Schedule Of Items PROJECT: Sequoia NF New Supervisor's Office 7/30/2020
| Pay Item No. |
| Item Description |
| Method of |
Measurement
| Estimated |
| Pay Unit |
| Unit Price |
| Amount |
Quantity
Base Bid Work Items (8,658 SF Building & Sitework):
| 019000-1 |
| Mobilization, General Conditions & Requirements |
| L.S.Q. |
| 1 |
| L.S. |
| 024119-1 |
| Selective Demolition of Existing Items Designated for Removal; Includes Clearing & Grubbing; Legal Debris Disposal |
| L.S.Q. |
| 1 |
| L.S. |
| 033000-1 |
| Cast-In-Place Concrete, Type A, Including Minor Concrete Structures, Walkways, Curbs & Gutters, Waterways, Inlets & Outlets, Catch Basins & Decorative |
Concrete
| 033000-2 |
| Cast-In-Place Concrete, Type B, Including Rigid Pavement Concrete Structures, Access Roads/Driveways & Pads |
| L.S.Q. |
| 1 |
| L.S. |
| 033000-3 |
| Cast-In-Place Concrete, Type C, Including Structural Slabs On Grade & Foundations |
| L.S.Q. |
| 1 |
| L.S. |
| 042200-1 |
| Concrete Unit Masonry Walls & Masonry Stone Veneer |
| L.S.Q. |
| 1 |
| L.S. |
| 060000-1 |
| Rough Carpentry & Wood Framing Work, Includes Structural Steel For Framing Work |
| L.S.Q. |
| 1 |
| L.S. |
| 060000-2 |
| Interior Architectural Woodwork, Wood Casework & Fiber Reinforced Panels |
| L.S.Q. |
| 1 |
| L.S. |
| 070000-1 |
| Thermal & Moisture Protection Work, Insulation, Air Barrier System, Roofing System & Siding |
| L.S.Q. |
| 1 |
| L.S. |
| 080000-1 |
| Building Openings Work, Doors, Windows, |
Louvers & Vents
| 090000-1 |
| Exterior & Interior Walls Finishes Work, Cement Plaster, Gypsum Board, Tile & Painting |
| L.S.Q. |
| 1 |
| L.S. |
| 090000-2 |
| Acoustical & Linear Wood Ceiling Finishes, Flooring & Carpeting Tiles With Base Work |
| L.S.Q. |
| 1 |
| L.S. |
| 100000-1 |
| Miscellaneous Specialties Equipment Work, Includes Electrical Kitchen & Projection Equipment, and Roll-Down Blinds |
| L.S.Q. |
| 1 |
| L.S. |
| 210000-1 |
| Fire Suppression Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 220000-1 |
| Building Plumbing Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 230000-1 |
| Building HVAC & Mechanical Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 260000-1 |
| Building Interior & Exterior Electrical, Communications, Electronic Safety & |
Security Work
| 310000-1 |
| Site Earthwork, Excavation & Embankment, Save Suitable Excavation, Dispose of Unsuitable Excavation & Waste Offsite, Imported Commercial Source Embankment, Engineered Fill To all Structural Pads, Finish Grading to Design Elevations, Compaction as Specified per ASTM D1557 |
| L.S.Q. |
| 1 |
| L.S. |
| 320000-1 |
| Exterior Improvements Work, Landscaping, Irrigation System, Ornamental Metal Fencing, Gates & Controls, Selected Site Outdoor Furnishings |
| L.S.Q. |
| 1 |
| L.S. |
| 321123-1 |
| 3/4-Inch Minus Crushed Aggregate Base Course From A Commercial Source |
| L.S.Q. |
| 1 |
| L.S. |
| Pay Item No. |
| Item Description |
| Method of |
Measurement
| Estimated |
| Pay Unit |
| Unit Price |
| Amount |
Quantity
| 321217-1 |
| Hot Mix Bituminous Pavement From A Commercial Source |
| L.S.Q. |
| 1 |
| L.S. |
| 331100-1 |
| Site New Water Distribution System, Complete |
| L.S.Q. |
| 1 |
| L.S. |
| 333000-1 |
| Site New Sanitary Sewer System, Complete |
| L.S.Q. |
| 1 |
| L.S. |
| 334000-1 |
| Storm Drainage System, Complete |
| L.S.Q. |
| 1 |
| L.S. |
Total Base Bid:
Add Alternative 1 Bid Work Items (West End 1,310 SF Building Addition & Communications Tower):
| 033000-3A |
| Cast-In-Place Concrete, Type C, Including |
Structural Slabs On Grade & Foundations
| 042200-1A |
| Masonry Stone Veneer |
| L.S.Q. |
| 1 |
| L.S. |
| 060000-1A |
| Rough Carpentry & Wood Framing Work, |
Includes Structural Steel For Framing Work
| 060000-2A |
| Interior Architectural Woodwork, Wood |
Casework & Fiber Reinforced Panels
| 070000-1A |
| Thermal & Moisture Protection Work, Insulation, Air Barrier System, Roofing System & Siding |
| L.S.Q. |
| 1 |
| L.S. |
| 080000-1A |
| Building Openings Work, Doors, Windows, |
Louvers & Vents
| 090000-1A |
| Exterior & Interior Walls Finishes Work, Cement Plaster, Gypsum Board, Tile & Painting |
| L.S.Q. |
| 1 |
| L.S. |
| 090000-2A |
| Acoustical & Linear Wood Ceiling Finishes, Flooring & Carpeting Tiles With Base Work |
| L.S.Q. |
| 1 |
| L.S. |
| 100000-1A |
| Miscellaneous Specialties Equipment Work, Includes Electrical Kitchen & Projection Equipment, and Roll-Down Blinds |
| L.S.Q. |
| 1 |
| L.S. |
| 210000-1A |
| Fire Suppression Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 220000-1A |
| Building Plumbing Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 230000-1A |
| Building HVAC & Mechanical Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 260000-1A |
| Building Interior & Exterior Electrical, Communications, Electronic Safety & Security Work |
| L.S.Q. |
| 1 |
| L.S. |
| 338116-1A |
| Communications Tower, Complete With Foundation (Type D Concrete), Grounding, Lightning Protection, Antennas With Cabling, and Connection to Building Communications Room |
| L.S.Q. |
| 1 |
| L.S. |
Total Bid Add Alternative 1:
Sub Total - Base + Alternative 1:
Add Alternative 2 Bid Work Items (East End 850 SF Building Addition):
| 033000-3B |
| Cast-In-Place Concrete, Type C, Including Structural Slabs On Grade & Foundations |
| L.S.Q. |
| 1 |
| L.S. |
| 042200-1B |
| Masonry Stone Veneer |
| L.S.Q. |
| 1 |
| L.S. |
| 060000-1B |
| Rough Carpentry & Wood Framing Work, Includes Structural Steel For Framing Work |
| L.S.Q. |
| 1 |
| L.S. |
| 060000-2B |
| Interior Architectural Woodwork, Wood Casework & Fiber Reinforced Panels |
| L.S.Q. |
| 1 |
| L.S. |
| 070000-1B |
| Thermal & Moisture Protection Work, Insulation, Air Barrier System, Roofing System & Siding |
| L.S.Q. |
| 1 |
| L.S. |
| 080000-1B |
| Building Openings Work, Doors, Windows, Louvers & Vents |
| L.S.Q. |
| 1 |
| L.S. |
| Pay Item No. |
| Item Description |
| Method of |
Measurement
| Estimated |
| Pay Unit |
| Unit Price |
| Amount |
Quantity
| 090000-1B |
| Exterior & Interior Walls Finishes Work, Cement Plaster, Gypsum Board, Tile & Painting |
| L.S.Q. |
| 1 |
| L.S. |
| 090000-2B |
| Acoustical & Linear Wood Ceiling Finishes, Flooring & Carpeting Tiles With Base Work |
| L.S.Q. |
| 1 |
| L.S. |
| 100000-1B |
| Miscellaneous Specialties Equipment Work, Includes Electrical Kitchen & Projection Equipment, and Roll-Down Blinds |
| L.S.Q. |
| 1 |
| L.S. |
| 210000-1B |
| Fire Suppression Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 220000-1B |
| Building Plumbing Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 230000-1B |
| Building HVAC & Mechanical Systems Work |
| L.S.Q. |
| 1 |
| L.S. |
| 260000-1B |
| Building Interior & Exterior Electrical, Communications, Electronic Safety & Security Work |
| L.S.Q. |
| 1 |
| L.S. |
Total Bid Add Alternative 2:
Sub Total - Base + Alternative 1 & 2:
Add Alternative 3 Bid Work Items (Emergency Generator System, Northeast Gravel Parking Lot, Wood Decks, Landscape Boulders):
| 263213-1C |
| Standby Emergency Power Supply System, Complete |
| L.S.Q. |
| 1 |
| L.S. |
| 310000-1C |
| Site Earthwork, Excavation & Embankment, Save Suitable Excavation, Dispose of Unsuitable Excavation & Waste Offsite, Imported Commercial Source Embankment, Engineered Fill To all Structural Pads, Finish Grading to Design Elevations, Compaction as Specified per ASTM D1557 |
| L.S.Q. |
| 1 |
| L.S. |
| 321123-1C |
| 3/4-Inch Minus Crushed Aggregate Base |
Course From A Commercial Source
| 320000-1C |
| Exterior Improvements Work, Wood Decks, Landscape Boulders |
| L.S.Q. |
| 1 |
| L.S. |
| 334000-1C |
| Storm Drainage System Work |
| L.S.Q. |
| 1 |
| L.S. |
Total Bid Add Alternative 3:
Sub Total - Base + Alternative 1, 2, & 3:
Add Alternative 4A Bid Work Items (Fixed in Place Furniture for Base Bid Building:
| 125900-1D |
| Fixed in Place Systems Furniture for 8,658 SF Base Bid Office, Furnish & Install |
| L.S.Q. |
| 1 |
| L.S. |
Add Alternative 4B Bid Work Items (Fixed in Place Furniture for West End Building Addition):
| 125900-1E |
| Fixed in Place Systems Furniture for 1,310 SF West End Office Addition (Add Alternative 1) with Changes to Base Bid Furniture Layout, Furnish & Install |
| L.S.Q. |
| 1 |
| L.S. |
Add Alternative 4C Bid Work Items (Fixed in Place Furniture for East End Building Addition):
| 125900-1F |
| Fixed in Place Systems Furniture for 850 SF East End Office Addition (Add Alternative 2), Furnish & Install |
| L.S.Q. |
| 1 |
| L.S. |
Total Bid Add Alternative 4 A, B, & C:
Total Bid - Base + Alternative 1, 2, 3, & 4: