Document_D_-_Butte_Asbestos_Inspection_(drawings_removed).pdf

PDF 11 MB Posted

Attached to
Montana FOB/CH/PO Full Facilities Maintenance Services
Solicitation number
47PJ0018R0027
Issued by

About this file

Document D - Butte Asbestos Inspection (drawings removed)

View the file

Other files

File Type Posted
Amendment_0005_-_Q&As.pdf PDF
Amendment_0004_-_Additional_Questions_and_Answers.pdf PDF
Document_C_-_Bozeman_Asbestos_Inspection_(drawings_removed).pdf PDF
Amendment_0003_-_Correct_Deliverable_and_Submittal_Information.pdf PDF
Revised_-_Solicitation_Sections_A-M_-_Amendment_0003.pdf PDF
Document_G_-_Battin_dates_for_next_PMs.pdf PDF
Document_B_-_Billings_Asbestos_Inspection.pdf PDF
Attachment_13_-_Pricing_Worksheet_-_OFFEROR_SHALL_VERIFY_TOTALS_ARE_CORRECT_-_Amendment_0002.xlsx XLSX spreadsheet
Document_I_-_Butte_dates_for_next_PMs.pdf PDF
Document_J_-_Missoula_dates_for_next_PMs.pdf PDF
Document_A_-_Site_Visit_Sign_in_Sheets.pdf PDF
Document_E_-_Missoula_Asbestos_Inspection_(drawings_removed).pdf PDF
Amendment_0002_-_Questions_and_Answers_with_Associated_Changes.pdf PDF
Document_F_-_Excel_Equipment_List.xlsx XLSX spreadsheet
Document_H_-_Bozeman_dates_for_next_PMs.pdf PDF
Revised_-_Solicitation_Sections_A-M.pdf PDF
Attachment_14_-_Offeror_Experience_-_Amendment_0001.docx DOCX document
Amendment_0001_-_Solicitation_Changes.pdf PDF
Continuation_of_SF1449_-_Montana_FOB,_CH,_and_PO_Solicitation_-_Amendment_0001.pdf PDF
Attachment_10_-_Bozeman_FOB_and_PO_Boundary_for_Snow_Removal_and_Grounds_Maintenance.pdf PDF
Attachment_13_-_Pricing_Worksheet_-_OFFEROR_SHALL_VERIFY_TOTALS_ARE_CORRECT.xlsx XLSX spreadsheet
Attachment_14_-_Offeror_Experience.docx DOCX document
Solicitation_47PJ0018R0027.pdf PDF
Attachment_09_-_Billings_CH_Boundary_for_Snow_Removal_and_Grounds_Maintenance.pdf PDF
Attachment_01_-_Register_of_Wage_Determination_-_Collective_Bargaining_Agreement.pdf PDF
Attachment_11_-_Butte_FOB_and_CH_Boundary_for_Snow_Removal_and_Grounds_Maintennace.pdf PDF
Attachment_04_-_Secondary_Wage_Determination_2015-5399_Revision_5_dated_01.10.2018_-_Gallatin_and_Silver_Bow_County_-_Butte_and_Bozeman.pdf PDF
Attachment_12_-_Missoula_FOB_and_PO_Boundary_for_Snow_Removal_and_Gounds_Maintenance.pdf PDF
Attachment_07_-_Equipment_Inventory_List_-_Butte_FOB_and_CH,_dated_04.17.2018.pdf PDF
Attachment_05_-_Equipment_Inventory_List_-_Billings_CH,_dated_04.17.2018.pdf PDF
Attachment_06_-_Equipment_Inventory_List_-_Bozeman_FOB_and_PO,_dated_04.17.2018.pdf PDF
Attachment_15_-_Offeror_Past_Performance_Questionnaire.docx DOCX document
Attachment_03_-_Secondary_Wage_Determination_2015-5393_Revision_5_dated_01.10.2018_-_Missoula_County_-_Missoula_Builing.pdf PDF
Attachment_08_-_Equipment_Inventory_List_-_Missoula_FOB_and_PO,_dated_04.17.2018.pdf PDF
Attachment_02_-_Secondary_Wage_Determination_2015-5389_Revision_5_dated_01.10.2018_-_Yellowstone_County_-_Billings_Building.pdf PDF
2018.04.18_-_Site_Visit_Schedule_Change.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 28, 2014

Asbestos Re-Inspection Report Mike Mansfield Federal Building/U.S. Courthouse

400 North Main Street, Butte, MT, 59701-8866 GSA Building No.: MT0004ZZ

Prepared For:

General Services Administration/Public Buildings Services Acquisition Management Group, 8P2PQ

DFC Building 41 – Room 240 Denver, Colorado 80225

Pinyon Project No.:

1/13-346-09.8004.0014

GENERAL BUILDING and CONSULTANT INFORMATION

Client General Services Administration/Public Buildings Services

Contact Thomas Record, Regional Industrial Hygienist

Client Telephone # 303.236.2549

Facility Inspected Mike Mansfield Federal Building/U.S. Courthouse

Facility Address 400 North Main Street, Butte, MT, 59701-8866

Date(s) of Re-Inspection January 7, 8, 2014

Building Number MT0004ZZ

Consulting Firm Name CTA Construction & Environmental, LLC., on behalf of Pinyon Environmental, Inc.

Consulting Firm Address 219 Second Ave South, Great Falls, MT, 59405

Consulting Firm Telephone # 406.452.3321

Laboratory Address EMSL Analytical, Inc. - 200 Route 130 North, Cinnaminson, New Jersey, 08077

Laboratory Telephone # 800.220.3675

GENERAL BUILDING and CONSULTANT INFORMATION

Mike Mansfield Federal Building/U.S. Courthouse 400 Main Street North

Butte, Montana GSA Building Location Code – MT0004ZZ

Date(s) of Construction 1904 and 1934

Square Footage 73,339

Construction Brick and Stone

Structural Steel

Exterior Brick and Stone

Interior Plaster/lathe & gypsum wallboard (GWB) combination over framing

Entrances 6

HVAC System Natural Gas Boilers

Space Utilization U.S. Courthouse, Post Office, and various offices

Table of Contents

EXECUTIVE SUMMARY

1. Introduction and Scope of Work

2. Inspection Procedures

2.1 Inspection and Sampling

2.2 Laboratory Analysis

2.3 Quality Assurance and Quality Control

3. Survey Findings

3.1 Building Description

3.2 Findings

4. Conclusions and Recommendations

4.1 Conclusions

4.2 Recommendations

5. Removal Cost Estimate

6. Limitations

7. References

Appendices:

Appendix A – Figures

Figure A-1.1 – Suspect ACBM Samples and Photographs - Basement Figure A-1.2 – Suspect ACBM Samples and Photographs – First Floor Figure A-1.3 – Suspect ACBM Samples and Photographs – Second Floor Figure A-1.4 – Suspect ACBM Samples and Photographs – Third Floor Figure A-1.5 – Suspect ACBM Samples and Photographs – Attic Figure A-1.6 – Suspect ACBM Samples and Photographs – Light Court Roof Figure A-1.7 – Suspect ACBM Samples and Photographs - Roof Figure A-2.1a – Confirmed ACBM Flooring Materials - Basement Figure A-2.1b – Confirmed ACBM Piping and Ducting Materials - Basement Figure A-2.2a – Confirmed ACBM Flooring Materials – First Floor Figure A-2.2b – Confirmed ACBM Piping Materials – First Floor Figure A-2.3a – Confirmed ACBM Flooring Materials – Second Floor Figure A-2.3b – Confirmed ACBM Wall Materials – Second Floor Figure A-2.3c – Confirmed ACBM Above Ceiling Materials – Second Floor Figure A-2.3d – Confirmed ACBM Piping Materials – Second Floor Figure A-2.4a – Confirmed ACBM Flooring Materials – Third Floor Figure A-2.4b – Confirmed ACBM Piping Materials – Third Floor Figure A-2.5a – Confirmed ACBM Piping Materials - Attic Figure A-2.6a – No ACBM Identified – Light Court Roof Figure A-2.7a – No ACBM Identified – Roof

Appendix B – Tables

Table B-1 – Summary of Confirmed Asbestos-Containing Materials and Recommended Response Actions

Table B-2 – Summary of Materials Confirmed Not To Contain Asbestos Table B-3 – Bulk Sample Analysis Results

Table of Contents (continued)

Appendix C – Laboratory Analysis Report and Chain of Custody

Appendix D – Photographic Log

Appendix E – Abatement Documents

Appendix F – General Inspection Information Asbestos Overview Sample Collection Requirements Material Category List Glossary

Appendix G – Inspector and Laboratory Certifications

Mike Mansfield Federal Building – 400 N. Main St, Butte, MT

EXECUTIVE SUMMARY

CTA Construction & Environmental, LLC. (CTA), on behalf of Pinyon Environmental, Inc., was retained by General Services Administration (GSA) to perform asbestos re-inspection services at the Mike Mansfield Federal Building/U.S. Courthouse (GSA Building number MT0004ZZ), located at 400 North Main Street in Butte, MT 59701-8866 (Site).

The building was constructed in 1904 and 1934. The facility inspected is a three-story, brick and stone structure with a full basement and an attic. It encompasses a total of 73,339 square feet of building space.

During this re-inspection completed on January 7 and 8, 2014, two additional suspect asbestos-containing building materials were identified. The materials were analyzed by Polarized Light Microscopy (PLM). Upon PLM analysis, the materials were determined to not contain asbestos.

Abatement History

Some of the ACBM(s) outlined in the 2007 inspection are no longer present in all, or any, of the locations detailed in that report. This information is summarized below, to extents feasible.

According to the 2007 inspection and supported by CTA’s field verification, all straight-run, Duplex® insulated pipes are domestic pipes. There are two (2) distinct Duplex® insulations present. The larger main city water supply lines exhibit a black core material underlying the felt layers (T3.5B), while the smaller domestic feeder lines have a white core material underlying the felt layers (T3.5A). This is true for both 1904 and 1934 construction dates. Results of additional sampling completed during the 2007 inspection indicated that only the white core, inner layer portion of the duplex insulation on domestic feeder lines (T3.5A) was asbestos-containing. The felt layers from both Duplex insulations and the black core material observed on T3.5B were determined to be non-asbestos.

In 2010, Abatement Contractors of Montana (ACM) were contracted to remove and clean asbestos-containing pipe insulation and associated debris from the west side of the basement of the facility. According to the clearance report by Affinity Environmental, dated November 18, 2010, the aforementioned materials were abated from the following Rooms: B-13; B-17; B-19; B-21; and, B-23. This abatement/clearance report has been included for reference as Appendix E. CTA observed during this re-inspection, that similar materials were either completely and/or partially removed from the following additional Rooms: B-03; B-03B; B-09; B- 11; B-15; and, B-25, whether by ACM or another contractor. Additionally, CTA observed that boiler flue insulation materials (T6.2) had been removed completely from Room B-25 and partially from Room B-05, and that the cut edge was sealed with spray foam to limit any potential material deterioration and/or exposures.

In 2013, ACM was contracted to remove and clean asbestos-containing pipe insulation and associated debris from the attic space of the facility. According to the clearance report by Indoor/Outdoor Environmental, LLC, ACM removed the aforementioned materials from approximately 150 foot of piping, as documented by CTA observation along the north end of Rooms 401 and 402 and from the east side of Room 402. This abatement/clearance report has been included for reference as Appendix E. Two (2) areas of damaged Thermal System Insulation (TSI) were observed by CTA along Room 401. CTA used a spray adhesive to coat over the damaged areas observed during this re-inspection to further limit the potential for any fiber release and/or exposures.

Two (2) ACBMs outlined in the 2007 inspection report were not observed by CTA personnel during the 2014 re-inspection. These materials include the following: olive/gray 9-inch by 9-inch floor tiles with orange and white streaks (F3.1-04); and, 2-foot by 5-foot ceiling tiles with lengthwise deep large fissures and pinholes (M5.5-34).

Asbestos Findings

CTA conducted an asbestos re-inspection at the Mike Mansfield Federal Building/U.S. Courthouse on January 7 and 8, 2014. Materials assumed to contain asbestos were not sampled to protect structural integrity. The following suspect homogeneous materials were confirmed or assumed to contain asbestos:

Material Description Material Number and Additional Comments

Linoleum F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM)

Linoleum F1.3-04: Green octagon vinyl sheet flooring (ND), backing (ACM)

Linoleum F1.4-04: Beige marbled vinyl sheet flooring (ND), backing (ACM)

12” x 12” Floor Tile F2.2-04: 12”x12” Brown floor tile (ACM), mastic (ND)

12” x 12” Floor Tile F2.3-04: 12”x12” Off-white floor tile (ND), mastic (ACM)

12” x 12” Floor Tile F2.3-34: 12”x12” Off-white floor tile (ND), mastic (ACM)

12” x 12” Floor Tile F2.4-04: 12”x12” Light gray floor tile (ND), mastic (ACM)

12” x 12” Floor Tile F2.4-34: 12”x12” Light gray floor tile (ND), mastic (ACM)

Mastic under Floor Tile/etc. F5.1-34: Residual Black Mastic (under carpet)

Ceiling Panels M5.7-04: 2’x4’ Two-sized fissure & pinholes (above current ceiling)

Ceilings and Beams (Walls) S1.4: Gray acoustic wall texture (under carpet-covered gypsum)

Pipe Joint Insulation T2.4: Domestic pipe fitting insulation on Duplex feeder lines

Pipe Joint Insulation T2.5: Pipe joint insulation on MAG or Duplex-insulated main lines

Pipe Joint Insulation T2.7: Heating pipe fitting insulation on abandoned Mag lines

Straight Pipe Insulation T3.5A: Domestic straight-run feeder pipe insulation - Duplex

Straight Pipe Insulation T3.7: Heating straight-run pipe insulation – abandoned Mag lines

Straight Pipe Insulation T3.8: Domestic straight-run pipe insulation - Aircell

Boiler Insulation T6.2-04: Boiler flue insulation (round)

Notes: ACBMs removed from this list following the 2007 Re-inspection included: F3.1-04 (9” x 9” Floor tiles), and M5.5-34 (2’ x 5’ Ceiling tiles), as these materials were not observed in the 2014 Re-inspection.

Two (2) new suspect materials identified during this re-inspection (i.e. M3.8 – gypsum wallboard material with tape and mud from the wall partition addition to Room 181A; and, F5.2 – black felt underlayment beneath carpeting in the west corridor of Room 301) were observed and sampled, with laboratory analysis confirming the materials to be free of asbestos.

Recommendations

Based on the results of laboratory analysis of bulk samples and visual and tactile assessment of building materials previously confirmed to contain asbestos, CTA recommends the following specific management actions:

Material Description Material Number and Additional Comments

Management Recommendations

Linoleum F1.1-34: Cream vinyl sheet flooring. Backing (ACM) O&M

Linoleum F1.3-04: Green vinyl sheet flooring. Backing (ACM) O&M

Linoleum F1.4-04: Beige vinyl sheet flooring. Backing (ACM) O&M

12”x12” Floor Tile F2.2-04: 12”x12” Brown floor tile (ACM), mastic (ND) O&M

12”x12” Floor Tile F2.3-04: 12”x12” Off-white floor tile. Mastic (ACM) O&M

12”x12” Floor Tile F2.3-34: 12”x12” Off-white floor tile. Mastic (ACM) O&M

12”x12” Floor Tile F2.4-04: 12”x12” Light gray floor tile. Mastic (ACM) O&M

12”x12” Floor Tile F2.4-34: 12”x12” Light gray floor tile. Mastic (ACM) O&M

Mastic under Floor Tile/etc.

F5.1-34: Residual Black Mastic (under carpet) O&M

Ceiling Panels M5.7-04: 2’x4’ Two-sized fissure & pinholes (above newer drop ceiling) O&M

Ceilings and Beams (Walls)

S1.4: Gray acoustic wall texture (under carpet-covered gypsum) O&M

Pipe Joint Insulation T2.4: Domestic pipe fitting insulation on Duplex feeder lines O&M

Pipe Joint Insulation T2.5: Domestic pipe fitting insulation on MAG or Duplex-insulated main lines

O&M

Pipe Joint Insulation T2.7: Heating pipe fitting insulation on abandoned Mag lines O&M

Straight Pipe Insulation

T3.5A: Domestic straight-run feeder pipe insulation – Duplex. Gray layers (ND), White core (ACM) O&M

Straight Pipe Insulation

T3.7: Heating straight-run pipe insulation – abandoned Mag lines

O&M

Straight Pipe Insulation

T3.8: Domestic straight-run pipe insulation - Aircell O&M

Boiler Insulation T6.2-04: Boiler flue insulation (round) O&M

Notes:

O&M Operations and Maintenance

1. Introduction and Scope of Work

CTA Construction & Environmental, LLC. (CTA) was retained by Pinyon Environmental who was retained by General Services Administration (GSA) to perform a re-inspection asbestos survey of the Mike Mansfield Federal Building/U.S. Courthouse (GSA Building number MT0004ZZ), located at 400 North Main Street in Butte, MT 59701-8866. The purpose of this survey was to identify friable and non-friable suspect asbestos-containing building materials (ACBM).

The scope of this inspection included the following activities:

Surveying, identifying, and sampling suspect friable and non-friable ACBM.

Preparing this comprehensive report documenting the sampling procedures and results of the ACBM survey.

To accomplish this survey, all accessible areas of the building were identified by name and assigned room numbers.

A summary of identified functional spaces is presented in Table 3-1.

Within each space, suspect building materials were identified. C T A uses a standardized numbering format to identify suspect building materials, and to identify bulk samples.

The report contains six sections. The six sections are: introduction and scope of work; inspection procedures;

survey findings; conclusions and recommendations; removal cost estimate; and limitations sections. The report also contains seven appendices. Appendix A contains figures, Appendix B contains tables, Appendix C contains the laboratory analysis reports and chain of custodies, Appendix D contains a Photographic Log, Appendix E contains abatement and/or clearance report documents, Appendix F contains general inspection information, and Appendix G contains inspector and laboratory certification.

2. Inspection Procedures

The asbestos survey was performed using the applicable portions of the currently recognized standard protocol developed for schools under AHERA, as promulgated in Title 40, Code of Federal Regulations (40 CFR), Part 763 and as amended in the Federal Register (EPA, 2011). Since the primary concern for this investigation was to identify potential asbestos hazards in the entire building, a CTA representative visually inspected existing conditions within the entire facility. An overview of asbestos and current regulations and a glossary of common terms are presented in Appendix F.

2.1 Inspection and Sampling

The inspection was conducted by our State certified and AHERA accredited asbestos inspector, and consisted of a detailed visual survey of surfacing materials, thermal system insulation, and miscellaneous materials throughout the building. Suspect ACBM was then grouped into homogeneous materials and sampling plans developed. Components of the inspection included:

Identification of homogeneous suspect materials on a room by room basis (Appendices A and B).

An assessment of known or assumed ACBM, generally classifying the materials using categories defined in the AHERA and National Emission Standards of Hazardous Air Pollutants (NESHAP), for asbestos. A description of NESHAP categories is presented in the Section 3 Room-By-Room Table Key.

Homogeneous suspect ACBM’s were, for the purpose of this study, placed into the following four materials type categories: Thermal System Insulation (TSI), surfacing materials, miscellaneous materials, and floor covering. AHERA sampling protocol specifies sampling procedures for each material type (Appendix F).

Sample locations for this survey were chosen in a non-random fashion, with emphasis placed on obtaining samples of each type of accessible, suspect material and minimizing damage to the material being sampled (Appendix A Figure A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, and A-1.7). Samples were collected by carefully removing small portions of the suspect material in a non-abrasive manner. If possible, samples from existing damaged areas or loose pieces of material were collected. Samples were obtained by using techniques such as wet slicing, wet boring or similar methods designed to limit contamination of the area during sampling. The sampled area was sealed using patching compounds, duct tape, or spray encapsulates as appropriate to the material being sampled.

Immediately after collection, samples were placed in pre-labeled plastic containers. Containers with samples were then placed in a large re-sealable plastic bag for transportation to the laboratory.

Documentation of our inspector’s asbestos accreditations is included as Appendix G.

2.2 Laboratory Analysis

Bulk samples obtained during the inspection were assigned bulk sample numbers and entered on sample chain-of-custody forms, followed by being shipped to EMSL Analytical, Inc. (EMSL) in Cinnaminson, New Jersey.

Laboratory analysis was performed in accordance with EPA Method 600/R-93/116, which employs polarized light microscopy (PLM) with dispersion staining for identification of mineral forms of asbestos, and has a limit of detection (LOD) of approximately 1%, by volume.

2.3 Quality Assurance and Quality Control

Quality Assurance and Quality Control (QA/QC) measures adopted by CTA involved both field and office components. Key parameters are summarized below:

Field QA/QC

Review inspection forms for completeness

Check homogeneous materials listing for sufficient number of collected samples

Verify locations of major mechanical components

Office QA/QC

Review lab results for completeness

Ensure appropriate cross-referencing of results, forms for given ACBM

Ensure drawings are updated as necessary following field QC

Verify approximate quantities of ACBM based on drawing review

Review recorded field comments for meaning, incorporate as necessary into report

3. Survey Findings

3.1 Building Description

The Mike Mansfield Federal Building/U.S. Courthouse was constructed in 1904 and 1934. The facility is a three-story, brick and stone structure with a full basement and an attic. It encompasses a total of 73,339 square feet of building space.

Table 3-1 summarizes each room/functional space by floor, room number, description, and additional comments as necessary.

3.2 Findings

CTA conducted an asbestos re-inspection at the Mike Mansfield Federal Building/U.S. Courthouse on January 7 and 8, 2014. Materials assumed to contain asbestos were not sampled to protect structural integrity.

While the two (2) suspect homogeneous materials, sampled during the 2014 re-inspection, were confirmed not to contain asbestos, the following materials were previously assumed and/or confirmed to contain asbestos:

Material Description Material Number and Additional Comments

Linoleum F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM)

Linoleum F1.3-04: Green octagon vinyl sheet flooring (ND), backing (ACM)

Linoleum F1.4-04: Beige marbled vinyl sheet flooring (ND), backing (ACM)

12” x 12” Floor Tile F2.2-04: 12”x12” Brown floor tile (ACM), mastic (ND)

12” x 12” Floor Tile F2.3-04: 12”x12” Off-white floor tile (ND), mastic (ACM)

12” x 12” Floor Tile F2.3-34: 12”x12” Off-white floor tile (ND), mastic (ACM)

12” x 12” Floor Tile F2.4-04: 12”x12” Light gray floor tile (ND), mastic (ACM)

12” x 12” Floor Tile F2.4-34: 12”x12” Light gray floor tile (ND), mastic (ACM)

Mastic under Floor Tile/etc. F5.1-34: Residual Black Mastic (under carpet)

Ceiling Panels M5.7-04: 2’x4’ Two-sized fissure & pinholes (above current ceiling)

Ceilings and Beams (Walls) S1.4: Gray acoustic wall texture (under carpet-covered gypsum)

Pipe Joint Insulation T2.4: Domestic pipe fitting insulation on Duplex feeder lines

Pipe Joint Insulation T2.5: Pipe joint insulation on MAG or Duplex-insulated main lines

Pipe Joint Insulation T2.7: Heating pipe fitting insulation on abandoned Mag lines

Straight Pipe Insulation T3.5A: Domestic straight-run feeder pipe insulation - Duplex

Material Description Material Number and Additional Comments

Straight Pipe Insulation T3.7: Heating straight-run pipe insulation – abandoned Mag lines

Straight Pipe Insulation T3.8: Domestic straight-run pipe insulation - Aircell

Boiler Insulation T6.2-04: Boiler flue insulation (round)

Notes:

‘ feet “ inches ND None Detected ACM Asbestos Containing Materials O&M Operations and Maintenance

TABLE 3-1: Functional Space Summary

Floor Room Functional Space Comments 1 100 ENTRANCES AND EXIT AREAS Elevator Lobby 1 100A LOBBIES Public Lobby/Hallway 1 100B HALLWAYS Public Hallway 1 100C ELEVATOR ROOM/HOISTWAYS Elevator 1 100D ELEVATOR ROOM/HOISTWAYS Elevator 1 101 OFFICES Office-US Air Force 1 101A OFFICES Office - GSA 1 103 MEETING ROOMS Conference Room 1 110 HALLWAYS FBI Vestibule 1 110A OFFICES FBI General Work Area 1 110B OFFICES FBI General Work Area 1 111 OFFICES US Marshall 1 111A OFFICES US Marshall Office 1 111B OFFICES US Marshall Office 1 111C MEETING ROOMS Conference Room 1 119 OFFICES Office - FBI 1 121 OFFICES Office - FBI 1 122 WORK ROOM FBI Mail Room 1 123 OFFICES Office - FBI 1 124 OFFICES Office - FBI 1 125 OFFICES Office - FBI 1 126 VAULTS FBI Vault 1 127 TELEPHONE/ELEC. ROOMS FBI Tele/Comm 1 128 VAULTS Vault – FBI Communication 1 129 OFFICES Office - FBI 1 129A RESTROOM FBI – Women’s Room 1 130 STAIRWELLS Stairs – FBI 1 141 STAIRWELLS Stairs 1 146 OFFICES FBI General Office Area 1 147 RESTROOM FBI – Men’s Room 1 149 JANITOR CLOSET Janitor – FBI 1 150 OFFICES US Department of Justice Comm 1 151 MEETING ROOMS FBI Break Room 1 153 OFFICES Office - FBI 1 155 OFFICES Office - FBI 1 157 OFFICES Office – US Department of Justice 1 159 OFFICES Office – US Department of Justice 1 160 STAIRWELLS Stairs 1 170 RESTROOM Restroom – Men 1 172 RESTROOM Restroom - Women 1 174 N/A US Department of Justice Library 1 174A STORAGE Storage – US Department of Justice 1 176 MECHANICAL ROOM Electrical Closet 1 181 HALLWAYS US Department of Justice Vestibule 1 181A HALLWAYS Hallway – US Department of Justice

1 181B N/A Closet – US Department of Justice 1 181C OFFICES US Department of Justice Sec. Area 1 185 OFFICES Copy – US Department of Justice 1 187 OFFICES Office – US Department of Justice 1 189 VAULTS Vaults – US Department of Justice 1 190 STORAGE Storage – US Department of Justice 1 191 OFFICES Office – US Department of Justice 1 192 VAULTS Vaults – US Department of Justice 1 193 OFFICES Office – US Department of Justice 1 194 PIPE CHASES All First Floor Pipe Chases 1 195 OFFICES Mezzanine office located above 129 2 200 LOBBIES Elevator Lobby 2 200A HALLWAYS Public Hallway 2 200B HALLWAYS Public Hallway 2 201 OFFICES Office – US Bankruptcy Court 2 205 OFFICES US District Court Courtroom 2 205A OFFICES Jury Room 2 205B RESTROOM Men’s Restroom Foyer 2 205C RESTROOM Men’s Restroom 2 205D RESTROOM Women’s Restroom Foyer 2 205E RESTROOM Women’s Restroom 2 215 OFFICES Judge Chambers 2 215A RESTROOM Restroom – Judge 2 219 OFFICES Secretary Office 2 221 STAIRWELL Stair 2 221A STORAGE Storage 2 223 OFFICES Law Clerk 2 223A OFFICES Law Library 2 223B VAULTS Storage Vault 2 235 OFFICES Office – US D.C. Secretary 2 235A OFFICES Office – US D.C. Law 2 239 OFFICES US D.C. Judges Chamber 2 239A RESTROOM Restroom – US D.C. Judges 2 241 STAIRWELLS Stairs 2 253 OFFICES Office – US Marshall 2 253A N/A Holding Cell 2 253B RESTROOM Restroom 2 256 OFFICES U.S.B.C. Storage 2 258 RESTROOM Restroom – Women 2 260 STORAGE Storage – Janitor 2 262 RESTROOM Restroom – Men 2 263 OFFICES District Court Law Library 2 263A OFFICES Judges Chambers 2 265 COMPUTER ROOM District Court Server Room 2 269 OFFICES U.S.B.C. Office 2 273 OFFICES U.S.B.C. Office

2 277 OFFICES US Bankruptcy Court 2 281 OFFICES US Bankruptcy Court Office 2 282 PIPE CHASES All First Floor Pipe Chases 3 300 STAIRWELLS Entry/Stairs 3 301 HALLWAYS Public Hallway 3 301A HALLWAYS Public Hallway 3 303 OFFICES B.C. Clerk Office 3 303A OFFICES B.C. Clerk Office 3 303B OFFICES B.C. Clerk Office 3 315 OFFICES B.C. Jury Room 3 315A RESTROOM Women’s Restroom Foyer 3 315B RESTROOM Women’s Restroom 3 315C RESTROOM Men’s Restroom Foyer 3 315D RESTROOM Men’s Restroom 3 323 OFFICES B.C. Petit Jury Room 3 323A RESTROOM Jury Restroom 3 323B RESTROOM Jury Restroom 3 331 N/A FBI Exercise Room 3 331A RESTROOM Restroom 3 331B RESTROOM Restroom 3 339 OFFICES GSA Office 3 339A OFFICES GSA Office 3 341 STAIRWELLS Stairs 3 354 OFFICES Office – B.C.

3 355 OFFICES Office – B.C.

3 355A OFFICES Office – B.C.

3 355B OFFICES Office – B.C.

3 355C OFFICES Office – B.C.

3 356 RESTROOM Women’s Restroom 3 359 OFFICES Office – B.C.

3 361 OFFICES Office – B.C.

3 361A OFFICES Office – B.C.

3 363 OFFICES Office – B.C.

3 364 N/A Janitor 3 365 OFFICES Office – B.C.

3 366 RESTROOM Men’s Restroom 3 371 OFFICES Office – B.C.

3 373 MEETING ROOMS Break Room 3 377 OFFICES Office - Vacant 3 377A OFFICES Office - Vacant 3 381 OFFICES Office - Vacant 3 382 PIPE CHASES All First Floor Pipe Chases A 401 ATTICS 1904 Attic A 402 ATTICS 1934 Attic A 403 STAIRWELLS No suspect materials R 501 EXTERIOR 1904 Light Court

R 502 EXTERIOR 1934 Light Court 5 503 MECHANICAL ROOM Mechanical room in old light court R 601 ROOFS Roof – 1904 and 1934 Construction E 701 EXTERIOR Exterior – 1904 and 1934 Construction B B01 OFFICES Custodial – GSA B B01A ENTRANCES AND EXIT AREAS Entry B B03 OFFICES Office – Vacant B B03A N/A Closet – Vacant B B03B VAULTS Vault – Vacant B B04 HALLWAYS Elevator Hallway B B05 MECHANICAL ROOM Boiler Room B B07 STORAGE Storage B B09 STORAGE Storage – FBI B B11 STORAGE Storage – US District Court B B13 STORAGE Storage – Bankruptcy Court B B15 STORAGE Storage - Vacant B B17 STORAGE Storage - Vacant B B19 STORAGE Storage - Vacant B B21 STORAGE Storage - Vacant B B23 STORAGE Storage - Vacant B B24 STORAGE Storage - GSA B B25 STORAGE Storage – GSA B B26 HALLWAYS Hall – GSA B B26A HALLWAYS Hall – GSA B B27 TELEPHONE/ELEC. ROOMS Communication Equipment Room B B30 STAIRWELLS Stair B B39 FITNESS CENTER Exercise Room B B40 STORAGE Storage – FBI B B41 STAIRWELLS Stairs B B42 STORAGE Storage – FBI B B43 TELEPHONE/ELEC. ROOMS Telephone Room B B44 OFFICES Office – FBI B B46 STORAGE Storage – FBI B B47 TELEPHONE/ELEC. ROOMS Electrical Room B B49 OFFICES Office – Vacant B B51 STORAGE Storage – FBI B B60 STAIRWELLS Stairs B B61 ENTRANCES AND EXIT AREAS Entrance B B63 OFFICES Office – FBI B B65 OFFICES Office – FBI B B74 OFFICES Office – FBI B B75 RESTROOM Restroom – Men B B79 MULTI-PURPOSE ROOM Break Room B B79A RESTROOM Restroom B B81 RESTROOM Restroom – Women B B85 HALLWAYS Public Hallway

B B85A HALLWAYS Public Hallway B B87 RESTROOM Restroom – Handicap B B95 MECHANICAL ROOM Flue Chase (basement to roof)

Notes: Functional space records could not be obtained by CTA. The functional spaces summarized above are consistent with those reported in the 2007 inspection.

Table B Key

The following is an explanation of each column listed in Table B:

Floor No.

The floor level of the building.

Room No.

A list of all spaces in numeric order. Due to the need for each inspected space to have a unique identifying number, the room numbers in this column may differ from the actual room numbers used in the building. The drawings in Appendix A are annotated with the assigned numbers from the inspection and can be used to resolve any questions.

Room Description

A general description for the use of the room at the time of the inspection.

Homogeneous Material Number and Description

This column provides a number and description of all suspect ACBM in each functional space/room. A summary of homogeneous ACBM types can be found in Appendix B, Table 1. A list of non-asbestos containing homogeneous materials can be found in Appendix B, Table 2.

Bulk Sample No.

Bulk samples collected during this current inspection are listed in this column. Sample location within the room and sample analysis can be found in Appendix B, Table 3.

ACBM

This column either lists “Yes” for suspect materials determined to be an ACBM or “No” if analysis of the suspect material comes back negative for the presence of asbestos.

Friable

If a suspect material can be reduced to powder with hand pressure, “Yes” will be typed into this column.

Otherwise, “No” will be typed into the column.

ACBM Quantity

The quantity of a specific ACBM located within a room will be listed in this column.

Units

This column lists how the ACBM was measured (SF = square feet; EA = each; LF = linear feet).

Table B Key (continued)

Hazard Rank and Removal Priority

Per AHERA regulations, each known and/or assumed friable asbestos-containing material is assessed for condition and is assigned a Hazard Rank number and Removal Priority number which are listed in these two columns. The Hazard Rank and Removal Priority for Friable ACBM table is located on the following page as a supplement to Table B and details the procedure for assigning AHERA Hazard Ranking and Removal Priorities for materials based on the degree of damage observed.

Supplement to Table B: Room by Room Summary of Suspect and Confirmed ACBMs

Response Actions Based on Hazard Ranking

Hazard Rank Removal Priority AHERA Categories

Response Actions Required by AHERA

7 1 Significantly Damaged

Evacuate or restrict the area if needed. Remove the ACBM

(or enclose or encapsulate it if sufficient to contain fibers).

Repair of TSI allowed if feasible and safe. O&M required for all

ACBM.

6 2

Damaged with Potential for Significant Damage

Evacuate or restrict the area if needed. Remove, enclose, encapsulate, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all ACBM.

5 3 Damaged with Potential for

Damage

Remove, enclose, encapsulate, or repair to correct damage.

O&M required for all ACBM.

4 4 Damaged with

Low Potential for Damage

Same as Hazard Rank 5

3 5

Good with Potential for Significant Damage

Evacuate or restrict the area if needed. Take steps to reduce potential for disturbance.

O&M required for all ACBM.

2 6 Good with

Potential for Damage

O&M required for all ACBM.

Take steps to reduce potential for damage.

1 7 Good with Low

Potential for Disturbance

O&M required for all ACBM

Notes:

O&M Operations and Maintenance ACBM Asbestos Containing Building Materials TSI Thermal System Insulation

TABLE B: Room-by-Room Summary of Suspect and Confirmed ACBM’s

Floor No.

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 100 Elevator Lobby M7.1-04: Walls - Plaster None No No 0 NA NA NA 1 100 Elevator Lobby Floor - Terrazzo, Marble None No No 0 NA NA NA 1 100 Elevator Lobby Walls, Ceiling - Concrete None No No 0 NA NA NA

1 100A Public Lobby/Hallway

S1.3-04: Walls - Rough wall texture

None No Yes 0 NA NA NA

1 100A Public

Lobby/Hallway Cove base - Wood None No No 0 NA NA NA

1 100A Public Lobby/Hallway

M3.5: Walls- Elevator Project Wallboard, Tape

& Joint Compound None No No 0 NA NA NA

1 100A Public Lobby/Hallway

M3.1-04: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 100A Public Lobby/Hallway

M7.1-04: Walls - Plaster None No No 0 NA NA NA

1 100A Public

Lobby/Hallway

T3.7: Heating straight run pipe insulation -abandoned Mag lines None Yes Yes 30 LF 2 6

1 100A Public

Lobby/Hallway

T2.7: Heating pipe fitting insulation on abandoned

Mag lines None Yes Yes 1 EA 2 6

1 100A Public Lobby/Hallway

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 100A Public Lobby/Hallway

F1.3-04: Green octagon vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

476 SF 1 7

1 100A Public Lobby/Hallway

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

130 SF 1 7

1 100A Public Lobby/Hallway

M5.3-04: 2'x2' Floral pattern

None No Yes 0 NA NA NA

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 100A Public

Lobby/Hallway Floor - Carpet on

Concrete None No No 0 NA NA NA

1 100B Public Hallway M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 100B Public Hallway M5.1-34: 2'x4' Small fissure & pinhole None No Yes 0 NA NA NA

1 100B Public Hallway M3.2-34: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 100B Public Hallway Floor - Carpet on Concrete

None No No 0 NA NA NA

1 100B Public Hallway S1.3-34: Walls - Rough wall texture None No Yes 0 NA NA NA

1 100B Public Hallway F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

251 SF 1 7

1 100C Elevator No suspect materials None No No 0 NA NA NA 1 100D Elevator No suspect materials None No No 0 NA NA NA

1 101 Office-US Air Force

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 101 Office-US Air

Force T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 101 Office-US Air Force

T3.5A: Domestic straight run feeder pipe insulation

- Duplex None Yes Yes 30 LF 2 6

1 101 Office-US Air

Force

T2.5: Domestic pipe fitting insulation on Duplex main lines

None Yes Yes 4 EA 2 6

1 101 Office-US Air

Force

T2.1: Fiberglass pipe joint insulation with plastic sleeve

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 101 Office-US Air

Force S1.2-04: Walls - Smooth wall texture None No Yes 0 NA NA NA

1 101 Office-US Air

Force Floor - Carpet on

Concrete None No No 0 NA NA NA

1 101 Office-US Air Force

M5.4-04: 2'x2' Rough pinhole

None No Yes 0 NA NA NA

1 101 Office-US Air

Force

M3.1-04: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 101A Office - GSA Floor - Carpet, Stone None No No 0 NA NA NA

1 101A Office - GSA T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 101A Office - GSA M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 101A Office - GSA T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 101A Office - GSA M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 101A Office - GSA M5.4-04: 2'x2' Rough pinhole

None No Yes 0 NA NA NA

1 101A Office - GSA S1.2-04: Walls - Smooth wall texture None No Yes 0 NA NA NA

1 103 Conference Room

M3.1-04: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 103 Conference

Room

T3.5A: Domestic straight run feeder pipe insulation

- Duplex None Yes Yes 24 LF 2 6

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 103 Conference Room

T2.5: Domestic pipe fitting insulation on Duplex main lines

None Yes Yes 12 EA 2 6

1 103 Conference

Room S1.2-04: Walls - Smooth wall texture None No Yes 0 NA NA NA

1 103 Conference Room

M3.3-04: Walls - Remodel Wallboard, Tape & Joint Compound None No No 0 NA NA NA

1 103 Conference Room

M7.1-04: Walls - Plaster None No No 0 NA NA NA

1 103 Conference Room

M5.4-04: 2'x2' Rough pinhole

None No Yes 0 NA NA NA

1 103 Conference Room

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 103 Conference Room

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

221 SF 1 7

1 103 Conference

Room Floor - Carpet on

Concrete None No No 0 NA NA NA

1 110 F.B.I. Vestibule M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 110 F.B.I. Vestibule M5.1-04: 2'x4' Small fissure & pinhole

None No Yes 0 NA NA NA

1 110 F.B.I. Vestibule M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 110 F.B.I. Vestibule Floor - Carpet on

Concrete None No No 0 NA NA NA

1 110A FBI General Work Area

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 110A FBI General Work Area

T2.7: Heating pipe fitting insulation on abandoned

Mag lines None Yes Yes 12 EA 2 6

1 110A FBI General Work Area

T2.1: Fiberglass pipe joint insulation with plastic sleeve None No Yes 0 NA NA NA

1 110A FBI General Work Area

T3.7: Heating straight run pipe insulation -abandoned Mag lines None Yes Yes 150 LF 2 6

1 110A FBI General Work Area

T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 110A FBI General Work Area

Floor - Carpet on Concrete

None No No 0 NA NA NA

1 110A FBI General Work Area M7.1-04: Walls - Plaster None No No 0 NA NA NA

1 110A FBI General Work Area

M5.1-04: 2'x4' Small fissure & pinhole None No Yes 0 NA NA NA

1 110B FBI General Work Area

M3.2-34: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 110B FBI General Work Area

T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 110B FBI General Work Area

T3.5A: Domestic straight run feeder pipe insulation

- Duplex None Yes Yes 64 LF 2 6

1 110B FBI General Work Area

T3.7: Heating straight run pipe insulation -abandoned Mag lines None Yes Yes 46 LF 2 6

1 110B FBI General Work Area

T2.1: Fiberglass pipe joint insulation with plastic

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 110B FBI General Work Area

T2.5: Domestic pipe fitting insulation on Duplex main lines

None Yes Yes 5 EA 2 6

1 110B FBI General Work Area

Floor - Carpet on Concrete None No No 0 NA NA NA

1 110B FBI General Work Area M7.2-34: Walls - Plaster None No No 0 NA NA NA

1 110B FBI General Work Area

M5.1-34: 2'x4' Small fissure & pinhole

None No Yes 0 NA NA NA

1 110B FBI General Work Area

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 110B FBI General Work Area

T2.7: Heating pipe fitting insulation on abandoned

Mag lines None Yes Yes 7 EA 2 6

1 111 U.S. Marshall F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

111 SF 1 7

1 111 U.S. Marshall T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 111 U.S. Marshall M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 111 U.S. Marshall T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 111 U.S. Marshall S1.2-04: Walls - Smooth wall texture

None No Yes 0 NA NA NA

1 111 U.S. Marshall Floor - Carpet on

Concrete None No No 0 NA NA NA

1 111 U.S. Marshall M5.4-04: 2'x2' Rough pinhole None No Yes 0 NA NA NA

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 111 U.S. Marshall M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 111 U.S. Marshall M3.3-04: Walls -

Remodel Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 111A U.S. Marshall

Office M5.4-04: 2'x2' Rough pinhole None No Yes 0 NA NA NA

1 111A U.S. Marshall Office

T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 111A U.S. Marshall

Office

T2.1: Fiberglass pipe joint insulation with plastic sleeve None No Yes 0 NA NA NA

1 111A U.S. Marshall

Office S1.2-04: Walls - Smooth wall texture None No Yes 0 NA NA NA

1 111A U.S. Marshall

Office Floor - Carpet on

Concrete None No No 0 NA NA NA

1 111A U.S. Marshall Office

M3.1-04: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 111A U.S. Marshall

Office

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 111A U.S. Marshall

Office

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes

Yes (Backing) 222 SF 1 7

1 111A U.S. Marshall

Office

M3.3-04: Walls - Remodel Wallboard, Tape & Joint Compound None No No 0 NA NA NA

1 111B U.S. Marshall Office

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

154 SF 1 7

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 111B U.S. Marshall Office

M3.3-04: Walls - Remodel Wallboard, Tape & Joint Compound None No No 0 NA NA NA

1 111B U.S. Marshall Office

T2.1: Fiberglass pipe joint insulation with plastic sleeve None No Yes 0 NA NA NA

1 111B U.S. Marshall

Office T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 111B U.S. Marshall Office

S1.2-04: Walls - Smooth wall texture

None No Yes 0 NA NA NA

1 111B U.S. Marshall Office

Floor - Carpet on Concrete

None No No 0 NA NA NA

1 111B U.S. Marshall Office

M3.1-04: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 111B U.S. Marshall Office

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 111B U.S. Marshall

Office M5.4-04: 2'x2' Rough pinhole None No Yes 0 NA NA NA

1 111C Conference

Room

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 111C Conference Room

M5.4-04: 2'x2' Rough pinhole

None No Yes 0 NA NA NA

1 111C Conference

Room M7.1-04: Walls - Plaster None No No 0 NA NA NA

1 111C Conference Room

M3.1-04: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 111C Conference Room

M3.3-04: Walls - Remodel Wallboard, Tape & Joint Compound

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 111C Conference

Room Floor - Carpet on Wood None No No 0 NA NA NA

1 111C Conference

Room S1-2.04: Walls - Smooth wall texture None No Yes 0 NA NA NA

1 119 Office - F.B.I M5.2-04: 2'x4' Large fissure & pinhole

None No Yes 0 NA NA NA

1 119 Office - F.B.I Floor - Carpet on Concrete

None No No 0 NA NA NA

1 119 Office - F.B.I M3.7: Walls - Prefab wall panels, no taping or compound, nonsuspect

None No No 0 NA NA NA

1 119 Office - F.B.I T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 119 Office - F.B.I M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 119 Office - F.B.I M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 119 Office - F.B.I F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes

Yes (Backing) 237 SF 1 7

1 119 Office - F.B.I T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 119 Office - F.B.I M5.1-04: 2'x4' Small fissure & pinhole None No Yes 0 NA NA NA

1 121 Office - F.B.I M5.1-04: 2'x4' Small fissure & pinhole None No Yes 0 NA NA NA

1 121 Office - F.B.I T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 121 Office - F.B.I T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 121 Office - F.B.I Floor - Carpet on

Concrete None No No 0 NA NA NA

1 121 Office - F.B.I M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 121 Office - F.B.I M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 121 Office - F.B.I F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes

Yes (Backing) 233 SF 1 7

1 121 Office - F.B.I M3.7: Walls - Prefab wall panels, no taping or compound, nonsuspect

None No No 0 NA NA NA

1 122 FBI Mail Room M3.6: Walls - Remodel Wallboard, Tape & Joint Compound - nonsuspect

None No No 0 NA NA NA

1 122 FBI Mail Room Floor - Carpet on

Concrete None No No 0 NA NA NA

1 122 FBI Mail Room M5.1-04: 2'x4' Small fissure & pinhole None No No 0 NA NA NA

1 122 FBI Mail Room M7.1-04: Walls - Plaster None No No 0 NA NA NA

1 122 FBI Mail Room T3.7: Heating straight run pipe insulation -abandoned Mag lines

None Yes Yes 10 LF 2 6

1 122 FBI Mail Room T2.7: Heating pipe fitting insulation on abandoned

Mag lines None Yes Yes 1 EA 2 6

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 122 FBI Mail Room M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 123 Office - F.B.I.

Floor - Carpet on

Concrete None No No 0 NA NA NA

1 123 Office - F.B.I.

T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 123 Office - F.B.I. Cove base - Wood None No No 0 NA NA NA

1 123 Office - F.B.I.

M3.7: Walls - Prefab wall panels, no taping or compound, nonsuspect

None No No 0 NA NA NA

1 123 Office - F.B.I.

F1.1-34 Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

314 SF 1 7

1 123 Office - F.B.I.

M5.1-04: 2'x4' Small fissure & pinhole None No Yes 0 NA NA NA

1 123 Office - F.B.I.

M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 123 Office - F.B.I. T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 124 FBI Office M3.6: Walls - Remodel Wallboard, Tape & Joint Compound - nonsuspect

None No No 0 NA NA NA

1 124 FBI Office M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 124 FBI Office M7.1-04: Walls - Plaster None No No 0 NA NA NA

1 124 FBI Office Floor - Carpet on Concrete

None No No 0 NA NA NA

1 124 FBI Office M5.1-04: 2'x4' Small fissure & pinhole

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 125 Offices - F.B.I T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 125 Offices - F.B.I Floor - Carpet on

Concrete None No No 0 NA NA NA

1 125 Offices - F.B.I M3.7: Walls - Prefab wall panels, no taping or compound, nonsuspect

None No No 0 NA NA NA

1 125 Offices - F.B.I M3.1-04: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 125 Offices - F.B.I M5.1-04: 2'x4' Small fissure & pinhole

None No Yes 0 NA NA NA

1 125 Offices - F.B.I M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 125 Offices - F.B.I F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

219 SF 1 7

1 125 Offices - F.B.I T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 126 FBI Vault (Access Denied)

Walls, Ceiling - Concrete None No No 0 NA NA NA

1 126

FBI Vault (Access Denied;

ACM NOT

Confirmed)

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes

Yes (Backing) 86 SF 1 7

1 126 FBI Vault (Access Denied)

M12.-04 & 34: Various colored, 4" cove base &

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 127 F.B.I.

Tele/Comm

M12.2-34: 4" Tan vinyl cove base with brown mastic None No No 0 NA NA NA

1 127 F.B.I.

Tele/Comm

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

80 SF 1 7

1 127 F.B.I.

Tele/Comm M7.2-34: Walls - Plaster None No No 0 NA NA NA

1 127 F.B.I.

Tele/Comm

M3.2-34: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 127 F.B.I.

Tele/Comm

T2.1: Fiberglass pipe joint insulation with plastic sleeve None No Yes 0 NA NA NA

1 127 F.B.I.

Tele/Comm

T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 128

Vault - F.B.I.

Comm

(Access Denied)

M6.1-34: 1'x1' Fissure & pinhole None No Yes 0 NA NA NA

1 128

Vault - F.B.I.

Comm

(Access Denied)

M16.2-34: Walls - Pegboard (wood based) None No No 0 NA NA NA

1 128

Vault - F.B.I.

Comm

(ACM NOT

Confirmed)

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes

Yes (Backing) 280 SF 1 7

1 128

Vault - F.B.I.

Comm

(Access Denied)

M12.-04 & 34: Various colored, 4" cove base &

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 129 Office - F.B.I.

T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 129 Office - F.B.I.

F1.1-34: Cream vinyl sheet flooring (ND), backing (ACM) None Yes Yes

(Backing)

136 SF 1 7

1 129 Office - F.B.I. M7.2-34: Walls, Ceiling - Plaster None No No 0 NA NA NA

1 129 Office - F.B.I. Cove base - Wood None No No 0 NA NA NA

1 129 Office - F.B.I.

T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 129 Office - F.B.I.

Floor - Carpet on

Concrete None No No 0 NA NA NA

1 129A Office - F.B.I.

Women's Room

T2.1: Fiberglass pipe joint insulation with plastic sleeve None No Yes 0 NA NA NA

1 129A Office - F.B.I.

Women's Room

Floor - Terrazzo None No No 0 NA NA NA

1 129A Office - F.B.I.

Women's Room

M7.2-34: Walls, Ceiling - Plaster None No No 0 NA NA NA

1 129A Office - F.B.I.

Women's Room

T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 130 Stairs - F.B.I M7.2-34: Walls - Plaster None No No 0 NA NA NA

1 130 Stairs - F.B.I M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect

None No No 0 NA NA NA

1 130 Stairs - F.B.I M5.4-34: 2'x2' Rough pinhole

None No Yes 0 NA NA NA

1 130 Stairs - F.B.I Floor - Carpet on Concrete

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 130 Stairs - F.B.I S1.1-34: Walls - Pebble wall texture None No Yes 0 NA NA NA

1 130 Stairs - F.B.I M3.2-34: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 141 Stairs M7.2-34: Walls, Ceiling - Plaster None No No 0 NA NA NA

1 141 Stairs Floor - Concrete None No No 0 NA NA NA 1 141 Stairs Cove base - Wood None No No 0 NA NA NA

1 146 FBI General Office Area.

Floor - Carpet on Concrete None No No 0 NA NA NA

1 146 FBI General Office Area.

T3.7: Heating straight run pipe insulation -abandoned Mag lines None Yes Yes 16 LF 2 6

1 146 FBI General Office Area.

M12.-04 & 34: Various colored, 4" cove base & mastics, nonsuspect None No No 0 NA NA NA

1 146 FBI General Office Area.

T2.4: Domestic pipe fitting insulation on Duplex feeder lines

None Yes Yes 2 EA 2 6

1 146 FBI General Office Area.

T3.5A: Domestic straight run feeder pipe insulation

- Duplex None Yes Yes 8 LF 2 6

1 146 FBI General Office Area.

T2.7: Heating pipe fitting insulation on abandoned

Mag lines None Yes Yes 2 EA 2 6

1 146 FBI General Office Area.

M5.1-34: 2'x4' Small fissure & pinhole None No Yes 0 NA NA NA

1 146 FBI General Office Area.

M7.2-34: Walls - Plaster None No No 0 NA NA NA

1 147 Restroom - FBI

Men

T2.1: Fiberglass pipe joint insulation with plastic

Room No.

Room Description

Homogeneous Material Number and

Description

Bulk Sample

No.

ACBM Friable

ACBM

Quantity Unit

Hazard Rank1

Removal Priority2

1 147 Restroom - FBI

Men T3.1: Fiberglass straight run pipe insulation None No Yes 0 NA NA NA

1 147 Restroom - FBI

Men Floor, Walls, Cove base -

Ceramic Tile None No No 0 NA NA NA

1 147 Restroom - FBI

Men

M3.2-34: Walls - Wallboard, Tape & Joint

Compound None No No 0 NA NA NA

1 149 Janitor - F.B.I T3.1: Fiberglass straight run pipe insulation

None No Yes 0 NA NA NA

1 149 Janitor - F.B.I M3.2-34: Walls -

Wallboard, Tape & Joint Compound

None No No 0 NA NA NA

1 149 Janitor - F.B.I Floor - Carpet on

Concrete None No No 0 NA NA NA

1 149 Janitor - F.B.I Walls - Ceramic tile None No No 0 NA NA NA

1 149 Janitor - F.B.I T2.1: Fiberglass pipe joint insulation with plastic sleeve

None No Yes 0 NA NA NA

1 149 Janitor - F.B.I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.