13-Attachment A - Bid Addenda Acknowledgement.pdf

PDF 124 KB Posted

Attached to
ITB - Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 - for the Harris County Flood Control District (CDBG-DR GLO)
Solicitation number
26/0100
Issued by
Harris County, Texas

About this file

This is a Bid and Addenda Acknowledgement form for an Invitation for Bid (IFB) issued by Harris County, Texas, for the Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2, a project administered by the Harris County Flood Control District and funded through CDBG-DR GLO (Community Development Block Grant - Disaster Recovery from the General Land Office). The form requires bidders to acknowledge receipt of all addenda issued with the solicitation and certify authorization to submit the bid on behalf of their organization. Bidders must attest that their bid is submitted without prior understanding, agreement, or connection with other bidders and is made in fair dealing without collusion or fraud. Additionally, bidders must confirm they have read and understand all bidding documents in their entirety and agree to provide the goods and services requested according to the published provisions of the IFB.

The form requires bidders to provide company information including DUNS number, contact details, authorized representative name and signature, and submission date. The acknowledgement includes spaces for recording up to six addenda with corresponding dates and signatures, as well as an internal use section for acceptance by Harris County Judge Lina Hidalgo. Bidders must certify that all pricing and statements provided are true, complete, and correct. The form serves as the official acknowledgement mechanism ensuring bidders have received all relevant addenda and understand their obligations under the solicitation terms.

View the file

Other files

File Type Posted
30-Attachment MM - Report File, Phase II Environmental Site Assessment.pdf PDF
21-Attachment V - Project Signs and Plaques.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
12-Attachment G - Contractor Profile.pdf PDF
16-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
22-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
33-Attachment U - Project Manual.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
28-Attachment KK - Report File, SWPPP.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
18-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
6-Attachment K - Payment Bond.pdf PDF
29-Attachment LL - Report File, Phase I Environmental Site Assessment.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
25-Attachment II - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal IFB General Conditions and Specifications - Construction.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
11-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
27-Attachment JJ - Report File, Geotechnical Investigation Report.pdf PDF
32-Attachment S - Plans and Drawings.pdf PDF
23-Attachment GG - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
4-Attachment F - References.pdf PDF
15-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
14-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
24-Attachment HH - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
20-Attachment Q - Section 3 Bid Requirements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 8.15.25 Page 1 of 1

Attachment A

BID & ADDENDA ACKNOWLEDGEMENT

Addenda Acknowledgement

As required by this solicitation, the undersigned Bidder hereby acknowledges receipt of all Addenda through and including:

Addendum Number Dated Signature

No addenda were received

Bid Acknowledgement

Handwritten ink and electronic signatures are acceptable by a corporate officer, partner, or proprietor:

I certify that this Bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a Bid for the same construction, service, or material and is in all respects fair and without collusion or fraud. I am authorized to sign this bid for the Bidder and agreed to abide by all conditions of this Invitation for Bid and certify that I have read and understand the bidding documents in their entirety. In signing this Acknowledgement, I attest that under this Bid I shall provide the goods and/or services requested in this Invitation for Bids according to the published provisions of this IFB. I confirm the Pricing provided to the County under this IFB and certify that all statements made are true, complete and correct.

Authorized Signature Date

Authorized Representative Name (First & Last):

Company Name:

Company Address:

Bidder DUNS Number:

Telephone: Fax: e-mail:

FOR INTERNAL USE

Accepted by:

HARRIS COUNTY JUDGE LINA HIDALGO

Date:

Addenda Acknowledgement
Bid Acknowledgement
Authorized Signature Date
FOR INTERNAL USE
Addendum Number 1:
Addendum Number 2:
Addendum Number 3:
Addendum Number 4:
Addendum Number 5:
Addendum Number 6:
Dated 1:
Dated 2:
Dated 3:
Dated 4:
Dated 5:
Dated 6:
Signature 3:
Signature 4:
Signature 5:
Signature 6:
No addenda were received: Off
Company Address:
Fax:
email:
Authorized Signature:
Date:
Authorized Representative Name (First & Last):
Company Name:
Bidder DUNS Number:
Telephone:
Accepted by:
Signature 2:
Signature:

File details come from the government source that posted it. Updated .