AEI Submission Clarification Sheet.pdf
PDF 79 KB Posted
- Attached to
- National Architecture/Engineering/Interiors Indefinite Delivery Indefinite Quantity (IDIQ) Contract Federal contract opportunity
- Solicitation number
- 47PF0020R0101
About this file
This document provides details for the National Architecture/Engineering/Interiors Indefinite Delivery Indefinite Quantity contract solicitation issued by the U.S. General Services Administration Public Buildings Service Region 5. The solicitation seeks to award multiple IDIQ contracts for architecture, engineering, and interior design services including planning, programming, design, cost estimating, construction documentation, and construction administration. Services may include workplace strategy, change management, sustainability assessments, and portfolio planning for projects nationwide. The period of performance is five years with a minimum $5,000 guarantee for the initial year and a maximum order limitation of $125 million for Pool A and $25 million for the small business set-aside Pool B. The response deadline is October 4, 2021 and award is anticipated after technical evaluations and interviews. Pricing will be negotiated with top-ranked firms selected for award. Pool B is partially set aside for small businesses with an office located within 250 miles of GSA regions 1 and 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5 - SF30.pdf | ||
| Amendment 4 - SF30.pdf | ||
| AEI Submission Clarification Sheet (10.4.21).pdf | ||
| RFQ 47PF0020R0101 Modified 10.4.2021.pdf | ||
| Amendment 3 - SF30.pdf | ||
| Amendment 2 - SF30.pdf | ||
| Application of 6 percent PIB 13 04 Attach 1.pdf | ||
| RFQ 47PF0020R0101 Modified 9.16.2021.pdf | ||
| Appendix A.pdf | ||
| PIB 13-04 Attachment 2 AE PROPOSAL FORM PROTECTED 23APR2014.xlsx | XLSX spreadsheet | |
| Questions Answers (Round1).pdf | ||
| Amendment 1 - SF30.pdf | ||
| Appendix A.pdf | ||
| SF330-16j.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIRED INFORMATION SF330 SF330 and RFQ Overlap RFQ
All information on the SF330 is required and must be completed and submitted to
GSA.
SF330 and RFQ Overlap:
The below information, from the SF330, satisfies some of the RFQ Evaluation requirements (Factors A,B, C, D and E)
The below information is NOT included in the SF330 but must still be submitted to GSA, included under the tab for the appropriate Evaluation Factor
SF330 Information
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. Contract Information Required to be filled out and submitted to GSA N/A
B. Architect - Engineer POC Required to be filled out and submitted to GSA N/A
C. Proposed Team - six names Required to be filled out and submitted to GSA Factor B: Professional Qualifications, is fulfilled by Section C of the SF330.
Submit this information on SF330 only.
D. Orgainizational Chart of Proposed Team Attach per form instructions N/A
E. Resumes of Key Personnel Proposed for this Contract and Relevant Projects Required to be filled out and submitted to GSA
Factor B: Professional Qualifications, is fulfilled by Section C of the SF330.
Submit this information on SF330 only.
F. Example Projects Which Best Illustrate Proposed Team's Qualifications For This Contract Required to be filled out and submitted to GSA
Factor A: Specialized Experience and Technical Competence, is fulfilled by Section F of the SF330. Submit this information on SF330 only.
Project Limits: No more than five projects should be submitted.
Page Limits: No more than two 8.5" x 11" pages containing narrative and/or graphic material per project.
G. Key Personnel Participation in Example Projects Required to be filled out and submitted to GSA
H. Additional Information: Required to be filled out and submitted to GSA
H1 - Management Plan - template for future task orders
Required to be filled out and submitted to GSA. The Management Plan requiered on the SF330 is specific to this solicitation, not past projects, and will also be used for future task orders that will result from this contract award.
H2 - Quality Control Plan - template for future task orders
Required to be filled out and submitted to GSA. The Quality Control plan in the SF330 is specific to this solicitation, not past projects, and will also be used for future task orders that will result from contract award.
REQUIRED INFORMATION SF330 SF330 and RFQ Overlap RFQ
All information on the SF330 is required and must be completed and submitted to
GSA.
SF330 and RFQ Overlap:
The below information, from the SF330, satisfies some of the RFQ Evaluation requirements (Factors A,B, C, D and E)
The below information is NOT included in the SF330 but must still be submitted to GSA, included under the tab for the appropriate Evaluation Factor
H3 - Past Performance Required to be filled out and submitted to GSA Factor C: Past Performance - self provided performance recognition, is fulfilled by Section H3 of the SF330. This does not pertain to the PPQ requirement.
Attachment 2, Past Performance Questionaire fulfills this requirement.
Additional self provided recognition may be submited in Section H3 of the SF330.
H4 - Lead Designer's Philosophy Required to be filled out and submitted to GSA The SF 330, section H4, fulfls this requirment for Factor B - Professional Qualifications - Lead Designer's philosophy
PART II - GENERAL QUALIFICATIONS
SF330 Part II is required for each proposed subconsultant/subcontractor listed in Section C of
SF330
STAGE 1- EVALUATION CRITERIA (RFQ)
Factor D - Management and Quality Control Plans (past projects)
Factor D: Management and Quality Control Plans - provide no more than 3 Management Plans and 3 Quality Control Plans per past projects . Each submitted plan has a 3 page maximum, therefore if 3 projects are submitted then the maximum page limit is 18 pages (3 projects each with 6 total pages - 3 for Management Plan + 3 for Quality Control Plan).
Factor E - Location
Pool A: provide documentation of at least one office located on the mainland US.
Pool B: provide documentation of at least one office within 250 driving miles of GSA regional headquarter offices in the Boston or Seattle areas.
File details come from the government source that posted it. Updated .