About this file
This document provides details for a federal solicitation for construction services. The solicitation seeks a contractor to construct a new Sequoia National Forest Supervisor's office in Porterville, California, including general construction, site work, utilities, foundations, framing, exterior finishes, civil, mechanical, plumbing, electrical, fire protection, and telecommunications. A pre-bid conference will be held on August 25, 2020, with bids due prior to a to be determined date. The procurement is set aside entirely for small businesses. The current Davis-Bacon wage determination is provided. Interested vendors must submit any request for information by September 1, 2020. Bonds will be required. The project value is estimated between $5 million to $10 million.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00005
GREGORY L. CUNNINGHAM
129JGP20B0001 - Sequoia NF SO Construction - Amendment A00005.
The purpose of this solicitation amendment is to post the documents detailed on page 2, SF30 continuation page in follow up to A00004.
USDA FOREST SERVICE
NEVADA CITY CA 95959
631 COYOTE STREET
ATTN: GREGORY CUNNINGHAM
R5 CENT-CAL ACQ SERV AREA CCASA
ALL INTERESTED VENDORS 129JGP20B0001
1 5
09/07/2020
08/05/2020
AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 2
CONTINUATION PAGE
CONTRACT NO:
129JGP20B0001
ORDER NO:
AMENDMENT NO:
A00005
14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)
STANDARD FORM 30 (CONTINUATION)
A. The purpose of this solicitation amendment is to incorporate changes as follows;
a. The following documents shall be included in any resultant awarded contract;
i. Electrical_SNF ADD #4 POLE BASE DETIAL
ii. Structural_2020-09-03_USFS-SQNF_ADDENDA #2_SIGNED_Addendum Drawings
B. All other terms, conditions, provisions, and clauses remain unchanged.
///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////
| 129JGP20B0001 - A00005 - Structural - Electrical |
| A00005 |
| SF 30 Continuation Page |
| Electrical_SNF ADD #4 POLE BASE DETIAL |
| Structural_2020-09-03_USFS-SQNF_ADDENDA #2_SIGNED_Addendum Drawings |
File details come from the government source that posted it. Updated .