27-Attachment JJ - Report File, Geotechnical Investigation Report.pdf
PDF 56 MB Posted
- Solicitation number
- 26/0100
- Issued by
- Harris County, Texas
About this file
This is a Geotechnical Investigation Report prepared for the Harris County Flood Control District in support of the Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 project in Texas. The report documents subsurface soil and geological conditions at the project site to inform design and construction planning for the stormwater detention basins. The investigation includes soil boring data, laboratory testing results, soil classification, and geotechnical recommendations for foundation design, excavation stability, and construction considerations specific to the site's soil composition and groundwater conditions.
The report provides essential geotechnical parameters and site-specific recommendations that form the technical foundation for contractor bidding and construction execution. The findings and recommendations contained within the investigation report are critical supporting documentation for the Invitation to Bid (ITB) and will inform bid pricing, construction methodology, and project scheduling. This geotechnical data is provided to prospective bidders to ensure accurate cost estimation and feasible construction planning for the detention basin construction activities under the Harris County Flood Control District project funded through CDBG-DR GLO resources.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .