5-Attachment I - Performance Bond for Public Works over 100,000.pdf

PDF 16 KB Posted

Attached to
ITB - Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 - for the Harris County Flood Control District (CDBG-DR GLO)
Solicitation number
26/0100
Issued by
Harris County, Texas

About this file

This is a Performance Bond document for public works contracts exceeding $100,000, applicable to Harris County, Texas, and required pursuant to Texas Government Code 2253.001, et seq. The bond pertains to the Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 project for the Harris County Flood Control District (Project ID B509-04-00-E002). The performance bond serves as a guarantee that the principal contractor will comply strictly with all provisions of the underlying construction contract and will execute the work in conformity with contractual specifications.

The bond establishes joint and several liability between the principal contractor and a corporate surety, binding both parties to indemnify Harris County for any losses or damages resulting from the contractor's failure to perform. The surety is granted five business days following notice of default to assume control of the contract and complete or sublet the work in strict accordance with contract terms, with failure to do so resulting in immediate forfeiture of that right. The bond amount and specific contract details, including execution date and job number, are to be completed upon execution. The surety must maintain a registered agent in Texas authorized to accept service of process, and the bond requires County Commissioner Court approval prior to becoming effective, as certified by the Deputy County Clerk.

View the file

Other files

File Type Posted
30-Attachment MM - Report File, Phase II Environmental Site Assessment.pdf PDF
21-Attachment V - Project Signs and Plaques.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
12-Attachment G - Contractor Profile.pdf PDF
13-Attachment A - Bid Addenda Acknowledgement.pdf PDF
16-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
22-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
33-Attachment U - Project Manual.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
28-Attachment KK - Report File, SWPPP.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
18-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
6-Attachment K - Payment Bond.pdf PDF
29-Attachment LL - Report File, Phase I Environmental Site Assessment.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
25-Attachment II - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal IFB General Conditions and Specifications - Construction.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
11-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
27-Attachment JJ - Report File, Geotechnical Investigation Report.pdf PDF
32-Attachment S - Plans and Drawings.pdf PDF
23-Attachment GG - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
4-Attachment F - References.pdf PDF
15-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
14-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
24-Attachment HH - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
20-Attachment Q - Section 3 Bid Requirements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment I

PERFORMANCE BOND FOR PUBLIC WORKS CONTRACTS OVER $100,000

BOND NO._________________

Public Works Contracts Over $100,000 – Pursuant to Texas Government Code 2253.001, et.seq, as amended

STATE OF TEXAS

COUNTY OF HARRIS

KNOW ALL MEN BY THE PRESENTS:

That address: phone: , hereinafter called the Principal;

and _______________________address: ________________________ phone: ________________, a corporation;

existing under and by virtue of the laws of the State of _______________ and authorized to do an indemnifying business in the State of Texas, and whose principal office is located in the City of __________________State of _____,whose registered agent residing in the State of Texas, authorized to accept service in all suits and actions brought within said State, is (name):__________________________ address: _________________________________ hereinafter called Surety, are held and firmly bound unto the County of Harris, State of Texas, in the full sum of Dollars ($ ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators executors successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the day of , 20___ to:

Job No.

which contract is hereby referred to and made a part hereof as fully and to the same extent as fully and to the same extent as if copied at length herein.

The Principal and the Surety hereon each agree, bind and obligate himself and themselves to pay to the County of Harris, Texas, all loss or damage to it occasioned by reason of failure of the Principal to comply strictly with each and every provision contained in said contract and agreement, and further agree, bind and obligate themselves to save and keep harmless the County of Harris from any and all damages expense and claims of every kind and character which the County of Harris may suffer directly or indirectly, as a result of the execution of the contract herein secured.

If the said Principal shall fail to comply with any of the contract to such an extent that it shall be forfeited or abandoned by him, or declared abandoned or suspended by the County, then said Surety shall have the right and privilege within five (5) days after the date of notice of such action from the County, to assume control of the contract and all work thereunder and to sublet or complete it in strict conformity with the provisions of said contract; and provided, further, that failure on the part of the Surety to do so within said five (5) days will work an immediate forfeiture of all right to thereafter assume control of the contract and the work thereunder. Failure of the County to give the Surety notice of any default neglect, or omission of the Principal shall not diminish the obligations of the Surety in any respect.

PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Texas Government Code 2253.001, et. seq, as amended, and all liabilities of this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein.

IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of__________________, 20___.

(Principal)

I certify that the Commissioner's ____________________________________ Court approved this Bond on (Corporate Surety)

By: ___________________________________ Deputy County Clerk (Attorney-in-fact) Address: _________________________________

Phone: ________________________________

STATE OF TEXAS

File details come from the government source that posted it. Updated .