21-Attachment V - Project Signs and Plaques.pdf

PDF 397 KB Posted

Attached to
ITB - Construction of the Genoa Red Bluff Stormwater Detention Basins - Phase 2 - for the Harris County Flood Control District (CDBG-DR GLO)
Solicitation number
26/0100
Issued by
Harris County, Texas

About this file

This is a project signs and plaques specification document for the Harris County Flood Control District's Genoa Red Bluff Stormwater Detention Basin Phase 2A project. The document identifies the project commissioners, including County Judge Lina Hidalgo and Precinct Commissioners Rodney Ellis, Adrian Garcia, Tom S. Ramsey, and Lesley Briones, along with Executive Director Dr. Tina Petersen. The primary product specified is a project sign with dimensions of 96 inches by 48 inches to be displayed at the project site.

The Genoa Red Bluff Stormwater Detention Basin Phase 2A project is funded through the Texas General Land Office using Community Development Block Grant - Disaster Recovery (CDBG-DR) Program funds allocated by the United States Department of Housing and Urban Development. This funding mechanism was established to provide infrastructure restoration for communities impacted by Hurricane Harvey. The sign serves to acknowledge the funding sources and project stakeholders involved in this disaster recovery initiative.

View the file

Other files

File Type Posted
30-Attachment MM - Report File, Phase II Environmental Site Assessment.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
12-Attachment G - Contractor Profile.pdf PDF
13-Attachment A - Bid Addenda Acknowledgement.pdf PDF
16-Harris County Minimum Wage FAQs as of December 2025 - Final.pdf PDF
9-Attachment W - GLO Compliance Package.pdf PDF
22-Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
33-Attachment U - Project Manual.pdf PDF
19-Attachment P - Required Contract Provisions.pdf PDF
28-Attachment KK - Report File, SWPPP.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
18-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
6-Attachment K - Payment Bond.pdf PDF
29-Attachment LL - Report File, Phase I Environmental Site Assessment.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
25-Attachment II - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal IFB General Conditions and Specifications - Construction.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
11-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
27-Attachment JJ - Report File, Geotechnical Investigation Report.pdf PDF
32-Attachment S - Plans and Drawings.pdf PDF
23-Attachment GG - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf PDF
4-Attachment F - References.pdf PDF
15-Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
14-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
10-Attachment FF - Heat Protection Safety Requirements.pdf PDF
24-Attachment HH - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
20-Attachment Q - Section 3 Bid Requirements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMISSIONERS:

EXECUTIVE DIRECTOR: Dr. Tina Petersen, P.E.

COUNT Y JUDGE: Lina Hidalgo

GENOA RED BLUFF STORMWATER

DETENTION BASIN PHASE 2A

Rodney Ellis Precinct 1

Adrian Garcia Precinct 2

Tom S. Ramsey, P.E.

Precinct 3

Lesley Briones Precinct 4

This project is funded by the Texas General Land Office of the State of Texas to provide for the restoration of infrastructure for communities impacted by Hurricane Harvey. The funds have been allocated by the United States Department of Housing and Urban Development through the Community Development Block Grant – Disaster Recovery Program.

Sign dimensions 96" x 48"

LISA.TAUSER

Highlight

File details come from the government source that posted it. Updated .