5 1502000 C Facility Investment.pdf
PDF 421 KB Posted
- Attached to
- NSBNL Auto Doors Maintenance & Repair
- Solicitation number
- ACQR6081183
About this file
This document is a Facility Investment specification for Automatic Door Maintenance and Repair services at Naval Submarine Base New London. The specification details contractor requirements for maintaining, repairing, and servicing automatic door systems across the base and its tenant commands. Key performance objectives include developing and implementing a Preventive Maintenance (PM) program, responding to emergency, urgent, and routine service orders within specified timeframes, and ensuring all automatic door systems remain fully operational and functional.
The specification outlines three primary work categories: Recurring Work (routine maintenance and service orders), Non-recurring Work (which can be ordered via DoD EMALL or task order), and a Preventive Maintenance program. Contractors must provide all necessary labor, management, supervision, tools, and equipment. Performance standards include responding to emergency service orders within two hours, urgent service orders within five working days, and routine service orders within thirty calendar days. The contract includes provisions for a base period and four option periods, not exceeding 60 months, with an estimated initial performance period from May 1, 2025 to April 30, 2026.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1502000 – Facility Investment Table of Content Spec Item Title 1 General Information
1.1 Concept of Operations
2 Management and Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Workmanship and Material Standards
2.3.2 Historical Preservation
2.4 References and Technical Documents
3 Recurring Work
3.1 Service Orders
3.1.1 Emergency Service Orders
3.1.2 Urgent Service Orders
3.1.3 Routine Service Orders
3.2 Preventive Maintenance (PM) Program
4 Non-recurring Work
1502000 – Facility Investment Spec Item
Title Description
1 General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for facilities at Naval
Submarine Base New London.
1.1 Concept of
Operations The intent of 1502000 Facility Investment is to specify the requirements for the
Sustainment, Restoration and Modernization (SRM) sub-functions only. The SRM requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of sustainment.
The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:
Building and Structures Maintenance
- Automatic Door Systems: Naval Submarine Base NLON and tenant commands.
Item
Title Description
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.
2.2.1 Certification, Training, and Licensing
All maintenance and repair shall be performed by personnel trained and certified by the OEM.
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
2.3 Special
Requirements
2.3.1 Workmanship
and Material
Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.
Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
2.3.2 Historical
Preservation Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.
Item
Title Description
2.4 References and
Technical Documents
References and Technical Documents are listed in J-0200000-03.
Item
Title Performance
Objective Related Information Performance
Standard 3 Recurring Work The Contractor shall maintain, repair, and alter automatic doors to ensure they are fully functional and in normal working condition.
The Contractor shall develop, implement, and execute a
Service Order and Maintenance
Program, to maintain and repair facilities and installed equipment and systems.
The Contractor shall maintain all maintenance, repair and alteration data and warranty records. The KO may request a report at any time and the
Contractor shall provide the detailed report within 24 hours.
The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.
The current facility inventory for FI is provided in J-
150200001.
Automatic Door systems and equipment are in an operable condition and function properly in accordance with specified standards.
3.1 Service Orders The Contractor shall
perform service call work in a timely manner and ensure
Automatic Door systems and equipment is restored to a safe, operable condition and function properly.
The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2.
The Contractor shall schedule and perform service orders in a way that minimizes disruptions to customers and Government operations.
The Contractor shall maintain sufficient materials and equipment on hand to support service call work requirements.
Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service call work within the time limits specified.
The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the
Service call work is responded to and completed within the specified time.
Automatic Door systems and equipment are restored to operable condition and function properly in accordance with OEM specifications.
Work is accomplished per Spec Item 2.4, Workmanship and Material Standards.
When repair is complete the facility, system, or equipment does not present any hazard or danger to personnel.
Item
Title Performance
Objective Related Information Performance
Standard service order threshold is not exceeded.
Service calls are limited to a threshold of $700.00 combined labor and material.
The Contractor shall notify the
KO upon identification that the service call will exceed the threshold listed above.
If Non-recurring work is issued for repairs, the Government will only pay for the portion of labor and/or material that exceeds the service order limits.
The Contractor shall provide a daily summary of completed service calls.
The Contractor shall submit a monthly summary of completed service orders per Section F.
3.1.1 Emergency
Service Orders
The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage to Automatic Door systems and equipment, and danger to personnel.
Associated repairs are completed to ensure facilities, systems, and equipment are restored to a safe, operable condition and function properly.
The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period.
The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work immediately.
The Contractor shall remain at the work site until the emergency has been arrested.
The emergency service order is complete once the emergency has been arrested. The
Government may issue an urgent or routine service order or non-recurring work task order for the follow-on work required to repair/restore the facility, ground structure, personal property equipment or installed equipment and system.
Emergency service orders responded to within two (2) hours of receipt of call.
Emergency service orders are arrested within 24 hours of receipt of call.
Work is continued without interruption until emergent condition is arrested.
Item
Title Performance
Objective Related Information Performance Standard
3.1.2 Urgent Service
Orders The Contractor shall complete routine service orders in a timely manner and ensure Automatic
Doors and installed equipment and systems are restored to a safe, normal working condition and function properly.
The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage.
Urgent service orders are completed within five (5) working days.
3.1.3 Routine Service
Orders The Contractor shall complete routine service orders in a timely manner and ensure Automatic
Doors and installed equipment and systems are restored to a safe, normal working condition and function properly.
The Contractor shall perform routine service orders to repair deficiencies and return
Automatic Doors to normal working condition.
Performance of routine service orders is not required outside of
Government regular working hours.
Routine service orders are completed within thirty (30) calendar days.
3.2 Preventive
Maintenance (PM) Program
The Contractor shall develop and implement a PM program for Automatic
Door systems and equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall submit a
PM program to the KO for approval.
The PM program shall provide an economical approach, manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep installed equipment in normal working condition.
The Contractor shall perform any repairs up to a $150.00 deductible (no additional government payment) per PM occurrence.
Notification of repair work exceeding the PM limit shall be submitted to the KO within twenty four (24) hours of identification.
Service calls or Non-recurring work orders may be issued for repairs exceeding the PM limit.
The Contractor shall not use breakdown maintenance as part
Maintenance is accomplished in accordance with the
Contractor’s PM program and work schedule.
PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
1502000 – Facility Investment Spec Item
Title Performance
Objective Related Information Performance
Standard of the PM program.
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the
Contractor’s PM program.
These changes will be made at no additional cost to the
Government.
The Contractor shall submit monthly PM schedule per
Section F.
The Contractor shall submit an unaccomplished PM report per
Section F.
The Contractor shall assess and document equipment condition annually.
The Contractor shall submit a monthly Repair Status Report per Section F.
Item
Title Performance
Objective Related Information Performance
Standard 4 Non-recurring
Work Non-recurring work may be ordered utilizing DoD EMALL in accordance with
Section H or on a task order in accordance with the
PROCEDURES FOR
ISSUING ORDERS
clause in Section G.
The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to Non-recurring ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.
File details come from the government source that posted it. Updated .