About this file

This is a safety requirements attachment document for the Harris County Flood Control District's ITB for construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 project in Texas. The document establishes mandatory heat protection and adverse weather safety requirements that all prime contractors and vendors must incorporate into their project Safety Plans. Contractors are required to include provisions addressing extreme heat, cold weather, and other adverse weather conditions to protect worker health and safety throughout project execution. When temperatures reach 90 degrees or higher, including heat index calculations, contractors must develop a project-specific Heat Awareness Plan that includes provisions for worker acclimatization, water availability, rest periods, and shade accommodations. During extended periods of adverse weather, prime contractors must provide additional accommodations as necessary to ensure worker safety from heat-related and cold-related illnesses.

Vendors acknowledge their agreement to comply with these heat protection safety requirements by signing the Bid Acknowledgement form at the time of bid submission. This requirement is non-negotiable and applies to all bidders participating in the contract opportunity. No pricing terms, set-asides, or financial details are addressed in this attachment, as it serves solely as a safety mandate governing contractor obligations and worker protection protocols for the duration of the project.

View the file

Other files

File Type Posted
30-Attachment MM - Report File, Phase II Environmental Site Assessment.pdf PDF
21-Attachment V - Project Signs and Plaques.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
12-Attachment G - Contractor Profile.pdf PDF
13-Attachment A - Bid Addenda Acknowledgement.pdf PDF
16-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
22-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
33-Attachment U - Project Manual.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
28-Attachment KK - Report File, SWPPP.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
18-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
6-Attachment K - Payment Bond.pdf PDF
29-Attachment LL - Report File, Phase I Environmental Site Assessment.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
25-Attachment II - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal IFB General Conditions and Specifications - Construction.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
11-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
27-Attachment JJ - Report File, Geotechnical Investigation Report.pdf PDF
32-Attachment S - Plans and Drawings.pdf PDF
23-Attachment GG - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
4-Attachment F - References.pdf PDF
15-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
14-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
24-Attachment HH - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
20-Attachment Q - Section 3 Bid Requirements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.