Tomochichi CMc Questions and Answers (120-182) - 10.21.20 Final.pdf

PDF 124 KB Posted

Attached to
Construction Manager as Constructor (CMc) for the Alteration of the Tomochichi Federal Building and U. S. Courthouse
Solicitation number
47PF0020R0071
Issued by

About this file

This notice solicits proposals for construction manager as constructor (CMc) services for the alteration of the Tomochichi Federal Building and U.S. Courthouse in Savannah, Georgia. The General Services Administration (GSA) seeks to award a firm-fixed price contract for construction phase services including management, supervision, labor, equipment, and supplies. The estimated total construction cost is between $50-60 million, with construction anticipated to begin in January 2021 and last approximately 2.5 years. Key work includes upgrades to building systems, security improvements, and consolidation of court facilities while preserving the historic structure. Proposals are due by September 28, 2020. The contract will be full and open competition set aside for small businesses. The CMc will be a member of the project team along with GSA, the selected architect and engineer, and construction manager as agent/commissioning agent.

View the file

Other files

File Type Posted
47PF0020R0071 Amendment 004.pdf PDF
47PF0020R0071 Amendment_003.pdf PDF
Tomochichi CMc Pricing Sheet (Attachment to SF1442) - Final R2.pdf PDF
TOMO Div 1 spec guides r3.pdf PDF
Tomochichi CMc Preproposal Meeting Minutes 10.06.2020 - Final.pdf PDF
Tomochichi CMc Questions and Answers 10.15.2020.pdf PDF
SF1442-14b R1.pdf PDF
47PF0020R0071 Amendment 001.pdf PDF
47PF0020R0071 Amendment 002.pdf PDF
Tomochichi CMc Pricing Sheet (Attachment to SF1442) - Final R1.pdf PDF
GSA TOMO SCHEDULE 20_1005 CMc Collapsed.pdf PDF
Tomochichi CMc Questions and Answers 10.07.2020.pdf PDF
Site Visit Request Form -Tomochichi CMc -Final.pdf PDF
Tomochichi CMc - Preproposal Contractor Attendance 10.06.2020.pdf PDF
Tomochichi CMc Pre-proposal Agenda - Final 10.06.20.pdf PDF
Tomochichi CMc Pricing Sheet (Attachment to SF1442) - Final.pdf PDF
SF24-16d.pdf PDF
Model_Subcontracting_Plan_Updated Apr 2020.pdf PDF
Tomo CMc Pre-Proposal RSVP Form - Final.pdf PDF
Tomo CMc PPQ.pdf PDF
CIO_IT_Security_09-48.pdf PDF
CIO 12-2018_ IT Policy Requirements Guide_0.pdf PDF
CMc Reps and Certs 09.22.20 Tomo.pdf PDF
SF1442-14b.pdf PDF
PBS_3490.3_CIU.pdf PDF
Davis Bacon GA20190117.pdf PDF
018111a KSP Construction Product Tracking Form.pdf PDF
GSA527-15e.pdf PDF
CMc Solicitation 09.22.20 Tomo.pdf PDF
CMcSOW Final.docx.pdf PDF
CMc Agreement 09.22.20 Tomo.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Posted 10.21.2020

120. Please either confirm that each of the below assumptions regarding interior and window scope requirements for the tower are correct or advise if the design intent is otherwise.

a. Existing plaster up through the 7 th floor is to be patched as required.

b. Interior side of load-bearing masonry back-up walls from the 8 th floor up to be painted.

c. Existing wood windows at 5 th & 6 th floors to be refurbished similar to typical building windows.

d. Existing aluminum windows at 7 th floor to remain.

e. New standard storefront systems to be installed around entire façade at 8 th and 9 th floors.

f. Existing platforms up through the 7 th floor are to remain and be cleaned.

g. New painted wood base at all platforms.

h. Existing stairs and rails up through the 7 th floor are to remain and be re-painted.

i. Spiral staircase from the 7 th floor up and hatch at the top are to be removed, reinstalled, and re- painted after top portion of tower is reconstructed.

j. Existing roof ladder to be removed, reinstalled, and re-painted after top portion of tower is reconstructed.

k. New light fixtures throughout tower.

A. The assumption is that the tower will be remediated and in a finished and usable condition.

121. Please advise design intent for the light court balconies (north façade of the south wing) just above the low roof level. These balcony areas are currently covered by an old sheet metal flashing system that appears to be delaminating from the substrate in places. Will these areas require new metal flashing, waterproofing, roof pavers, tile, etc?

A. The intent is that the light court balconies will be renovated in a finished and watertight condition.

122. Does GSA have any special requirements (i.e. chain of custody) for offsite handling and disposal of ACM (i.e. putty for window glazing)?

A. Nothing outside the standard GSA asbestos requirements.

General/Misc

123. How will BIM coordination be structured? By individual rooms, areas or by entire floors?

A. BIM coordination is responsibility of the successful offeror.

124. What is the expected time commitment of weekly BIM coordination meetings. How many weeks and/or total hours are intended for BIM coordination?

A. BIM coordination is the responsibility of the successful offeror.

125. What are the current overtime and/or weekend work limitations for the project site?

A. There is a noise ordinance for the area around the project site of 8pm. The building will be vacant and under control of the successful offeror

Site/Civil

126. Page 8 of the Final Concept Design Narrative states "It is likely that the water line entering the building will need to be upgraded to support fire protection requirements". What is the size of the existing water line entering the building, and what is the expected size increase? If this information cannot be provided, can an allowance be issued for the incorporation of this scope?

A. The size will be determined as the design progresses. It will be carried inside the GMP.

The existing building is not fully sprinklered. Plan on providing a new Fire Protection line per the scope.

127. Page 7 of the Final Concept Design Narrative states "minor utility adjustment and/or capping may be required and will be determined through coordination with the respective utility companies". Is the GSA aware of any specific utilities that would need to be capped and/or re-routed?

A. Not at this point in design. The costs are inside the GMP.

128. Will General Contractor and their respective subcontractors have access to the loading dock and the dock lift for transportation of materials?

A. The building will be vacant and in control of the successful offeror.

129. Will General Contractor and their respective subcontractors have staging areas within the building, or is it expected for GC and subs to provide a temporary field office? If so, would this field office need to be located off-site?

A. The building will be vacant and in control of the successful offeror.

130. The Final Concept Design Narrative includes a Parking Study in Appendix J. Is the intent of the GSA to incorporate any recommendations of this study in this project's scope? If so, can the GSA clarify the intended scope for an parking spot alterations/additions? I.e. Underground parking additions.

A. Any work indicated in a parking study will be incorporated to a modification to the contract.

131. The Final Concept Design Narrative states that 2 flag poles (approximately 40' tall) are to be removed, and that 2 NEW flag poles are to be installed. Are the 2 existing flag poles to be salvaged, or demolished?

A. Plan for 2 new flag poles

132. Please confirm that the $40,000 signage allowance is intended to cover all costs associated with the monument sign described in the Final Concept Design Narrative (told to assume 40 SF).

A. The $40,000 signage allowance is intended to cover all cost for signage responsible for GSA IAW the PBS P-100

133. Page 9 of the Final Concept Design Narrative, under "Landscape", states that "No turf is proposed.", but also states "landscape beds and turf will be on an automated irrigation system".

Should the furnishing and installation of new grass/turf be included in our proposal?

A. The design of the limited landscape areas. Development of the landscape design is ongoing but will meet the P100 requirements of native pollinators. The contractor is responsible for all landscaped area under their control and irrigation thereof.

134. Please confirm the number of new curb ramps. The Final Concept Design Narrative states under the East Side Site Improvements that "two new curb ramps will be constructed. Under the West Side Site Improvements, it states that "four curb ramps are proposed at the building corners and two on the west side". Are there 4 curb ramps (1 at each corner) or 6 curb ramps (1 at each corner, plus 2 additional on the west side)?

A. 6 curb ramps

135. Please confirm if the two crosswalks mentioned in the Final Concept Design Narrative are part of the Court Annex project, or are to be included in this project. Page 10 of the narrative states "Two crosswalks are proposed across Whitaker Steer to the Court Annex which is currently under construction. These crosswalks will be advanced design crosswalks a minimum of 10' wide and incorporate 2 different patterned bands at each edge with an unmarked middle.

Stamped asphalt is proposed with a color/pattern to define the striping. Any improvements within the right of way will have to be coordinated and approved by the City of Savannah".

A. Crosswalks are included as part of the Tomochichi Renovation project.

Structural

136. D101 shows historic stairs to remain at Col Q8 and Q.5,2. Structural demo plan SD 101 shows removal of these stairs. Please confirm if these stairs are to be removed or left in place.

A. Existing stairs are to remain in place and be refurbished. Structural Demo plans are incorrect.

137. M102 and M109 shows cooling tower to be relocated. Are we to assume there are structural modifications or additions that will need to be relocated and/or added as a result?

Please confirm existing roof structure will be able to carry this CT relocation?

A. Contractor shall anticipate the modifications to the structure will be required. Cost for this effort should be included within the GMP.

Finishes

138. Can you specify an allowance to carry for floor leveling?

A. The cost for floor leveling is inside the GMP

Elevators

139. The prisoner elevator does not specify if it’s to be a MRL traction type. Please confirm if this is acceptable. There is also an elevator machine space and control space. Please confirm that this elevator is to be true MRL or if the controller is to be in a separate closet.

A. MRL

140. Shall we include elevator maintenance pricing? Will a long-term contract be tied to the new equipment?

A. Elevator maintenance outside Contractor warranty is outside the GMP.

Plumbing

141. Since most of this building is light hazard, would you consider utilizing CPVC piping in those areas? CPVC allows for easier install, decreases install duration, reduces material costs, improves coordination, creates more space (smaller pipe sizes as compared to steel), and has greater longevity. Note - Exposed areas and attic would remain steel pipe.

A. Not allowable per GSA PBS P-100

Sprinkler

142. Due to early development of the Contract Documents, it is difficult to determine the extent of the FP additions and modifications that will be required. Please provide direction as to how you would like this scope of work priced - I.e. allowance or as a unit cost as a percentage of building area?

A. The cost of FP is inside the GMP

143. Will there be adequate space above ceiling to rough-in sprinkler pipe?

A. We believe there should be enough room to route piping on all floors. Basement floor will be challenging due to lower clearances and will require close coordination and possibly some bulkheads. Basement level will have a multiple 6” diameter pipes routing on the basement level to various regions of the building and will have difficulty avoiding ductwork. This along with other trades will require lower ceilings and/or bulkheads as noted previously.The cost for routing FP is inside the GMP

144. Section 11.0.B.1.c. indicates that all electrical materials and equipment to be removed will not be reused in the new work. Section 11.0.B.4.a. calls for luminaires to be removed as part of the demolition scope. Are these sections of the Narrative meant to cover instances where exterior lighting may need to be removed to supplement renovation work on the exterior of the building, or can existing exterior lighting be stored and reused when removal is necessary to support exterior building work?

A. The actual wording of the first referenced section indicates the materials are removed “except as indicated herein.” Please review the narratives to identify those elements which are identified to be reused. All luminaries (interior and exterior) associated with historic preservation requirements will be refurbished/renovated and reinstalled. All other luminaries will be new.

145. Section 11.0.B.1.a. reads: "Equipment, apparatus, and exposed wiring and raceways rendered useless due to changes will be removed." Please confirm that existing panelboards that remain functional can be reused to serve new circuits that are required as part of the renovation scope.

A. Existing panelboards will not be reused.

146. Section 11.0.B.1.b. calls for all power and signal apparatus mounted to the ceiling or ceiling supports, including raceways and wiring, to be removed where existing ceilings are removed. Please confirm that existing conduit and raceways, including existing light fixture whips, can be reused to serve new loads when not mounted to the ceiling or ceiling supports.

A. See answer to question 144

147. Please identify on the Drawings the location of the existing underground Georgia Power transformer vault located outside the building, as referenced in Section 11.0.C.1.a. of the Narrative.

A. It is under the West sidewalk at the NW corner of the building.

148. Section 11.0.B.3. indicates the scope of electrical demolition for wiring and raceways.

Please confirm electrical conduit, wire, and devices can remain in walls not required to be demolished.

A. Conduit may remain. All other electrical items will be demolished.

149. Section 14.0 references Appendix A: AV Endpoint Summary documents for design and configuration directions from the Court, but this document was not included in the RFP and has not been identified as an accessible standard. Please provide this document.

A. The number of devices are shown in the program of requirements room data sheets.

Locations not yet developed.

150. Section 15.0 requires modification of existing primary pathways into and inside the buildings, however, no existing site plans are included in the issued set of drawings. Please provide site plans that identify the new and existing paths of the primary pathways as well as the location on Whitaker Street that the existing pathways tie into.

A. See the answer to question 147

151. Section 15.0 only provides direction on design of infrastructure for wireless networks.

Please confirm that the contractor will not be providing equipment and cabling for the wireless network system to support the ability to utilize wireless computer networking.

A. The USMS and US Courts equipment and cabling are outside the GMP.

152. Please identify the intended location of the Entrance Facility on the Drawings. Section 15.0 of the Narrative details a proposed location but it is not currently identified.

A. Telcom Entrance Facility will be in the basement but final location is to be determined.

Contractor shall include the associated cost of new Telecom Entrance Facility within the

GMP.

153. Please identify the location of the existing Telecom Room on the Basement level, as referenced in Section 15.0 of the narrative.

A. The question is moot as the telecom room location will be changing. Contractor shall include the associated cost of new Telecom Entrance Facility within the GMP.

154. Section 6.5.3.2 of the P-100 requires a provision must be made to provide CATV or satellite service. Does the Courthouse have an existing CATV or satellite service, and will the contractor be required to modify the existing service? If there is no existing service, please confirm that the contractor will need to provide one.

A. The contractor will need to provide.

155. The US Courts Design Guide identifies locations where CATV outlets are required, such as Judges' Chambers and Juror Lounge, but the cable type is not identified. Please confirm CATV cabling type for this courthouse.

A. See response to Question 151. Cabling is outside of the GMP.

156. The Communication Systems section of Chapter 16 Building Systems in the USCDG references a satellite downlink system that must be provided for all courthouses. Is there an existing satellite downlink system in this building, and will it require modification? If there is no current system, will the contractor need to provide one?

A. The Contractor will need to provide.

157. There are numerous instances where the design requirements for electrical, low voltage, and security systems listed in the Narrative are less stringent than what is defined in either P-100, USCDG, or USMS Publication 64. For example, the Section 11.C.7.c of the Narrative requires one duplex receptacle per wall with additional receptacles to support AV requirements in Conference and Training Rooms, whereas Section C11 Conference Room of USMS Publication 64 Vol. I requires duplex receptacles located at 6 foot intervals around the room with supplemental outlets for TV monitors and overhead projectors. In instances where the requirements listed in the Narrative conflict with the requirements listed in the applicable set of standards, please provide direction on which approach should be followed.

A. P100, USCDG, and USMS Pub 64 in association with the POR room data sheets determine the requirements. Final location of the devices is not shown. The more stringent requirement should be carried within the GMP.

158. Please confirm the GSA will pay for all construction utility usage directly to utility company and these costs should not be included in the ECW.

A. GSA will pay for all permanent power, water and sewer costs. Any temporary utility cost is borne by the contractor.

159. Sheet E105 on the drawings suggest that a one-line was put together to supplement the included electrical room layouts. Please provide this one-line diagram, if available.

A. One line diagram is in progress and will not be available until at next submission.

160. The Narrative requires a waiver to bypass the isolated ground electrical system requirement for telecommunications equipment from GSA PBS-P100. Please confirm pricing should be submitted as if this waiver is already accepted or will be accepted and that an isolated ground electrical system will not be required.

A. Isolated Ground requirements are not required.

161. In response to Question 15, it was established that for both tele/data and audio/visual systems, cabling and equipment is not to be included in the GMP for the "US Courts". Please confirm this language is intended to cover the scope for the US Courts Agency only, as defined on the area plans and blocking diagrams in the drawings, and not all agencies that may be governed by design criterion listed in the US Courts Design Guide, such as the Judge's Chambers, the US District Court Clerk, and the Grand Jury Suite.

A. US Courts Agency including all sub categories as indicated in the US Courts Design Guide.

162. The Narrative calls out public safety communication systems to be powered on the life safety branch, but no other mention of this system appears in the narrative. Please confirm this system will be required for this renovation, and please define the scope of what the contractor will need to provide.

A. It is unclear as to what exact system this comment is referencing. We will have automatic alarm voice messaging for fire and other mass notification related events. We will have Emergency Responder Radio Coverage systems and elevator landing two-way communication systems. All powered by life safety branch circuits with the equipment itself having its own battery backup as well. If the comment is referencing any form of telecom related Public Address (P.A.) system, fire alarm/mass notification will have not tie in to that system other than to override it during automatic alarms or live voice messaging from the Fire Alarm Control Panel or Remote Local Operating Consoles.

163.The Schedule of Allowances indicates that for Allowance No.4, an allowance of $80,000 should be carried for the cost of providing audio/visual infrastructure as related to the Courts.

Please confirm if this is in reference to the US Courts Agency as defined on the blocking diagrams and area plans in the drawings, or just the Courtrooms.

A. This is for all A/V infrastructure US Courts Agency including all sub categories as indicated in the US Courts Design Guide.

164.Location of window basement wells for sump pumps (11 total pumps) Where is the tie in point for these sumps? In an outside building loop?

A. The outfall of these drains is unknown at this time. The plan is to have the successful CMc assist in this determination through series of tests during the completion of the construction documents.

165."Contractor shall install new yard inlets and piping to capture runoff from pedestrian pavement and landscape area." Can you provide locations?

A. Design is evolving. The final design will involve a similar amount of impervious area. The runoff of this area must be captured.

166. Does an eyewash station and hood need to be provided for the mail room?

A. Yes.

167. Is a grease interceptor required? Please provide garage drain locations? Please provide number of sump pump required?

A. No grease interceptor is required. No commercial kitchen facilities. Current design has no basement parking where a sand/oil interceptor may be required. Sump pumps, if any, will be developed in next submission.

168. Will new water and gas meters be required? This might be necessary for the new building controls system to be able to read them.

A. Yes, new water and gas meters will be required and interfaced through new building automation system for the facility. Contractor to anticipate new water and gas meters within the GMP.

169. Is there a required cooling tonnage for the building or subsections on the building?

A. See response to Question 71.

170. Is a second cooling tower required for each of the (2) chillers per P-100? Narrative states the existing cooling tower has a single cell.

A. To meet P-100 completely a second tower would be required for 67% and 25% new chillers to supplement 100% existing chiller to be used in design. Intent is to use the single cooling tower for all operations as noted previously and will be part of the variance requested for chillers.

171. What Permanence Requirement Level is assigned to spaces within the building?

A. MEP systems are being designed per POR document section 5.2.5.

171. What are the (qty 2) Boiler MBH sizes and the (qty 2) Chiller Tons

173. Narrative Section 9.0-D.1. states that the hot water system will consist of (3) boilers, however, Sheet M100 of the Drawings shows (2) boilers. Please confirm the boiler quantity.

174. Narrative and Drawings state to reuse and relocated existing cooling tower. Can the existing cooling tower accommodate the new cooling loads from the renovation? If not, what should the cooling tower be upsized to?

A. Existing cooling tower has capacity to accommodate new cooling loads, but will need to be relocated to accommodate future connector between wings. Contractor shall include related cost within GMP.

175. What are the heating and cooling loads of the renovated building so chillers and boilers can be selected?

176. Narrative Section 9.0-F.7.a)6) indicates that stairwell and elevator hoistway pressurization systems are to be included, is this correct?

A. No, the building is not classified as a high rise.

177. Narrative Section 10.0-C. includes battery operated sensors for the lavatories, however, the sensor type for the water closets and urinals is not specified. Should the sensors for the water closets and urinals be battery operated as well?

A. Where water closets and urinals are called for in the narrative with sensor flush valves these will be battery operated.

B. 178. Narrative Section 10.0-D.1.a) specifies trap primers for drains susceptible to loss of water seal by evaporation. Please identify which drains need trap primers - i.e.

restrooms, mechanical rooms, etc.

A. As a starting point it may be assumed all restrooms and mechanical rooms with floor drains will require trap primers. Contractor shall include related cost within GMP.

179. AHU-13 is not shown on drawings. Where is this to be located?

A. In the basement. See answer to question 71.

180. Are the Mail Room air requirements to be satisfied by AHU-13 as listed in Narrative or by AHU-4 as shown on drawings?

A. AHU-13, the single line through the mail room to AHU-4 is from the shaft beyond the mail room.

181. Narrative states " The Historical Courtroom on the third floor of the north wing will be retained with only minor modification at windows. Sheet SD103 also indicates that this area does not require any demolition work. However, sheet SD103 indicates that the structural floors, columns and beams are to be demolished. If the structure in this area is to be demolished and rebuilt, how is this Historic courtroom to be retained?

A. The design team revised the approach to the third floor courtroom to maintain the existing concrete pan joist structure and support it by inserting 4 transfer girders. There is one girder on each side of the existing north south beams. Assume the beams will be W24x229 supported on W12x65 columns at each end. These will be set between the beams and carry to the foundations that will be increased in capacity by the addition of micro piles. The east girder will require two columns on the south end to straddle the window in the courtyard. (There will be 5 columns rather than 4 and a short bracket beam between the pair.)

182. Since this is a Concept Design with a Narrative and some Concept drawings, we understand there will be variances between the two documents. Please provide direction on which document we should follow should we discover large discrepancies. Since today is the last day for submitting questions, we will undoubtedly encounter more as we work through this project.

A. The descriptions in the narrative should take precedence.