32-Attachment S - Plans and Drawings.pdf

PDF 54 MB Posted

Attached to
ITB - Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 - for the Harris County Flood Control District (CDBG-DR GLO)
Solicitation number
26/0100
Issued by
Harris County, Texas

About this file

This file consists of plans and drawings for the Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2, a project managed by the Harris County Flood Control District in Texas (Project ID B509-04-00-E002). The attachment provides detailed technical specifications and visual representations necessary for bidders to understand the scope of construction work required for this stormwater detention facility. The plans and drawings serve as essential reference documents that establish the baseline design, site conditions, and construction requirements that contractors must follow to meet project specifications. These documents are fundamental to the invitation to bid (ITB) process and enable qualified contractors to prepare accurate cost proposals and construction methodologies.

The plans and drawings attachment is funded through Community Development Block Grant - Disaster Recovery (CDBG-DR) funds administered by the Texas General Land Office (GLO). This funding source designates the project as disaster recovery infrastructure and establishes specific compliance requirements for contractors. Bidders must review these technical documents in conjunction with the ITB specifications and scope of work to ensure comprehensive understanding of all construction obligations, site constraints, and design requirements before submitting their proposals.

View the file

Other files

File Type Posted
30-Attachment MM - Report File, Phase II Environmental Site Assessment.pdf PDF
21-Attachment V - Project Signs and Plaques.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
12-Attachment G - Contractor Profile.pdf PDF
13-Attachment A - Bid Addenda Acknowledgement.pdf PDF
16-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
22-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
33-Attachment U - Project Manual.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
28-Attachment KK - Report File, SWPPP.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
18-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
6-Attachment K - Payment Bond.pdf PDF
29-Attachment LL - Report File, Phase I Environmental Site Assessment.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
25-Attachment II - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal IFB General Conditions and Specifications - Construction.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
11-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
27-Attachment JJ - Report File, Geotechnical Investigation Report.pdf PDF
23-Attachment GG - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
4-Attachment F - References.pdf PDF
15-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
14-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
24-Attachment HH - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
20-Attachment Q - Section 3 Bid Requirements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .