for offeror input, and any blank cells or zero entries will be interpreted by the City as indicating services are provided at no cost or built into another line item. Deviation from the prescribed cost sheet format may result in proposal disqualification, and any costs not provided on this document will not be allowed into the resulting contract.

View the file

Other files

File Type Posted
7-SLCI27003 Attachment 4 Score Sheet.xls XLS spreadsheet
6-SLCI27003 Fire Training Tower RFP.docx DOCX document
3-SLCI27003 Attachment 2 Scope of Work.docx DOCX document
2-Confidential+and+Proprietary+Info+Declaration+Form.pdf PDF
8-SLCI27003 Attachment 5 Photos.pdf PDF
1-SLCI25024.docx DOCX document
4-SLCI27003 Attachment 1 Sample Agreement.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Sheet

Attachment 3: Cost Sheet
FIRE TRAINING TOWER MAINTENANCE
Solicitation # SLCI27003

Offeror Name:

Costing Considerations & Instructions
1. All cells in a yellow highlight allow for a Offeror input.
2. Cost will be evaluated based on the lowest Total Proposed Costs (cell F17 and Highlighted in GREEN) for the work required to meet the requirements listed in SLCI27003 Attachment 2 Scope of Work.
3. Technical Requirements and Cost Proposals must be reflective of one another. All costs necessary to maintain the requirements listed in the SLCI27003 Attachment 2 Scope of Work for the contract's five (5) year life cycle must be included on this Cost Schedule form.
4. If zero is entered for any cell or if any cell is left blank, the City will assume that the related services are either provided at no cost or built into another cost item. If a cost category is not applicable, enter N/A.
5. Any cost not provided on this Cost Schedule, will not be allowed into the resulting contract. If you identify a cost that cannot be properly captured in this Cost Schedule, then provide suggestions for modifying this Cost Schedule to the Q&A board for this solicitation.
6. Any deviation from this format may result in disqualification of Offeror's proposal.
Planned Preventative Support Costs
FeesNumber of VisitPer Support VisitPer year
Proposed Costs*$ - 0$ - 0
Unplanned (Corrective) Technical Support
If additional costs will be charged for unplanned (corrective) Technical Support to the proposed solution enter the hourly rates associated with such enhancements below. Insert additional lines as necessary. If zero is entered for any cell or if any cell is left blank, the City will assume that the related services are either provided at no cost or built into another cost item. This is not be scored.
Cost
Labor:/ hour
Travel time:/ hour
Parts and materials:%
Economy Airfare (if any):
Other charges (if any):

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

Attachment C - &A Page &P of &N

File details come from the government source that posted it. Updated .