5-RFP-Q Subconsultant Utilization Plan.pdf.pdf
PDF 129 KB Posted
- Attached to
- OWNER’S ADVISOR SERVICES FOR MILL CREEK WASTEWATER TREATMENT PLANT DEWATERING BUILDING IMPROVEMENTS
- Solicitation number
- RFQ 265X901115
- Issued by
- Hamilton County, Ohio
About this file
The document is a Subconsultant Utilization Plan form from the Metropolitan Sewer District of Greater Cincinnati, designed to track proposed subconsultants for a Request for Proposal/Quotation (RFP/Q) project. The form requires prime contractors to list all proposed firms, including both Small Business Enterprise (SBE) and non-SBE subconsultants, detailing their company information, federal tax ID, type of work, and subcontract percentage. The form also includes checkboxes to identify subconsultants as SBE, Minority Business Enterprise (MBE), Women Business Enterprise (WBE), or Non-S/M/D/WBE.
The document includes a notable provision that provides different calculation methods for materials or supplies obtained from SBE firms: if materials are from an SBE manufacturer, 100% of the cost counts toward SBE goals, while if materials are purchased from an SBE that is not a manufacturer, only 60% of the cost counts toward SBE goals. The form requires the prime contractor to certify the accuracy of the information and acknowledge that any changes to listed subconsultants must be reported to the MSD SBE Program prior to implementation. The document must be accurately completed, signed, and submitted with the RFP/Q submittal to ensure compliance with the district's subconsultant utilization requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Affidavit of Accuracy.docx | DOCX document | |
| 17-265X901115 QQ.docx | DOCX document | |
| 16-Att 5.docx | DOCX document | |
| 13-Att 2.docx | DOCX document | |
| 15-Att 4.docx | DOCX document | |
| 1-PA Template 9 1 2022.pdf | ||
| 12-Att 1.docx | DOCX document | |
| 11-Att 0.docx | DOCX document | |
| 4-Professional Services Small Business Enterprise Rating Rubric 11.6.19.pdf | ||
| 14-Att 3.docx | DOCX document | |
| 3-CorporateResolution2AuthorizedtoSign.doc | DOC document | |
| 18-265X901115 Addendum 1.pdf | ||
| 8-AFFIDAVIT CONCERNING AUTHORITY (template).docx | DOCX document | |
| 7-AFFIDAVIT CONCERNING AUTHORITY (Instructions).pdf | ||
| 9-RFQ 265X901115.pdf | ||
| 2-Corporate Resolution 2 Authorized to Sign - Instructions.pdf | ||
| 6-SBE Statement of Intent to Contract Perform.pdf.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGG 051019
RFP/Q Subconsultant Utilization Plan (Statement of Intent to Utilize Firms)
Page of
Company Name/Address/Contact Person/Telephone/Email Federal Tax ID# Describe Exact Type of
Work/*Supplier *Subcontract Percentage SBE MBE WBE Non-
S/M/D/WBE
Calculation (For Office Use Only)
* If the materials or supplies are obtained from an SBE manufacturer, 100% of the cost of the materials or supplies shall count toward SBE goals. If the materials or supplies are purchased from an SBE that is not a manufacturer, 60% of the cost of the materials or supplies shall count toward SBE goals.
I certify that the above information is true to the best of my knowledge. The company acknowledges and agrees that if awarded the contract, formal agreements will be executed with the companies listed above and the RFP/Q Subconsultant Utilization Plan form will be included as part of the contract. Any change in the above listed subconsultants must be reported to the MSD SBE Program prior to a change taking place.
Signature: ______ _________ Print Name: ____________________________________________ Title: _____ ______________________________________ Date: __________________
This document must be accurately completed, signed and submitted with RFP/RFQ Submittal Project Name:
RFP/Q Number (if applicable):
Company Name: Federal Tax ID#:
Address: Contact Person:
E-mail: Telephone #: Date Submitted:
The above named Consultant must list all proposed firms (both SBE and non-SBE) for the project. Failure to complete this form with all of the requested information may result in the Consultant not fulfilling the SBE utilization requirements outlined in the RFP/Q.
| Page: |
| of: |
| Project Name: |
| RFPQ Number if applicable: |
| Company Name: |
| Federal Tax ID: |
| Address: |
| Contact Person: |
| Email: |
| Telephone: |
| Date Submitted: |
| Company NameAddressContact PersonTelephoneEmailRow1: |
| Federal Tax IDRow1: |
| Describe Exact Type of WorkSupplierRow1: |
| Subcontract PercentageRow1: |
| Calculation For Office Use OnlyRow1: |
| Company NameAddressContact PersonTelephoneEmailRow2: |
| Federal Tax IDRow2: |
| Describe Exact Type of WorkSupplierRow2: |
| Subcontract PercentageRow2: |
| Calculation For Office Use OnlyRow2: |
| Company NameAddressContact PersonTelephoneEmailRow3: |
| Federal Tax IDRow3: |
| Describe Exact Type of WorkSupplierRow3: |
| Subcontract PercentageRow3: |
| Calculation For Office Use OnlyRow3: |
| Company NameAddressContact PersonTelephoneEmailRow4: |
| Federal Tax IDRow4: |
| Describe Exact Type of WorkSupplierRow4: |
| Subcontract PercentageRow4: |
| Calculation For Office Use OnlyRow4: |
| Print Name: |
| Title: |
| Date: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
File details come from the government source that posted it. Updated .