Document_E_-_Missoula_Asbestos_Inspection_(drawings_removed).pdf

PDF 20 MB Posted

Attached to
Montana FOB/CH/PO Full Facilities Maintenance Services
Solicitation number
47PJ0018R0027
Issued by

About this file

Document E - Missoula Asbestos Inspection (drawings removed)

View the file

Other files

File Type Posted
Amendment_0005_-_Q&As.pdf PDF
Amendment_0004_-_Additional_Questions_and_Answers.pdf PDF
Document_C_-_Bozeman_Asbestos_Inspection_(drawings_removed).pdf PDF
Amendment_0003_-_Correct_Deliverable_and_Submittal_Information.pdf PDF
Revised_-_Solicitation_Sections_A-M_-_Amendment_0003.pdf PDF
Document_G_-_Battin_dates_for_next_PMs.pdf PDF
Document_B_-_Billings_Asbestos_Inspection.pdf PDF
Attachment_13_-_Pricing_Worksheet_-_OFFEROR_SHALL_VERIFY_TOTALS_ARE_CORRECT_-_Amendment_0002.xlsx XLSX spreadsheet
Document_I_-_Butte_dates_for_next_PMs.pdf PDF
Document_J_-_Missoula_dates_for_next_PMs.pdf PDF
Document_A_-_Site_Visit_Sign_in_Sheets.pdf PDF
Amendment_0002_-_Questions_and_Answers_with_Associated_Changes.pdf PDF
Document_D_-_Butte_Asbestos_Inspection_(drawings_removed).pdf PDF
Document_F_-_Excel_Equipment_List.xlsx XLSX spreadsheet
Document_H_-_Bozeman_dates_for_next_PMs.pdf PDF
Revised_-_Solicitation_Sections_A-M.pdf PDF
Attachment_14_-_Offeror_Experience_-_Amendment_0001.docx DOCX document
Amendment_0001_-_Solicitation_Changes.pdf PDF
Continuation_of_SF1449_-_Montana_FOB,_CH,_and_PO_Solicitation_-_Amendment_0001.pdf PDF
Attachment_10_-_Bozeman_FOB_and_PO_Boundary_for_Snow_Removal_and_Grounds_Maintenance.pdf PDF
Attachment_13_-_Pricing_Worksheet_-_OFFEROR_SHALL_VERIFY_TOTALS_ARE_CORRECT.xlsx XLSX spreadsheet
Attachment_14_-_Offeror_Experience.docx DOCX document
Solicitation_47PJ0018R0027.pdf PDF
Attachment_09_-_Billings_CH_Boundary_for_Snow_Removal_and_Grounds_Maintenance.pdf PDF
Attachment_01_-_Register_of_Wage_Determination_-_Collective_Bargaining_Agreement.pdf PDF
Attachment_11_-_Butte_FOB_and_CH_Boundary_for_Snow_Removal_and_Grounds_Maintennace.pdf PDF
Attachment_04_-_Secondary_Wage_Determination_2015-5399_Revision_5_dated_01.10.2018_-_Gallatin_and_Silver_Bow_County_-_Butte_and_Bozeman.pdf PDF
Attachment_12_-_Missoula_FOB_and_PO_Boundary_for_Snow_Removal_and_Gounds_Maintenance.pdf PDF
Attachment_07_-_Equipment_Inventory_List_-_Butte_FOB_and_CH,_dated_04.17.2018.pdf PDF
Attachment_05_-_Equipment_Inventory_List_-_Billings_CH,_dated_04.17.2018.pdf PDF
Attachment_06_-_Equipment_Inventory_List_-_Bozeman_FOB_and_PO,_dated_04.17.2018.pdf PDF
Attachment_15_-_Offeror_Past_Performance_Questionnaire.docx DOCX document
Attachment_03_-_Secondary_Wage_Determination_2015-5393_Revision_5_dated_01.10.2018_-_Missoula_County_-_Missoula_Builing.pdf PDF
Attachment_08_-_Equipment_Inventory_List_-_Missoula_FOB_and_PO,_dated_04.17.2018.pdf PDF
Attachment_02_-_Secondary_Wage_Determination_2015-5389_Revision_5_dated_01.10.2018_-_Yellowstone_County_-_Billings_Building.pdf PDF
2018.04.18_-_Site_Visit_Schedule_Change.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 28, 2014

Asbestos Re-Inspection Report Missoula Federal Building/Post Office/U.S. Courthouse

200 East Broadway, Missoula, MT, 59802-4530 GSA Building No.: MT0017ZZ

Prepared For:

General Services Administration/Public Buildings Services Acquisition Management Group, 8P2PQ

DFC Building 41 – Room 240 Denver, Colorado 80225

Pinyon Project No.:

1/13-346-09.8004.0015

GENERAL BUILDING and CONSULTANT INFORMATION

Client General Services Administration/Public Buildings Services

Contact Thomas Record, Regional Industrial Hygienist

Client Telephone # 303.236.2549

Facility Inspected Missoula Federal Building/Post Office/U.S. Courthouse

Facility Address 200 East Broadway, Missoula, MT, 59802-4530

Date(s) of Re-Inspection January 13-15, 2014

Building Number MT0017ZZ

Consulting Firm Name CTA Construction & Environmental, LLC. on behalf of Pinyon Environmental Inc.

Consulting Firm Address 219 Second Ave South, Great Falls, MT, 59405

Consulting Firm Telephone # 406.452.3321

Laboratory Address EMSL Analytical, Inc. - 200 Route 130 North, Cinnaminson, New Jersey, 08077

Laboratory Telephone # 800.220.3675

GENERAL BUILDING and CONSULTANT INFORMATION

Missoula Federal Building/Post Office/U.S. Courthouse 200 East Broadway Missoula, Montana

GSA Building Location Code – MT0017ZZ

Date(s) of Construction 1908 to 1952

Square Footage 144,681

Construction Brick and Stone

Structural Steel

Exterior Steel and concrete with stone and brick finishes

Interior Plaster/lathe & gypsum wallboard (GWB) combination over framing

Entrances 8

HVAC System Natural gas boiler units and forced air

Space Utilization U.S. Courthouse, Post Office, and various offices

Table of Contents

EXECUTIVE SUMMARY

1. Introduction and Scope of Work

2. Inspection Procedures

2.1 Inspection and Sampling

2.2 Laboratory Analysis

2.3 Quality Assurance and Quality Control

3. Survey Findings

3.1 Building Description

3.2 Findings

4. Conclusions and Recommendations

4.1 Conclusions

4.2 Recommendations

5. Removal Cost Estimate

6. Limitations

7. References

Appendices:

Appendix A – Figures

Figure A-1.1 – Suspect ACBM Samples and Photographs - Basement Figure A-1.2 – Suspect ACBM Samples and Photographs – First Floor Figure A-1.3 – Suspect ACBM Samples and Photographs – Second Floor Figure A-1.4 – Suspect ACBM Samples and Photographs – Third Floor Figure A-1.5 – Suspect ACBM Samples and Photographs - Attic Figure A-1.6 – Suspect ACBM Samples and Photographs - Roof Figure A-2.1a – Confirmed ACBM Flooring Materials - Basement Figure A-2.1b – Confirmed ACBM in Mechanical System Materials - Basement Figure A-2.2a – Confirmed ACBM Flooring Materials – First Floor Figure A-2.2b – Confirmed ACBM in Mechanical System Materials – First Floor Figure A-2.3a – Confirmed ACBM Flooring Materials – Second Floor Figure A-2.3b – Confirmed ACBM Wall Materials – Second Floor Figure A-2.3c – Confirmed ACBM in Mechanical System Materials – Second Floor Figure A-2.4a – Confirmed ACBM Flooring Materials – Third Floor Figure A-2.4b – Confirmed ACBM Wall Materials – Third Floor Figure A-2.4c – Confirmed ACBM in Mechanical System – Third Floor Figure A-2.5a – Confirmed ACBM in Mechanical System - Attic Figure A-2.6a – Roof

Appendix B – Tables Table B-1 – Summary of Confirmed Asbestos-Containing Materials and Recommended Response

Actions Table B-2 – Summary of Materials Confirmed Not To Contain Asbestos Table B-3 – Bulk Sample Analysis Results

Appendix C – Laboratory Analysis Report and Chain of Custody

Table of Contents (continued)

Appendix D – Photographic Log

Appendix E – Abatement Documents

Appendix F – General Inspection Information Asbestos Overview Sample Collection Requirements Material Category List Glossary

Appendix G – Inspector and Laboratory Certifications

Asbestos Re-Inspection Report Page 1 Missoula Federal Building – 200 E. Broadway, Missoula, MT February 28, 2014

EXECUTIVE SUMMARY

CTA Construction & Environmental, LLC. (CTA), on behalf of Pinyon Environmental, Inc., was retained by General Services Administration (GSA) to perform asbestos re-inspection services at the Missoula Federal Building/Post Office/U.S. Courthouse (GSA Building number MT0017ZZ), located at 200 East Broadway Street in Missoula, MT 59802-4530 (Site).

The building was constructed in 1908 to 1952. The facility inspected is a three-story, steel and concrete structure with a full basement, attic, and stone and brick finishes. It encompasses a total of 144,681 square feet of building space.

The Missoula Federal Building began its existence as a home for the forestry service and postal service. The original portion of the building was completed in 1912. In 1926, a second building was constructed to house a federal court. One year later, these two, three-story structures were connected by a two-story corridor with a greenhouse on its third floor. This connecting structure was wide enough to accommodate additional offices on one side of the first two floor corridors. In 1935, another three-story addition effectively doubled the size of the existing building to accommodate even more office spaces. New mechanical rooms were also added and connected between the building sections via ductwork and a pipe tunnel. In 1952, a one-story addition was built behind the 1927 corridor to provide the post office with additional room.

Extensive renovation activities occurred in 1976 and 1977 to revamp and update the tenant office space.

Because of the extent of this renovation, many of the same building material finishes can be seen throughout the building, regardless of the original construction date.

Typical interior floor finishes include the following: marble; terrazzo; carpet; 9” by 9” or 12” by 12” vinyl floor tiles; vinyl sheet flooring; and, wood. Under all these finishes is a concrete sub floor with a variety of leveling materials. In some areas felt is also present between the concrete and overlying flooring finish. Typical wall finishes consist of the following: concrete; brick; plaster; gypsum wallboard; and, wood paneling. Ceilings are primarily 2’ by 4’, lay-in panels suspended below original plaster ceilings, 1’ by 1’ glued on ceiling tiles, or concrete decking. Janitor closets and store rooms still have the original plaster ceilings in place. Some ceilings have 1’ by 1’ glue on tiles while gypsum wallboard ceilings are present in remodeled areas. Most rooms have either 4” or 6” vinyl base cove finishes though some of the original marble and wood bases are still in place.

The restrooms generally have ceramic tile floor finishes with ceramic tile also extending part way up the plaster or gypsum wallboard walls.

The exterior of the building is finished with granite, limestone and brick. The Post Office and Courthouse roofs have a slight pitch while the 1935 and 1952 additions exhibit flat roofs. The entire roof was refinished in 1993 and is asphalt with a gravel layer finish. Roofing materials were not sampled during this inspection but asbestos-containing materials are assumed to be present under the new roof.

Heat for the building originates from boilers located in the 1935 portion of the building. Perimeter wall heat is provided by radiant or fan coil type units. Heat pumps with fan coils provide forced-air heat to other interior spaces. In 1976, updates to the Heating, Ventilation, and Air Conditioning (HVAC) systems included the installation of many new pre and re-heat coils, heat registers, the evaporative water cooling tower, steam coils, and exhaust air ducts. In 1983, much of the piping was updated, with fiberglass insulation being installed on associated piping’s straight-runs and fittings. In 1992, a boiler replacement project converted the steam heat to hot water heat. At this time, most of the remaining asbestos-containing pipe insulation was removed as the project involved the demolition of the old steam and condensate piping, where accessible. New piping for the heating and chilled water was installed in most cases with no insulation being used. The new boilers were connected to the original breaching, which is assumed to be insulated with asbestos.

Asbestos Re-Inspection Report Page 2

February 28, 2014

Though most of the old piping has been removed, the piping in most wall cavities and pipe chases was abandoned in place. There is still original, asbestos-containing pipe insulation located in these areas as well as random locations above suspended ceilings where only portions of the original piping was replaced or re-insulated. In addition, the remaining ends of abandoned cut off steam pipes are still exposed at wall and ceiling penetrations. Some of this, as well as straight-run and fitting insulation observed in the one of the pipe chases, is in poor condition. The original asbestos-containing duct insulation in the 1935 portion of the building is still present in attic spaces off the penthouse. CTA assumes this material is also present in two air shafts in the 1935 construction and on ductwork above third floor plaster ceilings in the 1926 construction. The duct insulation locations and quantities were assumed in these two locations due to limited access.

As discussed in the Executive Summary, there is a substantial quantity of asbestos-containing duct insulation present in the attic of the 1935 construction (38T8.2). CTA visually-verified the presence of this material via two locked access hatches located in Room 401 (Penthouse A). Quantities shown in the room-by-room summary and in the abatement cost estimate were derived from previous similar assessments. While visual inspection confirmed that the material is still present in the 1935 attic space, CTA assumed the material to be present in the two air shafts located in the 1935 building and also in the above ceiling areas of the third floor of the 1926 building.

It is important to note that Northern Industrial Hygiene, Inc. (Northern’s) Asbestos Re-Inspection Report, dated 2007, was utilized in the field to complete this 2014 survey; specifically, reviewing the room-by-room summary in conjunction with the associated floor plan figures to ascertain whether or not Asbestos-Containing Building Materials (ACBM) materials had been removed via abatement activities between 2007 and current. If ACBMs were observed where indicated in the 2007 inspection, their condition(s) and approximate quantities were documented on field forms. The aforementioned Northern report is referenced herein as the 2007 inspection.

Abatement History

This 2014 re-inspection report includes the addition of five (5) materials suspected to contain asbestos that were sampled and laboratory-analyzed; resulting as Non-Asbestos-Containing Materials (Non-ACM). This 2014 re-inspection report also includes a summary of the five (5) reports supplied by the onsite GSA property manager, documenting abatement and/or cleanup of ACBMs and associated debris from the site. Additionally, some of the ACBM(s) outlined in the 2007 inspection are no longer present in all, or any, of the locations detailed in that report. This information is summarized below, to extents feasible.

In 2010, Abatement Contractors of Montana (ACM) were contracted to complete “emergency asbestos abatement project”, along the first floor of the Missoula Federal Building. A full detailed scope for this abatement was not described in the Certificate of Completion, provided by the GSA property manager.

According to the Affinity Environmental (Affinity) Inspection & Area Air Sampling for Asbestos Containing Materials report, dated October 19, 2012, ACM was contracted to complete cleaning of ACBMs and associated debris from the Forest Service Storage Room (Room G62), the IT Computer Room (Room G58), and the Freight Elevator Corridor to accommodate a remodeling project involving a pipe chase. The documentation reports a successful clearance testing event.

According to the Affinity Inspection & Air Clearance for Asbestos Containing Materials report, dated December, 27, 2012, ACM was contracted to complete cleaning of ACBMs (floor tile and other debris) from the Third floor, Room #16 of the Missoula Federal Building. CTA opines that Room #16 is actually referring to a stairwell along the northeast portion of the third floor (Room 318A). The documentation reports a successful clearance testing event.

Asbestos Re-Inspection Report Page 3

February 28, 2014

According to the Affinity Inspection & Air Clearance for Asbestos Containing Materials report, dated February 6, 2013, ACM was contracted to complete removal and/or cleaning of ACBMs (floor tile, mastic and other debris

– 08F3.1) from the Third floor 1910 Section hallway; specifically, the Greenhouse. Based on CTA’s field observations, tile and mastic were not present in Room 329C (Greenhouse) and tiles were removed leaving behind ACBM black mastic only in Rooms 329 and 329B. It should be noted that Room 321 has been removed since the 2007 inspection and CTA combined this former space with the hall section denoted now as Room

329. The documentation reports a successful clearance testing event.

According to the Affinity Inspection & Air Clearance for Asbestos Containing Materials report, dated September 5, 2013, ACM was contracted to complete removal and/or cleaning of ACBMs (TSI elbows, mudded-fittings and associated debris – 35T2.1 and 35T3.3) from the Boiler Room (G18) of the Missoula Federal Building. The documentation reports a successful clearance testing event.

Two (2) ACBMs outlined in the 2007 inspection report were not observed by CTA personnel during the 2014 re-inspection. These materials include the following: beige with gray streaks 9-inch by 9-inch floor tiles and mastic (08F3.3); and, straight-run pipe insulation (27T3.1).

Asbestos Findings

CTA conducted an asbestos re-inspection at the Missoula Federal Building between January 13 and 15, 2014.

Materials assumed to contain asbestos were not sampled to protect structural integrity. The following suspect homogeneous materials were confirmed or assumed to contain asbestos:

Material Description Material Number and Additional Comments

12” x 12” Floor Tile 08F2.1: 12”x12” White, beige, and tan mottled floor tile (ND), Mastic (ACM)

9” x 9” Floor Tile 08F3.1: 9”x9” Gray with black streaks floor tile (ACM), Mastic (ACM)

9” x 9” Floor Tile 08F3.2: 9”x9” Green floor tile (ACM), Mastic (ACM)

Pipe Joint Insulation 08T2.3: Mudded-fitting insulation, heating

Straight Pipe Insulation 08T3.2: Straight-run pipe insulation, heating

Straight Pipe Insulation 08T3.3: Straight-run pipe insulation on domestic lines, felt-like

12” x 12” Floor Tile 26F2.2: 12”x12” Cream w/gray streaks floor tile (ND), Mastic (ACM)

9” x 9” Floor Tile 26F3.1: 9”x9” Light brown w/white streaks floor tile (ACM), Mastic (ND)

9” x 9” Floor Tile 26F3.2: 9”x9” Gray with black streaks floor tile (ACM), Mastic (ND)

Pipe Joint Insulation 26T2.1: Pipe joint insulation mudded-fitting, domestic

Straight Pipe Insulation 26T3.1: Preformed/layered paper gray insulation with white cloth wrap, domestic

12” x 12” Floor Tile 27F2.2: 12”x12” Cream w/gray streaks floor tile (ACM), Mastic (ACM)

Pipe Joint Insulation 27T2.1: Pipe joint insulation, mudded-fittings

12” x 12” Floor Tile 35F2.3: 12”x12” Off-white mottled floor tile (ACM), Mastic (ND)

Asbestos Re-Inspection Report Page 4

February 28, 2014

Material Description Material Number and Additional Comments

9” x 9” Floor Tile 35F3.2: 9”x9” Green with white streaks floor tile (ACM), Black mastic (ACM)

Other 35M16.3: Wall insulation at radiators (exposed edges on sides)

Pipe Joint Insulation 35T2.1: Mudded-fittings, domestic

Pipe Joint Insulation 35T2.3: Mudded-fittings, heating

Straight Pipe Insulation 35T3.1: Straight-run pipe insulation, domestic

Straight Pipe Insulation 35T3.3: Straight-run pipe insulation, MAG

Boiler Breaching/etc. 35T7.1: Breaching mud over fiberglass (cracking in breaching)

Duct Insulation 35T8.2: Magnesia duct insulation

12” x 12” Floor Tile 52F2.1: 12”x12” Cream with gray streaks floor tile (ACM), Yellow mastic (ND)

Pipe Joint Insulation 52T2.1: Pipe joint insulation/mudded-fittings, domestic

Straight Pipe Insulation 52T3.2: Straight-run pipe insulation, MAG

Patching Materials 52T9.2: Patching compound around pipe penetration

Roofing Materials M1.1: Built-up roof beneath new hypolon membrane (assumed; not sampled)

Notes:

“ inches ND None Detected ACM Asbestos Containing Material

ACBMs removed from this list following the 2007 Re-inspection included: 08F3.3 (9” x 9” Floor tiles), and 27T3.1 (Aircell straight pipe insulation), as these materials were not observed in the 2014 Re-inspection.

Recommendations

Based on the results of laboratory analysis of bulk samples and visual and tactile assessment of building materials previously confirmed to contain asbestos, CTA recommends the following specific management actions:

Material Description Material Number and Additional Comments Management

Recommendations

12”x12” Floor Tile 08F2.1: 12”x12” White, beige, and tan mottled floor tile (ND), Mastic (ACM) O&M

9”x9” Floor Tile 08F3.1: 9”x9” Gray with black streaks floor tile (ACM), Mastic

(ACM)

O&M

9”x9” Floor Tile 08F3.2: 9”x9” Green floor tile (ACM), Mastic (ACM) O&M

Joint Insulation 08T2.3: Mudded-fitting pipe insulation, heating O&M

Straight Insulation 08T3.2: Straight-run pipe insulation, heating O&M

Straight Insulation 08T3.3: Straight-run pipe insulation on domestic lines, felt-like O&M

Asbestos Re-Inspection Report Page 5

February 28, 2014

Material Description Material Number and Additional Comments

Management Recommendations

12”x12” Floor Tile 26F2.2: 12”x12” Cream w/gray streaks floor tile (ND), Mastic

(ACM)

O&M

9”x9” Floor Tile 26F3.1: 9”x9” Light brown w/white streaks floor tile (ACM), Mastic (ND)

O&M

9”x9” Floor Tile 26F3.2: 9”x9” Gray with black streaks floor tile (ACM), Mastic

(ND) O&M

Joint Insulation 26T2.1: Pipe joint insulation mudded-fitting, domestic O&M

Straight Insulation 26T3.1: Preformed/layered paper gray insulation with white cloth wrap, domestic

O&M

12”x12” Floor Tile 27F2.2: 12”x12” Cream w/gray streaks floor tile (ACM), Mastic

(ACM)

O&M

Joint Insulation 27T2.1: Pipe joint insulation, mudded-fittings O&M

12”x12” Floor Tile 35F2.3: 12”x12” Off-white mottled floor tile (ACM), Mastic

(ND) O&M

9”x9” Floor Tile 35F3.2: 9”x9” Green with white streaks floor tile (ACM), Black mastic (ACM)

O&M

Other 35M16.3: Wall insulation at radiators (exposed edges) O&M

Joint Insulation 35T2.1: Mudded-fittings pipe insulation, domestic O&M

Joint Insulation 35T2.3: Mudded-fittings pipe insulation, heating O&M

Straight Insulation 35T3.1: Straight-run pipe insulation, domestic O&M

Straight Insulation 35T3.3: Straight-run pipe insulation, MAG O&M

Boiler Breaching 35T7.1: Breaching mud over fiberglass (cracking in breaching) O&M

Duct Insulation 35T8.2: Magnesia duct insulation O&M

12”x12” Floor Tile 52F2.1: 12”x12” Cream with gray streaks floor tile (ACM), Yellow mastic (ND) O&M

Joint Insulation 52T2.1: Pipe joint insulation/mudded-fittings, domestic O&M

Straight Insulation 52T3.2: Straight-run pipe insulation, MAG O&M

Patching Materials 52T9.2: Patching compound around pipe penetration O&M

Roofing Materials M1.1: Built-up roof beneath hypolon (assumed; not sampled) O&M

Notes:

“ inches ACM Asbestos Containing Material ND None Detected O&M Operations and Maintenance

Most of the asbestos-containing materials throughout the Missoula Federal Building are intact and in generally good condition overall. For this reason, CTA recommends that a formal operations and maintenance program be developed to assist in maintaining the ACBMs within the building. The program would include provisions for the routine re-inspection of the identified ACBM, appropriate maintenance and cleaning procedures for the

Asbestos Re-Inspection Report Page 6

February 28, 2014 facility and a method for informing in-house and contract workers of the hazards associated with the ACBM, as well as proper work methods and personal protective equipment (PPE) to be utilized, if applicable. The presence of ACBM within the building should be included in the hazard communication information provided to all building occupants and GSA personnel.

There are a few exceptions to the aforementioned recommendations. The asbestos-containing materials in one (1) pipe chase (Room G30B) still show signs of damage and deterioration, although the bottom of the chase has apparently been cleaned of associated ACBM debris. As recommended in the 2007 inspection report, pipe chase access points have been secured with a locking hatch as observed during the 2014 re-inspection.

Damaged materials as observed during the 2014 re-inspection are as follows:

Room G03 Thermal Systems Insulation (TSI) exposed at previous sample points;

Room G17 TSI breeched at seems and displays signs of possible mold growth;

Room G59 Absent jacketing material on mudded-fittings (residual mud only present);

Room 106 Chipped floor tiles;

Room 127 Chipped floor tiles;

Room 208A Jacket delaminating from pipe insulation;

Room 219 Edges of radiator backing exposed;

Room 221 Edges of radiator backing exposed;

Room 222 Edges of radiator backing exposed;

Room 225B Jacket breeched at seem; and, Room 302A Tears in pipe insulation jacket.

Asbestos Re-Inspection Report Page 7

February 28, 2014

1. Introduction and Scope of Work

CTA Construction & Environmental, LLC. (CTA) was retained by Pinyon Environmental who was retained by General Services Administration (GSA) to perform a re-inspection asbestos survey of the Missoula Federal Building/Post Office/U.S. Courthouse (GSA Building number MT0017ZZ), located at 200 East Broadway Street in Missoula, MT 59802-4530. The purpose of this survey was to identify friable and non-friable suspect asbestos-containing building materials (ACBM).

The scope of this inspection included the following activities:

Surveying, identifying, and sampling suspect friable and non-friable ACBM.

Preparing this comprehensive report documenting the sampling procedures and results of the ACBM survey.

To accomplish this survey, all accessible areas of the building were identified by name and assigned room numbers. A summary of identified functional spaces is presented in Table 3-1.

Within each space, suspect building materials were identified. C T A uses a standardized numbering format to identify suspect building materials, and to identify bulk samples.

The report contains six sections. The six sections are: introduction and scope of work; inspection procedures;

survey findings; conclusions and recommendations; removal cost estimate; and limitations sections. The report also contains seven appendices. Appendix A contains figures, Appendix B contains tables, Appendix C contains the laboratory analysis reports and chain of custodies, Appendix D contains a Photographic Log, Appendix E contains abatement and/or clearance report documents, Appendix F contains general inspection information, and Appendix G contains inspector and laboratory certifications.

Asbestos Re-Inspection Report Page 8

February 28, 2014

2. Inspection Procedures

The asbestos survey was performed using the applicable portions of the currently recognized standard protocol developed for schools under AHERA, as promulgated in Title 40, Code of Federal Regulations (40 CFR), Part 763 and as amended in the Federal Register (EPA, 2011). Since the primary concern for this investigation was to identify potential asbestos hazards in the entire building, CTA representatives visually inspected existing conditions within the entire facility. An overview of asbestos and current regulations and a glossary of common terms are presented in Appendix F.

2.1 Inspection and Sampling

The inspection was conducted by our State certified and AHERA accredited asbestos inspector, and consisted of a detailed visual survey of surfacing materials, thermal system insulation, and miscellaneous materials throughout the building. Suspect ACBM was then grouped into homogeneous materials and sampling plans developed. Components of the inspection included:

Identification of homogeneous suspect materials on a room by room basis (Appendices A and B).

An assessment of known or assumed ACBM, generally classifying the materials using categories defined in the AHERA and National Emission Standards of Hazardous Air Pollutants (NESHAP), for asbestos. A description of NESHAP categories is presented in the Section 3 Room-By-Room Table Key.

Homogeneous suspect ACBM’s were, for the purpose of this study, placed into the following four materials type categories: Thermal System Insulation (TSI), surfacing materials, miscellaneous materials, and floor covering. AHERA sampling protocol specifies sampling procedures for each material type (Appendix F).

Sample locations for this survey were chosen in a non-random fashion, with emphasis placed on obtaining samples of each type of accessible, suspect material and minimizing damage to the material being sampled (Appendix A Figures A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, and A-1.6). Samples were collected by carefully removing small portions of the suspect material in a non-abrasive manner. If possible, samples from existing damaged areas or loose pieces of material were collected. Samples were obtained by using techniques such as wet slicing, wet boring or similar methods designed to limit contamination of the area during sampling. The sampled area was sealed using patching compounds, duct tape, or spray encapsulates as appropriate to the material being sampled.

Immediately after collection, samples were placed in pre-labeled plastic containers. Containers with samples were then placed in a large re-sealable plastic bag for transportation to the laboratory.

Documentation of our inspector’s asbestos accreditations is included as Appendix G.

2.2 Laboratory Analysis

Bulk samples obtained during the inspection were assigned bulk sample numbers and entered on sample chain-of-custody forms, followed by being shipped to EMSL Analytical, Inc. (EMSL) in Cinnaminson, New Jersey.

Laboratory analysis was performed in accordance with EPA Method 600/R-93/116, which employs polarized light microscopy (PLM) with dispersion staining for identification of mineral forms of asbestos, and has a limit of detection (LOD) of approximately 1%, by volume. Where appropriate, CTA requested that samples confirmed to contain asbestos in concentrations less than 1%, be analyzed further using the 400 Point Count Stipulation of the EPA PLM method to achieve an analytical sensitivity of 0.25%.

Asbestos Re-Inspection Report Page 9

February 28, 2014

EMSL is accredited by the National Institute of Standards and Technology’s (NIST) National Voluntary Laboratory Accreditation Program (NVLAP) for PLM analysis, and therefore meets the proficiency requirements of the Department of Environmental Quality (DEQ). Documentation of EMSL’s laboratory certifications is included as Appendix G.

2.3 Quality Assurance and Quality Control

Quality Assurance and Quality Control (QA/QC) measures adopted by CTA involved both field and office components. Key parameters are summarized below:

Field QA/QC

Review inspection forms for completeness

Check homogeneous materials listing for sufficient number of collected samples

Verify locations of major mechanical components

Office QA/QC

Review lab results for completeness

Ensure appropriate cross-referencing of results, forms for given ACBM

Ensure drawings are updated as necessary following field QC

Verify approximate quantities of ACBM based on drawing review

Review recorded field comments for meaning, incorporate as necessary into report

Asbestos Re-Inspection Report Page 10

February 28, 2014

3. Survey Findings

3.1 Building Description

The Missoula Federal Building was constructed in 1908 to 1952. The facility inspected is a three-story, steel and concrete structure with a full basement, attic, and stone and brick finishes. It encompasses a total of 144,681 square feet of building space.

The Missoula Federal Building began its existence as a home for the forestry service and postal service. The original portion of the building was completed in 1912. In 1926, a second building was constructed to house a federal court. One year later, these two, three-story structures were connected by a two-story corridor with a greenhouse on its third floor. This connecting structure was wide enough to accommodate additional offices on one side of the first two floor corridors. In 1935, another three-story addition effectively doubled the size of the existing building to accommodate even more office spaces. New mechanical rooms were also added and connected between the building sections via ductwork and a pipe tunnel. In 1952, a one-story addition was built behind the 1927 corridor to provide the post office with additional room.

Extensive renovation activities occurred in 1976 and 1977 to revamp and update the tenant office space.

Because of the extent of this renovation, many of the same building material finishes can be seen throughout the building, regardless of the original construction date.

Typical interior floor finishes include the following: marble; terrazzo; carpet; 9” by 9” or 12” by 12” vinyl floor tiles; vinyl sheet flooring; and, wood. Under all these finishes is a concrete sub floor with a variety of leveling materials. In some areas felt is also present between the concrete and overlying flooring finish. Typical wall finishes consist of the following: concrete; brick; plaster; gypsum wallboard; and, wood paneling. Ceilings are primarily 2’ by 4’, lay-in panels suspended below original plaster ceilings, 1’ by 1’ glued on ceiling tiles, or concrete decking. Janitor closets and store rooms still have the original plaster ceilings in place. Some ceilings have 1’ by 1’ glue on tiles while gypsum wallboard ceilings are present in remodeled areas. Most rooms have either 4” or 6” vinyl base cove finishes though some of the original marble and wood bases are still in place.

The restrooms generally have ceramic tile floor finishes with ceramic tile also extending part way up the plaster or gypsum wallboard walls.

The exterior of the building is finished with granite, limestone and brick. The Post Office and Courthouse roofs have a slight pitch while the 1935 and 1952 additions exhibit flat roofs. The entire roof was refinished in 1993 and is asphalt with a gravel layer finish. Roofing materials were not sampled during this inspection but asbestos-containing materials are assumed to be present under the new roof.

Heat for the building originates from boilers located in the 1935 portion of the building. Perimeter wall heat is provided by radiant or fan coil type units. Heat pumps with fan coils provide forced-air heat to other interior spaces. In 1976, updates to the Heating, Ventilation, and Air Conditioning (HVAC) systems included the installation of many new pre and re-heat coils, heat registers, the evaporative water cooling tower, steam coils, and exhaust air ducts. In 1983, much of the piping was updated, with fiberglass insulation being installed on associated piping’s straight-runs and fittings. In 1992, a boiler replacement project converted the steam heat to hot water heat. At this time, most of the remaining asbestos-containing pipe insulation was removed as the project involved the demolition of the old steam and condensate piping, where accessible. New piping for the heating and chilled water was installed in most cases with no insulation being used. The new boilers were connected to the original breaching, which is assumed to be insulated with asbestos.

Though most of the old piping has been removed, the piping in most wall cavities and pipe chases was abandoned in place. There is still original, asbestos-containing pipe insulation located in these areas as well as random locations above suspended ceilings where only portions of the original piping was replaced or re-

Asbestos Re-Inspection Report Page 11

February 28, 2014 insulated. In addition, the remaining ends of abandoned cut off steam pipes are still exposed at wall and ceiling penetrations. Some of this, as well as straight-run and fitting insulation observed in the one of the pipe chases, is in poor condition. The original asbestos-containing duct insulation in the 1935 portion of the building is still present in attic spaces off the penthouse. CTA assumes this material is also present in two air shafts in the 1935 construction and on ductwork above third floor plaster ceilings in the 1926 construction. The duct insulation locations and quantities were assumed in these two locations due to limited access.

As discussed in the Executive Summary, there is a substantial quantity of asbestos-containing duct insulation present in the attic of the 1935 construction (38T8.2). CTA visually-verified the presence of this material via two locked access hatches located in Room 401 (Penthouse A). Quantities shown in the room-by-room summary and in the abatement cost estimate were derived from previous similar assessments. While visual inspection confirmed that the material is still present in the 1935 attic space, CTA assumed the material to be present in the two air shafts located in the 1935 building and also in the above ceiling areas of the third floor of the 1926 building.

Table 3-1 summarizes each room/functional space by floor, room number, description, and additional comments as necessary.

3.2 Findings

CTA conducted an asbestos re-inspection at the Missoula Federal Building/Post Office/U.S. Courthouse on January 13-15, 2014. Materials assumed to contain asbestos were not sampled to protect structural integrity.

While the five (5) suspect homogeneous materials, sampled during the 2014 re-inspection, were confirmed not to contain asbestos, the following materials were previously assumed and/or confirmed to contain asbestos:

Material Description Material Number and Additional Comments

12” x 12” Floor Tile 08F2.1: 12”x12” White, beige, and tan mottled floor tile (ND), Mastic (ACM)

9” x 9” Floor Tile 08F3.1: 9”x9” Gray with black streaks floor tile (ACM), Mastic (ACM)

9” x 9” Floor Tile 08F3.2: 9”x9” Green floor tile (ACM), Mastic (ACM)

Pipe Joint Insulation 08T2.3: Mudded-fitting insulation, heating

Straight Pipe Insulation 08T3.2: Straight-run pipe insulation, heating

Straight Pipe Insulation 08T3.3: Straight-run pipe insulation on domestic lines, felt-like

12” x 12” Floor Tile 26F2.2: 12”x12” Cream w/gray streaks floor tile (ND), Mastic (ACM)

9” x 9” Floor Tile 26F3.1: 9”x9” Light brown w/white streaks floor tile (ACM), Mastic (ND)

9” x 9” Floor Tile 26F3.2: 9”x9” Gray with black streaks floor tile (ACM), Mastic (ND)

Pipe Joint Insulation 26T2.1: Pipe joint insulation mudded-fitting, domestic

Straight Pipe Insulation 26T3.1: Preformed/layered gray insulation with white cloth wrap, domestic

12” x 12” Floor Tile 27F2.2: 12”x12” Cream w/gray streaks floor tile (ACM), Mastic (ACM)

Asbestos Re-Inspection Report Page 12

February 28, 2014

Material Description Material Number and Additional Comments

Pipe Joint Insulation 27T2.1: Pipe joint insulation, mudded-fittings

12” x 12” Floor Tile 35F2.3: 12”x12” Off-white mottled floor tile (ACM), Mastic (ND)

9” x 9” Floor Tile 35F3.2: 9”x9” Green with white streaks floor tile (ACM), Black mastic (ACM)

Other 35M16.3: Wall insulation at radiators (exposed edges on sides)

Pipe Joint Insulation 35T2.1: Mudded-fittings, domestic

Pipe Joint Insulation 35T2.3: Mudded-fittings, heating

Straight Pipe Insulation 35T3.1: Straight-run pipe insulation, domestic

Straight Pipe Insulation 35T3.3: Straight-run pipe insulation, MAG

Boiler Breaching/etc. 35T7.1: Breaching mud over fiberglass (cracking in breaching)

Duct Insulation 35T8.2: Magnesia duct insulation

12” x 12” Floor Tile 52F2.1: 12”x12” Cream with gray streaks floor tile (ACM), Yellow mastic

(ND)

Pipe Joint Insulation 52T2.1: Pipe joint insulation/mudded-fittings, domestic

Straight Pipe Insulation 52T3.2: Straight-run pipe insulation, MAG

Patching Materials 52T9.2: Patching compound around pipe penetration

Roofing Materials M1.1: Built-up roof beneath new hypolon membrane (assumed; not sampled)

Notes:

“ inches ND None Detected ACM Asbestos Containing Material

ACBMs removed from this list following the 2007 Re-inspection included: 08F3.3 (9” x 9” Floor tiles), and 27T3.1 (Aircell straight pipe insulation), as these materials were not observed in the 2014 Re-inspection.

Asbestos Re-Inspection Report Page 13

February 28, 2014

TABLE 3-1: Functional Space Summary Floor Room Functional Space Comments

1 101 HALLWAYS Corridor/Room 1 102 OFFICES Library 1 102A MEETING ROOMS Library 1 103 OFFICES GSA Offices 1 103A STORAGE GSA Storage 1 103B OFFICES Office 1 103C OFFICES Office 1 103D OFFICES GSA Offices 1 104 OFFICES Office 1 104A OFFICES Office 1 105 RESTROOM Men’s Restroom 1 106 JANITOR CLOSET Custodian Closet 1 106A PIPE CHASES Pipe Chase 1 107 OFFICES Info Office 1 108 STAIRWELLS Stairs 1 108A STAIRWELLS Stairs Up 1 109 STORAGE Storage 1 109A RESTROOM Restroom 1 110 OFFICES Info Reception 1 111 LOBBIES Security lobby and west corridor 1 111A TELEPHONE/ELEC. ROOMS Telephone Booth 1 112 OFFICES Govt. Employee Credit Union 1 112A STORAGE Back room off 112 1 113 OFFICES Open office space 1 113A TELEPHONE/ELEC. ROOMS Telephone Closet 1 114 OFFICES Office 1 115 STORAGE Storage 1 115A OFFICES New Office 1 116 ENTRANCES AND EXIT AREAS North foyer to lobby 1 117 HALLWAYS Hall 1 118 JANITOR CLOSET Custodian 1 119 OFFICES Fin. Resources Director Office 1 120 OFFICES Office 1 121 HALLWAYS East Hall 1 121A STAIRWELLS Stairwell 1 122 OFFICES Office 1 123 OFFICES Office 1 124 RESTROOM Women’s Restroom 1 124A MECHANICAL ROOM Mechanical Room 1 124B PIPE CHASES Pipe Chase 1 125 OFFICES Open space offices 1 125A TELEPHONE/ELEC. ROOMS Telephone Closet 1 126 VAULTS Vault 1 127 OFFICES GSA Trash Room 1 128 OFFICES Office 1 129 HALLWAYS Corridor 1 129A OFFICES Office

Asbestos Re-Inspection Report Page 14

February 28, 2014

Floor Room Functional Space Comments 1 129B OFFICES Office 1 130 OFFICES Office 1 131 RESTROOM Men’s Restroom 1 131A ENTRANCES AND EXIT AREAS Entry 1 132 ENTRANCES AND EXIT AREAS Entry 1 132A STORAGE Storage 1 132B OFFICES Office 1 133 OFFICES Office 1 136 OFFICES Office 1 137 OFFICES Office 1 138 HALLWAYS Corridor 1 138A ENTRANCES AND EXIT AREAS Entry 1 139 WORK-ROOM GSA Mail Room 1 140 STORAGE Storage 1 145 HALLWAYS Corridor 2 201 OFFICES Offices 2 202 OFFICES Offices 2 203 OFFICES Offices 2 204 OFFICES Offices 2 205 OFFICES Offices 2 205A OFFICES Offices 2 205B OFFICES Offices 2 205C OFFICES Offices 2 206 OFFICES Offices 2 207 RESTROOM Men’s Restroom 2 208 JANITOR CLOSET Janitor Closet 2 208A PIPE CHASES Pipe Chase 2 209 JANITOR CLOSET Janitor Closet 2 209A HALLWAYS Corridor 2 209B OFFICES Open Offices 2 210 OFFICES Public & Government Relations 2 211 HALLWAYS Corridor 2 211A STAIRWELLS Stairwell 2 212 MEETING ROOMS Meeting Room 2 213 OFFICES Office 2 214 OFFICES Office 2 215 OFFICES Office 2 216 OFFICES Open Office 2 217 HALLWAYS Corridor 2 218 OFFICES Copy Room 2 219 MEETING ROOMS Meeting Room 2 221 OFFICES Office 2 222 OFFICES Office 2 222A MEETING ROOMS Meeting Room 2 222B TELEPHONE/ELEC. ROOMS Telephone Closet 2 223 STORAGE Storage/Custodian 2 224A OFFICES Office 2 225 RESTROOM Women’s Restroom

Asbestos Re-Inspection Report Page 15

February 28, 2014

Floor Room Functional Space Comments 2 225B PIPE CHASES Pipe Chase 2 226 OFFICES Office 2 227 OFFICES Office 2 228 OFFICES Office -2 spaces 2 229 OFFICES Office 2 230 OFFICES Open Offices 2 230A HALLWAYS Corridor 2 231 ENTRANCES AND EXIT AREAS Entry 2 232 RESTROOM Women’s Restroom 2 233 OFFICES Office 2 234 OFFICES Open Office 2 235 OFFICES Office 2 236 OFFICES Office 2 237 HALLWAYS Corridor 2 237A HALLWAYS Corridor 2 238 STORAGE Storage 2 238A STORAGE Storage 2 239 STORAGE Storage 2 240 STORAGE Storage 2 240A RESTROOM Restroom 2 241 RESTROOM Restroom 2 242 HALLWAYS Corridor 2 243 MECHANICAL LOG Access 2 244 OFFICES Office 2 245 JANITOR CLOSET Custodian 2 246 OFFICES Office 2 247 OFFICES Office 2 248 RESTROOM Restroom - Men 2 249 RESTROOM Restroom - Women 2 250 MEETING ROOMS Meeting Room 2 251 OFFICES Vacant Office 2 252 OFFICES Office 2 253 STAIRWELLS Foyer, Stairs and Elevator 2 254 OFFICES Vacant Office 2 255 OFFICES Office 2 255A RESTROOM Restroom 2 256 OFFICES Office 2 257 OFFICES Vacant Office 2 258 HALLWAYS Corridor, Southside 2 259 RESTROOM Restroom 2 260 OFFICES Office 2 261 STORAGE Storage Closet 2 262 HALLWAYS Corridor, North and South 2 263 MEETING ROOMS Meeting Room 2 264 RESTROOM Restroom 3 301 OFFICES Large open office area 3 301A STAIRWELLS Stairwell 3 302 JANITOR CLOSET Custodian

Asbestos Re-Inspection Report Page 16

February 28, 2014

Floor Room Functional Space Comments 3 302A PIPE CHASES Pipe Chase 3 303 RESTROOM Men’s Restroom 3 304 STORAGE Storage 3 305 OFFICES Office 3 306 OFFICES Office 3 307 OFFICES Office 3 308 OFFICES Office 3 309 OFFICES Copy Room 3 309A OFFICES New office w/o number 3 309B VAULTS Vault and Air Plenum 3 310 STAIRWELLS Stairwell (To Penthouse) 3 311 JANITOR CLOSET Custodian 3 312 OFFICES Office 3 313 HALLWAYS Corridor 3 314 OFFICES Large N.E. Corner Office 3 315 OFFICES Office 3 317 OFFICES Office 3 318 JANITOR CLOSET Custodian 3 318A PIPE CHASES Pipe Chase 3 319 RESTROOM Women’s Restroom 3 320 OFFICES Large Office Area 3 321 MEETING ROOMS Meeting Room 3 322 OFFICES Office 3 323 RESTROOM Restroom - Women 3 323A PENTHOUSE Elevator Penthouse 3 324 HALLWAYS Corridor 3 324A HALLWAYS Connect Corridor 3 324B STAIRWELLS Stairwell 3 325 OFFICES Open Office 3 326 OFFICES Office 3 326A OFFICES Office 3 327 OFFICES Office 3 328 OFFICES Office 3 329 OFFICES Office 3 329A OFFICES Open Office 3 329B ENTRANCES AND EXIT AREAS Foyer to Atrium 3 329C MULTI-PURPOSE ROOM Greenhouse/Atrium 3 329D OFFICES Open Office 3 329E OFFICES Open Office 3 329F OFFICES Open Office 3 330 RESTROOM Restroom - Men 3 331 OFFICES Office (copy room) 3 332 OFFICES FBI – Multiple Office 3 333 HALLWAYS Hallway 3 334A VAULT ATF Vault 3 334B OFFICES ATF Office 3 334C OFFICES ATF Office 3 334D COMMONS ATF Common Area

Asbestos Re-Inspection Report Page 17

February 28, 2014

Floor Room Functional Space Comments 3 334E BREAK ROOM ATF Break Room 3 334F INTERVIEW ATF Interview Room 3 334G ENTRANCES AND EXIT AREAS ATF Entry 3 334H COMPUTER/SERVER ATF Server Room 3 334I ATTICS Attic 3 335 JANITOR CLOSET Custodian Room 3 336 LOBBIES Lobby area/top of stairs 3 336A ENTRANCES AND EXIT AREAS Entry Area to Elevator/Penthouse B 3 336B STAIRWELLS Stairwell 4 401 PENTHOUSE 1935 Penthouse A 4 401A MECHANICAL Attic Space (access in Penthouse A) 4 401B AIR DUCT/SHAFT Air Shaft B in 1935 Building 4 402 PENTHOUSE Penthouse B 4 402A AIR DUCT/SHAFT Air Shaft A in 1935 Building 4 403 PENTHOUSE 1926 Elevator Penthouse A 4 403A ATTICS Attic Space in 1926 Building 4 404 PENTHOUSE 1908 Penthouse B (Elevator Control)

EXT 501 EXTERIOR Building Exterior R 601 ROOFS Roof B G01 OFFICES USDA Lands & Minerals B G02 STORAGE Access & HVR #1 Storage B G03 TELEPHONE/ELEC. ROOMS Main Electrical Disconnect B G04 STORAGE Book Storage B G05 OFFICES Office B G06 OFFICES Security Office B G07 OFFICES Vacant Office B G08 OFFICES FS Storage B G09 HALLWAYS West Corridor B G09A HALLWAYS NW Corridor front of stairs B G09B HALLWAYS NW Corridor corner lobby B G09C HALLWAYS North Corridor B G09D HALLWAYS East Corridor B G10 RESTROOM Women’s Restroom B G11 JANITOR CLOSET Custodian B G11A PIPE CHASES Pipe Chase B G12 STAIRWELLS Stairwell B G12A JANITOR CLOSET GSA/Custodian B G12B KITCHEN GSA/Custodian Break Room B G12C OFFICES GSA/Custodian Office B G12D TELEPHONE/ELEC. ROOMS Telephone Room B G13 TELEPHONE/ELEC. ROOMS Telephone Control B G14 OFFICES Video Production B G15 STORAGE Storage B G16 OFFICES Vacant B G17 STORAGE Storage – Vacant B G17A STORAGE Storage B G18 MECHANICAL ROOM Boiler Room B G18A MECHANICAL ROOM Mechanical Room

Asbestos Re-Inspection Report Page 18

February 28, 2014

Floor Room Functional Space Comments B G18B TUNNELS Pipe Tunnel B G19 MECHANICAL ROOM Mechanical Room B G23 OFFICES Vacant Office B G24 OFFICES Vacant Office B G25 STORAGE Storage Room B G26 OFFICES Duplicating B G26A STORAGE Duplication Supplies B G26B OFFICES Duplication Office B G27 OFFICES USDS FS Ecology B G28 OFFICES First Aid Room B G29 STAIRWELLS Stairwell B G30 STORAGE Storage B G30A JANITOR CLOSET Custodian Closet B G30B PIPE CHASES Pipe Chase in Custodian’s Office B G31 OFFICES Vacant Office B G32 OFFICES Vacant Office B G33 OFFICES Office B G34 HALLWAYS Corridor B G35 MEETING ROOMS Meeting Room B G36 OFFICES FS Engineering & Photo B G38 OFFICES Old unused darkroom B G39 OFFICES USDA FS Engineering B G40 OFFICES Office B G41 OFFICES Office B G42 OFFICES Silkscreen B G43 HALLWAYS Corridor B G44 OFFICES Whiler Room B G45 OFFICES Office B G46 RESTROOM Restroom – Women’s Vestibule B G47 RESTROOM Restroom – Women’s B G48 STORAGE Computer Storage B G49 MECHANICAL ROOM Mechanical Room B G50 OFFICES Photo Lab Office B G50A OFFICES Dark Room B G51 OFFICES Dark Room B G51A OFFICES Processor Room B G52 OFFICES Film Wash Room B G53 OFFICES Photo Mat Room B G54 ENTRANCES AND EXIT AREAS Entry/Vestibule between rooms B G55 HALLWAYS Corridor B G57 STORAGE Computer Storage B G58 COMPUTER ROOM Computer Room B G58A TELEPHONE/ELEC. ROOMS Computer (Closet) Communications B G59 MECHANICAL ROOM Computer Mechanical Room B G60 TELEPHONE/ELEC. ROOMS Electrical Room B G62 STORAGE Storage B G62A STORAGE Storage B G64 MECHANICAL ROOM Mechanical Room

Asbestos Re-Inspection Report Page 19

February 28, 2014

Floor Room Functional Space Comments B G65 RESTROOM Restroom – Men B G66 OFFICES Office, Cartography B G67 STORAGE Storage B G70 OFFICES Office B G71 OFFICES Office B G72 STORAGE Freight Room B G72A PIPE CHASES Pipe Chase (walled over) B G72B HALLWAYS Hallway B G74 OFFICES Vacant B G77 OFFICES Lab B G78 OFFICES Lab B G79 OFFICES Lab B G79A OFFICES Office B G79B MECHANICAL Cold Room B G79C STORAGE Storage B G80 STORAGE Freight Room B G81 TELEPHONE/ELEC. ROOMS Electrical Room B G81A AIR DUCT/SHAFT Airshaft (room walled over) B G82 HALLWAYS Corridor B G83 OFFICES Lab B G84 OFFICES Office B G85 HALLWAYS Corridor B G86 OFFICES Office B G87 OFFICES Clean Room B G88 OFFICES Man H20 B G89 RESTROOM Restroom – Women B G90 STORAGE Storage

Notes: Functional space records could not be obtained by CTA. With exception of the following Rooms, the functional spaces summarized above are consistent with those reported in the 2007 inspection: 103A; 103D; 329D; 329E; 329F; 332; and, 334A- 334I.

Asbestos Re-Inspection Report Page 20

February 28, 2014

Table B Key

The following is an explanation of each column listed in Table B:

Floor No.

The floor level of the building.

Room No.

A list of all spaces in numeric order. Due to the need for each inspected space to have a unique identifying number, the room numbers in this column may differ from the actual room numbers used in the building. The drawings in Appendix A are annotated with the assigned numbers from the inspection and can be used to resolve any questions.

Room Description

A general description for the use of the room at the time of the inspection.

Homogeneous Material Number and Description

This column provides a number and description of all suspect ACBM in each functional space/room. A summary of homogeneous ACBM types can be found in Appendix B, Table 1. A list of non-asbestos containing homogeneous materials can be found in Appendix B, Table 2.

Bulk Sample No.

Bulk samples collected during this current inspection are listed in this column. Sample location within the room and sample analysis can be found in Appendix B, Table 3.

ACBM

This column either lists “Yes” for suspect materials determined to be an ACBM or “No” if analysis of the suspect material comes back negative for the presence of asbestos.

Friable

If a suspect material can be reduced to powder with hand pressure, “Yes” will be typed into this column.

Otherwise, “No” will be typed into the column.

ACBM Quantity

The quantity of a specific ACBM located within a room will be listed in this column.

Units

This column lists how the ACBM was measured (SF = square feet; EA = each; LF = linear feet).

Asbestos Re-Inspection Report Page 21

February 28, 2014

Hazard Rank and Removal Priority

Per AHERA regulations, each known and/or assumed friable asbestos-containing material is assessed for condition and is assigned a Hazard Rank number and Removal Priority number which are listed in these two columns. The Hazard Rank and Removal Priority for Friable ACBM table is located on the following page as a supplement to Table B and details the procedure for assigning AHERA Hazard Ranking and Removal Priorities for materials based on the degree of damage observed.

Asbestos Re-Inspection Report Page 22

February 28, 2014

Supplement to Table B: Room by Room Summary of Suspect and Confirmed ACBMs

Response Actions Based on Hazard Ranking

Hazard Rank Removal Priority

AHERA

Categories Response Actions Required by AHERA

7 1 Significantly Damaged

Evacuate or restrict the area if needed. Remove the ACBM

(or enclose or encapsulate it if sufficient to contain fibers).

Repair of TSI allowed if feasible and safe. O&M required for all

ACBM.

6 2

Damaged with Potential for Significant Damage

Evacuate or restrict the area if needed. Remove, enclose, encapsulate, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all ACBM.

5 3 Damaged with Potential for

Damage

Remove, enclose, encapsulate, or repair to correct damage.

O&M required for all ACBM.

4 4 Damaged with

Low Potential for Damage

Same as Hazard Rank 5

3 5

Good with Potential for Significant Damage

Evacuate or restrict the area if needed. Take steps to reduce potential for disturbance.

O&M required for all ACBM.

2 6 Good with

Potential for Damage

O&M required for all ACBM.

Take steps to reduce potential for damage.

1 7 Good with Low

Potential for Disturbance

O&M required for all ACBM

Notes:

O&M Operations and Maintenance ACBM Asbestos Containing Building Materials TSI Thermal System Insulation

TABLE B: Room-by-Room Summary of Suspect and Confirmed ACBM’s

Facility Name: Missoula Federal Building Address: 200 East Broadway City, State, ZIP Code: Missoula, Montana 59802-4530 Building Number: MT0017ZZ Date of Inspection:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.