14 NEPA.pdf
PDF 569 KB Posted
- Attached to
- NSBNL Auto Doors Maintenance & Repair
- Solicitation number
- ACQR6081183
About this file
This is a NEPA (National Environmental Policy Act) Environmental Checklist for an Automatic Doors Maintenance and Repair project at Naval Submarine Base New London in Groton, Connecticut. The project involves rewriting the existing automatic doors maintenance and repair services contract, scheduled to begin on May 1, 2025. The checklist documents environmental considerations, with most sections indicating no significant environmental impacts, categorized under a Categorical Exclusion (CATEX) #8 for routine repair and maintenance of facilities and equipment.
Key environmental requirements include potential work in the coastal zone (with no deleterious material entering storm drains or the Thames River), consultation with the Cultural Resource Manager before work at Building 883 (which is eligible for the National Register of Historic Places), and management of any regulated waste in accordance with the base's Hazardous Waste Management Plan. The project is a 100% Small Business Set-Aside with a NAICS code of 238290 and a small business size standard of $22 million, involving preventive maintenance and emergency repair services for automatic doors at the naval base and local tenant commands.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEPA ENVIRONMENTAL CHECKLIST- SUBASENLON
NEW FORM EFFECTIVE 1/1/2013. This NEPA Environmental Checklist (EC) is utilized to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form and attach a site map and a SOW or 1391. Then forward it to the PW Environmental Division. The Environmental Division will respond as soon as possible from receipt of a complete checklist and attachments. Type responses in the boxes/space provided. PLEASE NOTE: The Environmental review provided Is only valid for 1 year. If the project scope has been modified or the signed checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.
, _ _GEN�ff:Al:. 1!1!O£1E�'F l�_F.0R����N __
1 Activity Requesting:
2 Activity PQP / Phone / email:
3 Name of Project:
4 . Project Number (if any):
5 Project Locption:
6 Project Ty�e:
7 DescriptioM of the Project:
Naval Submarine Base New London Christopher Houghton, 860-694-4592, Christopher.l.houghton2.civ@us.navy.mil Automatic Doors Maintenance and Repair
NA
Naval Submarine Base New London, Groton, CT Maintenance and repairs Rewrite of Automatic Doors maintenance and repair services contract
8 Why is this project needed? Maintenance and repair of automatic doors 9 When project scheduled to begin? 01 May 2025 l P�NNIN� QU��TION!5
10a Total Project Area {sq. ft.) - (Include clear zones, soil disruption/disturbance N/A area, lay down areas, etc)
10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.) N/A
10c Percentage of Project Area - that will be Impervious once project completed N/A
10d Percentage of Project Area - that will be disturbed (excavated, graded, etc) N/A
11 How will Stormwater be managed in the long-term (post-construction)? NIA
12 How will Sanitary Sewage (wastewater) be managed in the long-term? NIA
13 Will there be actions conducted in the water (dredging, new pilings, removal N/A etc.)? If so indicate state what action(s).
14 Will there be actions conducted in an area under an Agriculture outlease? N/A
1DESIGN RELATED QUESTIONS
15 Will trees be removed?
16 Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction?
17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons?
18 Will the project remove or install an Oil Water Separator?
19 Will the project relocate excavated material at the Installation? If yes where is it going?
Will the construction / repair actions generate by-products (power washing water, haz. waste, 20 state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? lf so indicate what type of waste(s) will be generated.
21 Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering wm occur?
YES
NO UNSURE
fgl □ fgl □ fgl □ fgl □ fgl □ fgl □ fgl □
DESIGN REL:A TED QUESTIONS
22 Will there be new hard pipe connections or modifications to existing hard pipe connections usina water from Groton Utilities, the Thames, or wells?
Will new hard pipe connections or modifications to existing hard pipe connections discharge
23 wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge tvoe.
'Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action.
25 Will there be installatton, repair, modification or removal of any system containing refrigerants 'e. a. freon. halon)?
Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables surface water bodies or wetlands? If so, exolain.
Will there be any excavation and/or dewatering with the potential to impact the designated CT
27 Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can ootentiallv tmoact the coastal zone area?
New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type.
29 Will the project require pile driving?
Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what tvoe of eauioment will be installed?
Will there be any new processes or maintenance activities conducted? If so, describe what they are.
ADBITl8NAL COMMENlJ'S
Type here:
SAME
Checklist Preparer, phone number and e-mail (if Same as Question #2 - Type "SAME")
YES J
YES
NO UN�URI;
[8J □
[8J □
[8J □
[8J □
[8J □
[8J D
[8J □
[81 □
NO UNSURE
[8J □
[8J □
�1
03/27/2025
Date
�DDl1'10NAL REQIJIREMENlf$ or COMME;N1'§
Comment 1 The proposed action is within the scope of CA TEX #8: Routine repair and maintenance of buildings, facilities, vessels, aircraft, and equipment associated with existing operations and activities. None of the exclusions from reliance on a CA TEX applies in this case; therefore, the proposed action is excluded from the requirement for further NEPA analysis.
!The applicability of this CATEX determination is based on the full implementation of all environmental requirements identified below.
Requir 1 Work may occur in the coastal zone; however, a Coastal Consistency Determination is not required provided that no deleterious material enters storm drains manholes, or the Thames River.
Requir2 883 was assessed for historic significance and determined to be eligible for listing on the National Register of Historic Places as part of the Dealey Center historic district. Contact the PWD EV Division Cultural Resource Manager (x5164 before conductin!l anv work at B83.
Requir 3 Work may occur in or near an IR zone/site. No ground-disturbing activities are planned; therefore, soil management procedures are not listed. If ground-disturbing activities are required, soil management procedures will be identified in an aooroved di!l permit issued by the PWD.
Requir4 Any regulated waste generated under the scope of this project shall be managed, stored, and disposed of in accordance with the SUBASENLON Hazardous Waste Mana□ement Plan.
Environmental POC; phone number and email Signature Date