129JGP20B0001 - Addendum 4.pdf

PDF 320 KB Posted

Attached to
129JGP20B0001 - Sequoia NF SO Construction Federal contract opportunity
Solicitation number
129JGP20B0001
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

This addendum modifies an invitation for bid for construction services. Key changes include revising specifications across multiple divisions, replacing drawings, and adding new drawings. The construction project involves a new supervisor's office for the Sequoia National Forest, including site work, buildings, and utilities. The performance location is 480 North Henrahan Street in Porterville, California, with a bid due date in September. The procurement is set aside exclusively for small businesses. Bidders must attend a pre-bid conference and site visit, submit questions by a deadline, and provide bid, payment, and performance bonds.

View the file

Other files for this federal contract opportunity

Other files attached to 129JGP20B0001 - Sequoia NF SO Construction, newest first.
File Type Posted
Davis-Bacon Act WD - Building - CA20200016.pdf PDF
129JGP20B0001 - A00008 - Wage Determination.pdf PDF
129JGP20B0001 -A00007 - RFIs - Round 5.pdf PDF
129JGP20B0001 - A00006 - RFIs - Round 4.pdf PDF
129JGP20B0001 - A00005 - Structural - Electrical.pdf PDF
A00004 - Specifications.zip ZIP file
A00004 - New Drawings - Part 1.zip ZIP file
A00004 - New Drawings - Part 2.zip ZIP file
129JGP20B0001 - RFI Official Responses - RFIs 8-26-9-1 - Round 2.pdf PDF
129JGP20B0001 - A00004 - RFIs_Drawings_Specs.pdf PDF
129JGP20B0001 - RFI Official Responses - RFIs 9-1 - Round 3.pdf PDF
A00003 - Time Extension - Window Revision.pdf PDF
129JGP20B0001 - A00002 - RFI Official Responses.pdf PDF
Amendment A00001 - FAR 52.236-1.pdf PDF
7. Fire Plan.docx DOCX document
129JGP20B0001 - Sequoia NF SO Construction - v.2.pdf PDF
8. RFI Form.docx DOCX document
1. Construction Documents Compiled Drawings - Part 2 - Final.pdf PDF
4. Davis-Bacon Act WD # CA20200021 07_24_2020.pdf PDF
6. Divisional Breakdown.doc DOC document
5. Schedule Of Items.doc DOC document
3. Geotechnical Report - 5_26_2020.pdf PDF
1. Construction Documents Compiled Drawings - Part 1 - Final.pdf PDF
9. Safety and Environmental Questionnaire.pdf PDF
2. Construction Documents Specifications - Final.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SQF NEW SUPERVISOR’S OFFICE

480 NORTH HENRAHAN STREET, PORTERVILLE, CA 93257

ADDENDUM NUMBER 4

[date]

SPECIFICATIONS

1. DIVISION 1, Section 01 45 00, Para. 1.04.A: Amend first sentence of Para. 1.04.A to read:

“Provide a Quality Control Manager (QCM) with no responsibilities for performing testing and inspection, managing the project, or performing operations other than managing quality control.”

2. DIVISION 06, Section 06 10 00, Para. 2.01.A.1: Amend grade of all 2x material to read No. 1.

Amend grade of all 3x, 4x material to read No. 1.

3. DIVISION 07, Section 07 46 46: Amend Para. 2.02.B.1 to read:

1. Trim shall be factory finished, Hardie ColorPlus, or equal. Wood grain texture.

4. DIVISION 07, Section 07 46 46: Amend Para. 2.01.C.1 to read:

1. Fiber-cement siding shall be factory finished, Hardie ColorPlus or equal. Finish texture shall replicate a select milled cedar plank finish See Drawings for color.

5. DIVISION 11, Section 11 52 13: Amend Para. 2.02.F.1 to read:

1. Viewing Area: H 72.5 inches x W 116 inches.

6. DIVISION 12, Section 12 59 00: Replace entire section with new Section 12 59 00, attached.

7. DIVISION 26, Section 26 08 01: Add new Section 26 08 01 – ELECTRICAL ACCEPTANCE TESTING, attached.

8. DIVISION 28, Section 28 23 00: Amend various paragraphs as follows:

a. Para. 1.09.H, amend to read:

H. Provide all manufacturers licenses for software for all cameras (8 or 10 per respective

Bid Alternate) for a period of three years from final acceptance of system.

b. Para. 2.03.F, amend to read:

F. Provide licenses for 1 computer PC server/network video recorder workstation and for all cameras (8 or 10 per respective Bid Alternate).

c. Para. 2.04.12,4), amend to read:

4) OC-PRO-1C camera licenses: Quantity 8 or 10 per respective Bid Alternate.

d. Para. 3.01.A, amend to read:

A. Furnish and install all cameras at locations shown on Drawings.

9. DIVISION 31, Section 31 00 00: Replace entire section with new Section 31 00 00, attached.

10. DIVISION 31, Section 31 23 00: Delete Section 31 23 00 – EXCAVATION AND FILL in its entirety. [Refer to Section 31 00 00.]

11. DIVISION 32, Section 32 31 19, Para. 2.02.C: Amend to read:

C. Horizontal wood slats: 1 inch x 6” Grade 2 or Tight Knotty western red cedar. Finish all surfaces with #1 Deck Premium Semi-Transparent Wood Stain/Sealer, or equal. Fasteners galvanized or stainless steel.

12. DIVISION 33, Section 33 81 16: Amend two paragraphs as follows:

a. Para. 1.04.B: Delete Para. 1.04.B in its entirety. [ISO certification not required.]

b. Para. 1.07.A: Delete Para. 1.07.A in its entirety. [ISO certification not required.]

DRAWINGS

1. DRAWING C2.1: At Details 1, 2, 3 and 4, delete reference to Spec Section 31 23 00. [All subgrade preparation is covered in Spec Section 31 00 00.]

2. DRAWING A2.7: Add note to Wall Type W5a to read:

NOTE: AT OFFICE 127, PROVIDE RC-1 RESILIENT CHANNELS AT 24” O.C. ON ONE

SIDE OF WALL PER GA FILE NO. WP 3007.

3. DRAWING A6.1: Delete original Drawing A6.1. Replace with revised Drawing A6.1, dated

08/31/20, attached.

4. DRAWING A8.1: Delete original Drawing A8.1. Replace with revised Drawing A8.1, dated

08/31/20, attached.

5. DRAWING A9.2: Delete original Drawing A9.2. Replace with revised Drawing A9.2, dated

08/31/20, attached.

6. DRAWING A10.4: Add note to Detail 4 to read:

NOTE: PROVIDE FULL HEIGHT SOUND INSULATED WALLS, INCLUDING STUD

FRAMING, ACOUSTIC BATTS AND TAPED GWB BOTH SIDES TO UNDERSIDE OF

ROOF SHEATHING AT THE FOLLOWING ROOMS:

107 125 108 127 109 130 122 131 124 132

7. DRAWING A10.7: Delete original Drawing A10.7. Replace with revised Drawing A10.7, dated 08/31/20, attached.

8. DRAWING S2.1: Delete original Drawing S2.1. Replace with revised Drawing S2.1, dated

09/02/2020, attached.

9. DRAWING S2.1.1: Delete original Drawing S2.1.1. Replace with revised Drawing S2.1.1, dated 09/02/2020, attached.

10. DRAWING S2.1.2: Delete original Drawing S2.1.2. Replace with revised Drawing S2.1.2, dated 09/02/2020, attached.

11. DRAWING S2.2: Delete original Drawing S2.2. Replace with revised Drawing S2.2, dated

09/02/2020, attached.

12. DRAWING S2.2.1: Delete original Drawing S2.2.1. Replace with revised Drawing S2.2.1, dated 09/02/2020, attached.

13. DRAWING S2.2.2: Delete original Drawing S2.2.2. Replace with revised Drawing S2.2.2, dated 09/02/2020, attached.

14. DRAWING S2.4: Delete original Drawing S2.4. Replace with revised Drawing S2.4, dated

09/02/2020, attached.

15. DRAWING S3.1: Delete original Drawing S3.1. Replace with revised Drawing S3.1, dated

09/02/2020, attached.

16. DRAWING S3.2: Delete original Drawing S3.2. Replace with revised Drawing S3.2, dated

09/02/2020, attached.

17. DRAWING S3.3: Delete original Drawing S3.3. Replace with revised Drawing S3.3, dated

09/02/2020, attached.

18. DRAWING S3.4: Delete original Drawing S3.4. Replace with revised Drawing S3.4, dated

09/02/2020, attached.

19. DRAWING S3.5: Delete original Drawing S3.5. Replace with revised Drawing S3.5, dated

09/02/2020, attached.

20. DRAWING S4.1: Delete original Drawing S4.1. Replace with revised Drawing S4.1, dated

09/02/2020, attached.

21. DRAWING S4.3: Delete original Drawing S4.3. Replace with revised Drawing S4.3, dated

09/02/2020, attached.

22. DRAWING S4.4: Delete original Drawing S4.4. Replace with revised Drawing S4.4, dated

09/02/2020, attached.

23. DRAWING S6.1: Delete original Drawing S6.1. Replace with revised Drawing S6.1, dated

09/02/2020, attached.

24. DRAWING S6.2: Delete original Drawing S6.2. Replace with revised Drawing S6.2, dated

09/02/2020, attached.

25. DRAWING S6.3: Delete original Drawing S6.3. Replace with revised Drawing S6.3, dated

09/02/2020, attached.

26. DRAWING S6.4: Delete original Drawing S6.4. Replace with revised Drawing S6.4, dated

09/02/2020, attached.

27. DRAWING S6.5: Delete original Drawing S6.5. Replace with revised Drawing S6.5, dated

09/02/2020, attached.

28. DRAWINGS E1.0, E1.1: Add numbered note flag 2 to (e) joint utility pole, proposed SCE utility transformer pad, 4” telephone service per AT&T, and primary and secondary power service conduits.

29. DRAWINGS E2.0, E2.1, E2.2, E2.3: At the main entrance locate two (2) G type lights

(exterior sconce) to be centered above the information display cases; refer to the architectural plans.

30. DRAWING E2.2: Delete original Drawing E2.2. Replace with revised Drawing E2.2, dated

09/02/2020, attached.

31. DRAWING E3.2: Add two system furniture power feed locations in Ecosystem Management

Staff #128 for workstations #8, #9, #10, and #11 as designated on Drawing A2.3.1 The furniture power feed boxes shall be floor mounted adjacent to corresponding system furniture low voltage floor boxes shown on Drawing E4.2. From the panel “P” bring circuits #52 and

#54 to one box, and #56 and #58 to the other box. Coordinate exact location before rough in.

32. DRAWINGS E4.0, E4.1, E4.2: Provide interior intrusion alarm keypad in Hall #114 by the exit door.

33. DRAWINGS E4.1, E4.2: Provide intrusion alarm keypad in Lobby #100 by the main entrance door.

34. DRAWINGS E4.1, E4.2: Add numbered note flag #6 to all intrusion alarm motion sensors.

35. DRAWINGS E4.1, E4.2: Delete keypad located in Administrative Staff #126.

36. DRAWING E4.2: Ecosystem Management Staff #128, two floor system furniture boxes with numbered note flag 16. Revise the flag to read 1.

37. DRAWINGS E5.0, E5.1, E5.2: Delete 4#600KCMIL wiring from the SCE pad mounted transformer to the main switchboard. The Contractor shall provide two (2) 4” conduits;

secondary power service wiring is by the utility co. (SCE).

38. DRAWINGS E5.3, 5.4, 5.5: Minimum symmetrical AC interrupting capacity shall be 10k.

39. DRAWING E5.5: New Panel Schedule “P” – revise circuits #52 and #54 to read “Furniture

Feed”; revise circuits #56 and #58 from PFB to 20/1 circuit breakers, and revise load serve to read “Furniture Feed”. Revise circuits #60 and #62 from PFB to spare 20/1 circuit breakers.

40. DRAWING E6.2: Cable runs description; revise first sentence (“coordinate exact type with the Owner prior to bid”) to read “Cable – refer to antenna schedule below.”

ADDENDUM DRAWINGS

1. Add 8 ½” x 11” Drawing dated 09/02/2020, titled Detail 3/S1.3, attached.

2. Add 8 ½” x 11” Drawing dated 09/02/2020, titled Detail 1/S4.2, attached.

3. Add 8 ½” x 11” Drawing dated 09/02/2020, titled Detail 1/ADD3 – Pole Base Mounting Detail, attached.