14-Att 3.docx
DOCX document 40 KB Posted
- Attached to
- OWNER’S ADVISOR SERVICES FOR MILL CREEK WASTEWATER TREATMENT PLANT DEWATERING BUILDING IMPROVEMENTS
- Solicitation number
- RFQ 265X901115
- Issued by
- Hamilton County, Ohio
About this file
This document is a Qualifications Questionnaire (QQ) for the Metropolitan Sewer District of Greater Cincinnati (MSDGC) seeking an Owner's Advisor for the Mill Creek Wastewater Treatment Plant (MCWWTP) Dewatering Building Improvements project. The request for qualifications (RFQ # 265X901115) solicits professional engineering and consulting services to support the project through planning, design, and construction phases. The selected consultant will initially develop a Business Case Evaluation (BCE), finalize project criteria, assist with design-builder procurement, and provide technical and project management support throughout the project lifecycle.
The project requires a detailed narrative response of no more than 5 pages, addressing the offeror's ability to manage project phases, identify critical milestones, assess risks, manage budget and schedule, and ensure quality control. The narrative must demonstrate the consultant's capability to advocate for the City while maintaining professional relationships with consultants and contractors. Key evaluation criteria include project approach, specific project issues, staffing qualifications, schedule acceleration, and responsiveness to the owner. The project has an aggressive regulatory-driven timeline, and the selected advisor will be expected to expedite planning and design phases while providing comprehensive technical and management support.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Affidavit of Accuracy.docx | DOCX document | |
| 17-265X901115 QQ.docx | DOCX document | |
| 16-Att 5.docx | DOCX document | |
| 13-Att 2.docx | DOCX document | |
| 15-Att 4.docx | DOCX document | |
| 1-PA Template 9 1 2022.pdf | ||
| 12-Att 1.docx | DOCX document | |
| 11-Att 0.docx | DOCX document | |
| 4-Professional Services Small Business Enterprise Rating Rubric 11.6.19.pdf | ||
| 3-CorporateResolution2AuthorizedtoSign.doc | DOC document | |
| 18-265X901115 Addendum 1.pdf | ||
| 5-RFP-Q Subconsultant Utilization Plan.pdf.pdf | ||
| 8-AFFIDAVIT CONCERNING AUTHORITY (template).docx | DOCX document | |
| 7-AFFIDAVIT CONCERNING AUTHORITY (Instructions).pdf | ||
| 9-RFQ 265X901115.pdf | ||
| 2-Corporate Resolution 2 Authorized to Sign - Instructions.pdf | ||
| 6-SBE Statement of Intent to Contract Perform.pdf.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSDGC QUALIFICATIONS QUESTIONNAIRE FOR RFQ # 265X901115
OWNER’S ADVISOR SERVICES FOR MILL CREEK WASTEWATER TREATMENT PLANT DEWATERING BUILDING IMPROVEMENTS
(Note: Project Approach and Management = 20%)
Instructions for Narrative: Provide no more than 5 pages of narrative single-spaced in 12-point font on 8 ½ x 11 sheets with 1-inch margins.
General Information:
The Offeror shall describe their ability as an Owner’s Advisor to provide all professional engineering and related consulting services, as identified in Section 1.4 Scope of Services, to support the referenced project during the planning, design, and construction phases. The narrative shall address the offeror’s ability to organize and perform tasks in each phase of the project, identify critical milestones and ensure progress, address contingencies that may arise during the project, facilitate project risk assessment, manage the project budget, schedule and scope, and ensure quality control. It is important for the Offeror to demonstrate their ability to advocate for the City while maintaining professional relationships with consultants and construction contractors during the project. The Offeror shall also demonstrate their ability to help the City make important decisions during the project by collecting and interpreting technical information from the design consultant and construction contractor.
The narrative shall be prepared for the specific scope of work described in this RFQ and address the following:
· General Approach: The Offeror shall outline how the project team will be organized and managed to provide the professional engineering and related consulting services in the planning, design, and construction phases of the project as identified in the RFQ and complete all deliverables in a timely fashion, in accordance with the scope of work.
· Project Specific Issues. The Project Approach and Management narrative shall be customized for the RFQ scope of work. It shall include specific project issues and design criteria and how the Offeror will address them during the work. It shall include how the Offeror will respond to potential challenges and/or important issues during the project.
· Qualified and Appropriate Staffing: The narrative shall describe how the project will be managed and staffed to provide quality and cost-effective services. It shall describe how the project will be staffed with personnel with relevant experience and expertise. It shall describe how subconsultants and technical staff will be managed and used to provide cost-effective and efficient services. It shall describe how quality assurance and quality control will be maintained and provided to staff and subconsultants.
· Schedule: The Project Approach and Management narrative shall explain how the Offeror shall expedite and accelerate the schedule for planning and design faster than the normal planning and design durations. The project will have an aggressive schedule though planning and design phases which are of paramount importance to MSDGC from a regulatory perspective. Offeror shall be required to adhere to the schedule.
· Responsiveness to Owner: The Offeror shall outline the approach to be taken to facilitate the Engineer of Record / Owner’s Advisor services for the project and provide the deliverables in a timely fashion, in accordance with the scope of the RFQ.
MSDGC QUALIFICATIONS QUESTIONNAIRE FOR RFQ # 265X901115
OWNER’S ADVISOR SERVICES FOR MILL CREEK WASTEWATER TREATMENT PLANT DEWATERING BUILDING IMPROVEMENTS
PROJECT APPROACH AND MANAGEMENT (ATTACHMENT 3 TO RFQ)
Deviation of the submitted QQ from compliance with the Attachment 3 instructions and requirements may render the Offeror’s submittal as “non-responsive” by the City.
File details come from the government source that posted it. Updated .