490005E7-0009-0FD7-0E92BD0F4BF1B987.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Wayfinding Signage Manufacturing and Installation
Solicitation number
RFP 2026-03-03
Issued by
Franklin County, Ohio

About this file

This is a bidders response form for RFP 2026-03-03, a wayfinding signage manufacturing and installation project for Franklin County. The document serves as a standardized questionnaire template for prospective bidders to provide detailed information about their qualifications, capabilities, and experience relevant to the project scope. Key evaluation criteria include years in business, licensing and insurance status, company location, OSHA compliance documentation, industry certifications, and portfolio examples of similar signage projects completed for comparable governmental entities or private businesses. Bidders are required to demonstrate their experience with various signage types including dimensional lettering and monument signs, designate a dedicated project manager with relevant experience credentials, and clarify whether production and fabrication services are performed in-house or subcontracted.

The response form requires bidders to address critical operational and product specifications including material properties such as UV resistance, weatherproofing, and fade resistance; the number of shop drawing revisions included in the proposal; material lead times; and workmanship warranty duration. Additional required information includes identification of signage manufacturers, the percentage of sign manufacturing completed in-house versus through subcontractors, and documentation of company licensing and insurance. This comprehensive questionnaire structure allows Franklin County to evaluate bidder qualifications systematically across technical competency, project management capacity, production capabilities, and product quality standards before award determination.

View the file

Other files

File Type Posted
E13134B7-AC80-2A6B-17903505A1365FE4.pdf PDF
7D243EA3-FAAD-CF0C-AFFD3FFE55D5912C.pdf PDF
B867E43E-FCA2-ABC6-686473D3D551080B.docx DOCX document
9124AC45-D403-5860-A4635A70C618C298.pdf PDF
1FF6D412-D5CF-E3DA-42373990EB63A4DE.docx DOCX document
48C4F0C3-D2EA-9DD6-943661FD67266514.pdf PDF
1FF81613-C943-E907-903208614AFFB273.pdf PDF
48C51FFE-B1BA-D9DA-11337A7B04016CA4.pdf PDF
1FF79148-03D3-7B1B-77CF64FD687ECA4C.pdf PDF
8F33C1D9-B606-E1D0-F77CFF24E442EF1B.pdf PDF
1FF834AF-CB60-B607-A9DD3103FF766EDA.pdf PDF
47ADF7AD-983F-9719-2E5C720D20F03E5A.xlsx XLSX spreadsheet
8BD45E27-AD3D-2A81-9DC34421F6415618.pdf PDF
98B00E89-F3C2-2215-1B6B7A585EA6B903.pdf PDF
4ADBDA30-A10A-65AC-2585EBF3396EC49F.pdf PDF
4540076D-DA44-888C-413CAB868FEC6141.xlsx XLSX spreadsheet
600B382B-92C2-EE01-36E3171A1CE23381.pdf PDF
9188FC82-07E6-2A24-E7927A56369C067A.pdf PDF
441C7CE8-FE79-FFAD-86876E5C9E330E9F.pdf PDF
477EEBB5-9B64-4073-39F4D92B43E61BB0.pdf PDF
A3F924CA-A2E1-A38A-2E6F296BD4EAE5D4.pdf PDF
1FF70774-E56E-EAC8-88A7694DAF5EB82C.pdf PDF
48C71F36-F14E-8501-2A85945F358C6068.xlsx XLSX spreadsheet
8B00ECA9-D368-AD09-80DA20EDC1915543.pdf PDF
47A070EA-AA3B-485A-6C240303241C99D2.pdf PDF
D1C78A42-D40E-4E7A-6D1A7D2FA849B7AF.pdf PDF
441CC2FC-B00B-E914-728A3B9F6E284C71.pdf PDF
1FF7330C-CAC3-999B-9E6EF28469A04621.pdf PDF
4ADC54F2-C74F-3F02-B4900398FFBEE5A5.xlsx XLSX spreadsheet
3CA5BBE9-A618-9D6F-45A1FE1B6F58F0BF.pdf PDF
47411393-E3B2-7F55-0865EAB909BEF818.xlsx XLSX spreadsheet
1FF76D77-0146-31BD-B70AC2B9310C078F.pdf PDF
6A9BE711-E1B2-9B67-147E88484CF79F1A.pdf PDF
1FF7D8D0-C608-E689-8D121B0F5CC22DA9.pdf PDF
47413282-9830-5BA4-96685E7F9A28C371.xlsx XLSX spreadsheet
A4692B9C-E659-F33F-532C87A025A11AC2.pdf PDF
9D5C4E27-A2A7-EBA2-2714B42F829186DC.pdf PDF
3D557BC1-D80F-2E25-C9390E0BF5A59073.pdf PDF
E93EE438-A2D2-AF8E-6F5941F303D00F6A.pdf PDF
9705A9CE-B76B-3514-2AB6D46F5013FD96.pdf PDF
A46910BC-E967-DD22-10B71BADEA153824.docx DOCX document
451D7EC8-9FAF-B01F-15E5F86D68AB3D4B.xlsx XLSX spreadsheet
BCCA0BAC-C5BA-CDB6-49D2EFF559EDAF11.pdf PDF
340E518F-B0A2-92CD-5CE67BE8C5C74ADC.pdf PDF
BCDA75E7-EC2E-694E-CB30EC7B8D89F683.pdf PDF
C4A97C2F-E431-1D38-75E6D603401030C8.pdf PDF
5FEA932D-A443-F834-C369AEC7AD13A552.pdf PDF
4ADC0CC3-B76B-A18D-C62DDED0F769FB5E.xlsx XLSX spreadsheet
D1C75C4E-ACBE-A700-94A3260C246A50BF.pdf PDF
E990C360-C4D7-52D4-A9F69D45175563F1.pdf PDF
Show 40 more

Latest 50 of 146 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidders Response RFP 2026-03-03 Wayfinding Signage Manufacturing and Installation – Prospective Bidder Response

RFP/Solicitation NumberRFP 2026-03-03
Project TitleWayfinding Signage Manufacturing and Installation
Bidder Organization Legal Name
1. How many years has your company been in business?
2. Is your company licensed and insured?
3. Where is your company located? This should be the primary location from which the services outlined in your proposal will be provided.
4. Provide documentation verifying OSHA compliance.
5. Provide a list of industry certifications (e.g., ISA certification).
6. Provide/show examples of signage that your company has provided and installed that are similar to the services requested in this RFP?
7. List other businesses or governmental entities comparative to Franklin County for which your company has provided similar services. Provide description of services and dates of service keys.
8. Provide a description of all types of signage including dimensional lettering, monument signs, etc., that your company has experience with.
9. Will your company provide a dedicated Project Manager for this project? Provide name(s) and description(s) of experience.
10. Do you provide in-house production & fabrication services? Please describe.
11. Are your materials UV-resistant, weatherproof, and fade resistant?
12. How many revisions are included during the shop drawing review?
13. What is the lead time on materials?
14. How long is the warranty for your workmanship?
15. Who manufactures the signage types?
16. How much of the sign manufacturing will be done in-house versus subcontracted?
Name
Title
Date

File details come from the government source that posted it. Updated .