4-Professional Services Small Business Enterprise Rating Rubric 11.6.19.pdf
PDF 110 KB Posted
- Attached to
- OWNER’S ADVISOR SERVICES FOR MILL CREEK WASTEWATER TREATMENT PLANT DEWATERING BUILDING IMPROVEMENTS
- Solicitation number
- RFQ 265X901115
- Issued by
- Hamilton County, Ohio
About this file
This document is a Small Business Enterprise (SBE) Participation Professional Services Rating Rubric developed by the Metropolitan Sewer District (MSD) of Cincinnati, outlining a detailed scoring system for evaluating vendor proposals with respect to Small Business Enterprise participation. The rubric provides a comprehensive 20-point scoring framework across three main categories: Achievement of the Advertised SBE Goal (maximum 10 points), RFP/Q Subconsultant Utilization Plan (maximum 5 points), and Statement of Intent to Contract and Perform (maximum 5 points).
The scoring criteria are designed to incentivize and reward vendors who not only meet the advertised SBE participation goals but also exceed them, work with new SBE subconsultants, and provide clear, accurate documentation of their subconsultant utilization plans. Vendors can earn additional points for exceeding the SBE participation goal by up to 2%, submitting complete and accurate forms, listing all proposed subconsultants, ensuring SBE firms are certified for the specific type of work, providing specific percentage commitments, and including first-time SBE subconsultant relationships or first-time SBE prime contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Affidavit of Accuracy.docx | DOCX document | |
| 17-265X901115 QQ.docx | DOCX document | |
| 16-Att 5.docx | DOCX document | |
| 13-Att 2.docx | DOCX document | |
| 15-Att 4.docx | DOCX document | |
| 1-PA Template 9 1 2022.pdf | ||
| 12-Att 1.docx | DOCX document | |
| 11-Att 0.docx | DOCX document | |
| 14-Att 3.docx | DOCX document | |
| 3-CorporateResolution2AuthorizedtoSign.doc | DOC document | |
| 18-265X901115 Addendum 1.pdf | ||
| 5-RFP-Q Subconsultant Utilization Plan.pdf.pdf | ||
| 8-AFFIDAVIT CONCERNING AUTHORITY (template).docx | DOCX document | |
| 7-AFFIDAVIT CONCERNING AUTHORITY (Instructions).pdf | ||
| 9-RFQ 265X901115.pdf | ||
| 2-Corporate Resolution 2 Authorized to Sign - Instructions.pdf | ||
| 6-SBE Statement of Intent to Contract Perform.pdf.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSD SBE Participation Professional Services Rating Rubric Page 1
Updated 11/6/2019
Small Business Enterprise (SBE) Participation
Professional Services Rating Rubric
Selection Criteria
General
To count towards the advertised SBE participation goal during the proposal review process, a SBE must hold a current SBE certification from an MSD approved agency at the time of proposal review.
Points may be deducted if a requested form is incomplete and/or contains inaccuracies.
Scoring is at the discretion of the individual rater.
1. Achievement of the Advertised SBE Goal (Maximum 10 points; option for up to 2 additional points)
# Criteria
Advertised SBE Goal Met Example
Goal Met Goal Not Met
The vendor’s proposed certified SBE participation meets the advertised SBE participation goal. No points will be awarded if the goal is not met.
10 points 0 points
Advertised SBE Goal Exceeded Example
One additional point will be assigned for every 2% increase in proposed SBE utilization above the advertised SBE participation goal, not to exceed 2 points.
Proposed SBE subconsultant(s) must provide a scope of work MSD deems necessary to the project. The additional point(s) may not be awarded if it is determined that an SBE subconsultant’s scope of work is not necessary to the project and/or may be negotiated out of the final project agreement.
2% above advertised goal
1 additional point awarded
4% above advertised goal
2 additional points awarded
MSD SBE Participation Professional Services Rating Rubric Page 2
2. RFP/Q Subconsultant Utilization Plan (Statement of Intent to Utilize Firms) (Maximum 5 points)
# Criteria a.
Form Submitted with Proposal Example
Submitted Not Submitted
Form must be submitted with vendor’s proposal in order to receive points.
Up to 5 points 0 points b.
Submission of an Accurate and Complete Form
Example
All Criteria Met Some Criteria
Met
All requested fields on the form are fully and accurately completed.
5 points Less than 5 points c.
All Proposed Firms Disclosed Form lists all proposed subconsultant firms (both SBE and non-SBE certified).
d.
SBE Firms Certified to Perform the Type of Work / Supplier Listed A specific type of work / supplier must be listed for each proposed subconsultant.
Vendor should ensure that the type of work / supplier listed on the form for each SBE firm matches a commodity code listed on the SBE firm’s certification. Vendor may list specific commodity code(s) on the form.
e.
Specific Subconsultant Percentage Provided Form must include specific numeric percentage for each proposed subconsultant in order to receive points.
Does not include ambiguous language (i.e. To Be Determined or +/-).
MSD SBE Participation Professional Services Rating Rubric Page 3
3. Statement of Intent to Contract and Perform (Maximum 5 points)
# Criteria a.
Form(s) Submitted with Proposal Example
Form(s) Submitted
Form(s) Not Submitted
One form for each SBE subconsultant included in vendor’s proposal must be submitted with vendor’s proposal in order to receive points.
Up to 4 points 0 points b.
Submission of an Accurate and Complete Form for each SBE subconsultant
All Criteria Met
Some Criteria Met
All required fields on the form(s) are fully and accurately completed.
4 points Less than 4 points c.
SBE Subconsultant Signature Form signed by a representative of each proposed SBE subconsultant firm.
d.
First Time SBE Subconsultant Relationship or First Time SBE Prime
Example
First Time Opportunity
Not a First Time
Opportunity
One additional point will be assigned if the vendor’s proposal includes at least one SBE subconsultant who the vendor has never worked with OR the vendor’s proposal includes at least one SBE subconsultant who has never worked on an MSD project.
Proposed SBE subconsultant must provide a scope of work anticipated in the project delivery. The additional point may not be awarded if it is determined that the SBE subconsultant’s scope of work is not required by the project and/or may be negotiated out of the final project scope.
or
One additional point will be assigned to an SBE vendor who, if awarded the contract, would be awarded its first Prime contract with MSD.
Up to 1 point
0 points
File details come from the government source that posted it. Updated .