Addendum 003.pdf
PDF 475 KB Posted
- Solicitation number
- 47PE0321R0003
About this file
This solicitation seeks general contractor services for construction of approximately 88,000 square feet of new office building space for the United States Citizenship and Immigration Service located in the Peachtree Summit Federal Building in Atlanta, Georgia. The General Services Administration intends to award a firm fixed price construction contract utilizing a trade-off source selection procedure in accordance with the Federal Acquisition Regulation. Evaluation factors for the single-step solicitation include technical approach and price, with the goal of achieving at least LEED Gold and SITES Silver certification standards. The construction services will include tenant improvements and specialty construction work.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1819 Peachtree Rd. NE, Suite 102 Atlanta, GA 30309 t: 404.633.4264 f: 404.870.7337 houserwalker.com info@houserwalker.com
February 25, 2021
Christopher Blackburn Project Manager, GSA
Project USCIS at Peachtree Summit Re: Addendum 003
Chris, Please find attached the corrected door schedules to include the phase 2 work on 24. The additional information required moving the door hardware schedule to a new sheet A023, also included.
This issue includes the following:
Sheets:
A022 – Door Schedule-Rev3 A023 – Door Hardware Schedule – Rev3
Sincerely, Tom Butler Houser Walker Architecture
File: DOCUMENT2
A. Additional Door Hardware is listed on Sheet A020-S
B. Hardware shown on door types are for location purposes. See specifications for required hardware.
C. See door schedule for door panel material and finish.
D. HM door frames to recieve PT-6 unless noted otherwise.
E. Door type indicated with 'R' is to be fire rated, per the door schedule.
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
MATERIAL KEYNOTES
GENERAL NOTES
SHEET SPECIFIC NOTES
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/25/2021 12:17:12 PM
A022
12/10/2020
VIRTUAL WALK-THROUGH
DOOR SCH - PHASE 2, HARDWARE SCH
NP
Approver
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
Door Schedule - Phase 2 wt ROOM NAME
DOOR FRAME
FIRE RATING HARDWARE SET COMMENTSWIDTH HEIGHT MATERIAL MATERIAL
Floor 10 1000A LOBBY SOUTH 4' - 8" 8' - 0" FLUSH WOOD DOOR EXISTING 20 min 23.0 NEW DOOR IN EXISTING FRAME WITH NEW HOLD-OPEN HARDWARE, STAIN DOOR 1000B LOBBY SOUTH 4' - 8" 8' - 0" FLUSH WOOD DOOR EXISTING 20 min 23.0 NEW DOOR IN EXISTING FRAME WITH NEW HOLD-OPEN HARDWARE, STAIN DOOR 1000C SOUTH STAIR 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 90 min 24.0 EGRESS DOOR
1000D SOUTH MECHANICAL EQUIPMENT
ROOM
3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 45 min 25.0
1000G ADA 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 26.0 REUSE EXISTING ACCESSIBLE PUSH BUTTON OPENER
1000I MEN 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 27.0
1000J WOMEN 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 27.0
1000M VESTIBULE 4' - 8" 8' - 0" FLUSH WOOD DOOR EXISTING 28.0
1002 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 31.0
1003A OPEN OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR EXISTING 32.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR, MATCH HINGE PATTERN OF NEW SLAB TO EXISTING FRAME 1005 CORRIDOR 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 32.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
1006 PHONE BOOTH 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 33.0
1007 BREAK ROOM 3' - 0" 8' - 0" GLASS G1 34.0
1008 TR-2 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 30.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
1009 HVAC 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 35.0
1010 STORAGE 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 35.0
1011 CONFERENCE 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 30.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 1012 TRAINING 2 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 32.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
1012A STOR. 6' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 36.0
1013 TRAINING 1 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 32.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
1013A STOR. 6' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 36.0
1014 STORAGE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 35.0
1016A HIGH DENSITY FILIING 6' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 45 min 29.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 1016B HIGH DENSITY FILIING 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 45 min 30.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
Floor 24 2400G ADA 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 41.0 REUSE EXISTING ACCESSIBLE PUSH BUTTON OPENER 2400H NORTH STAIR 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 90 min 42.0 EGRESS DOOR
2400I MEN 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 43.0
2400J WOMEN 3' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 43.0
2400K VESTIBULE 4' - 8" 8' - 0" FLUSH WOOD DOOR EXISTING 44.0
2400R LOBBY NORTH 4' - 8" 8' - 0" FLUSH WOOD DOOR EXISTING 20 min 45.0 NEW DOOR IN EXISTING FRAME WITH NEW HOLD-OPEN HARDWARE, STAIN DOOR 2400S LOBBY NORTH 4' - 8" 8' - 0" FLUSH WOOD DOOR EXISTING 20 min 45.0 NEW DOOR IN EXISTING FRAME WITH NEW HOLD-OPEN HARDWARE, STAIN DOOR
2400Z DATA 2' - 0" 8' - 0" FLUSH WOOD DOOR EXISTING 46.0
2401 FDNS FILE ROOM 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 47.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
2402 SMALL CONF. 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 48.0
2403 MDF 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 01.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 2404 CORRIDOR 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 02.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 2405 COMP. ASSY. 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 01.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
2406 BREAK ROOM 3' - 0" 8' - 0" GLASS G1 50.0
2407 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2408 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2409 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2410 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2411 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2412 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2413 CONFERENCE 3' - 0" 8' - 0" GLASS G2 50.0
2414 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2415 OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR W/ 8" SIDELIGHT 2" HMF 51.0
2417 OPEN OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 49.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 2417A VESTIBULE 3' - 0" 8' - 0" EXISTING EXISTING 49.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 2418 OPEN OFFICE 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 49.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR 2418B CORRIDOR 3' - 0" 7' - 0" FLUSH WOOD DOOR 2" HMF 49.0 CEILING MOUNTED REQUEST TO EXIT, DOOR POSITISON INCIDCATOR
Revision Number
Revision Date Revision Description
2 02/25/21 Addendum 003
A. Additional Door Hardware is listed on Sheet A020-S
B. Hardware shown on door types are for location purposes. See specifications for required hardware.
C. See door schedule for door panel material and finish.
D. HM door frames to recieve PT-6 unless noted otherwise.
E. Door type indicated with 'R' is to be fire rated, per the door schedule.
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
MATERIAL KEYNOTES
GENERAL NOTES
SHEET SPECIFIC NOTES
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/25/2021 12:18:09 PM
A023
02/25/21
VIRTUAL WALK-THROUGH
Door Hardware Schedule
Author Approver
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
Revision Number
Revision Date Revision Description
2 02/25/21 Addendum 003
Hardware Schedule
Hardware Set HW Set Description
Standard Protection Manual Operation Electrical Operation Security
Hi ng e
C on tin uo us H in ge
Si le nc er
Se al
C oo rd in at or
C lo se r
Fl oo r / W al l S to p
O ve rh ea d St op
Pr ot ec tio n Pl at e
Pu sh
P ul l
La tc hs et
Lo ck se t
C yl in de r
C ip he r L oc k
Fl us hb ol t
Du tc h Do or B ol t
Ri m
E xi t D ev ic e
Sv r E xi t D ev ic e
Em er ge nc y
PB
El ec tri c
St rik e
EM
L oc ks et
G at e M ag -lo ck
A ut o O pe ra to r
A ct ua to r
Re ce iv er
Po w er T ra ns fe r
Po w er S up pl y
C ar d Re ad er
M ot io n
Se ns or
DR
P os iti on S w itc h (B
M S)
Phase 1A
01.0 MDF, Comp Assy, TR-4, Storage ● ● ● ● ● ● ● ● ● ●
02.0 Cross Corridor ● ● ● ● ● ● ● ● ● ● ●
40.0 Lactation ● ● ● ● ● ●
Phase 1B
03.0 Mail Room ● ● ● ● ● ● ● ● ● ● ● ● ●
03.1 PIB - MAIL ROOM ● ● ● ● ● ● ● ●
04.0 Incoming / Outgoing Common Dr, VTC
Team
05.0 X-Ray ● ● ● ● ● ● ●
06.0 TR-1, Corr. Secure Stor., TR-3, PIV Room, TR-5
07.0 Corridor South Lobby ● ● ● ● ● ● ●
08.0 Interior Stair ● ● ● ● ● ● ● ● ● ● ●
08.1 Interior Stair ● ● ● ● ● ●
09.0 South Mechanical Equipment Room ● ● ● ● ● ●
10.0 ADA Toilet ● ● ● ● ● ●
11.0 Men's / Women's Restroom ● ● ● ● ● ●
12.0 Vestibule ● ● ● ● ● ● ● ● ● ● ●
13.0 Glass Entries / Exits ●
14.0 Toilet ● ● ● ● ●
15.0 Cross Corridor, Open Office ● ● ● ● ● ● ● ● ● ● ●
15.1 Cross Corridor, Open Office ● ● ● ● ● ● ●
16.0 Office ● ● ● ●
17.0 Files ● ● ● ● ● ● ● ● ● ●
18.0 Storage, USPS ● ● ● ●
19.0 Open Office, Vestibule, USPS Lobby ● ● ● ● ● ● ● ● ● ● ●
20.0 Interior Office PIV Room ● ● ● ● ● ● ●
21.0 Storage ● ● ● ● ● ●
22.0 Secure Storage ● ● ● ● ●
23.0 Cross Corridor, Lobby ● ● ● ● ● ● ●
24.0 Interior Stair ● ● ● ● ● ● ● ● ● ● ●
25.0 South Mechanical Equipment Room ● ● ● ● ● ●
26.0 ADA Toilet ● ● ● ● ● ●
27.0 Men's / Women's Restroom ● ● ● ● ●
28.0 Vestibule ● ● ● ● ●
29.0 High Density Filing ● ● ● ● ● ● ● ● ● ● ● ● ● ●
30.0 High Density Filing, Cross Corr., TR-2, Conf., Office, Storage, TR-4
31.0 Office ● ● ● ●
32.0 Open Off., Cross Corridor, Training 1 & 2 ● ● ● ● ● ● ● ● ● ● ●
33.0 Phone Booth ● ● ● ●
34.0 Glass Entries / Exits ●
35.0 Closet, Storage, Data ● ● ● ●
36.0 Training Storage ● ● ● ● ● ●
37.0 Interior Stair ● ● ● ● ● ●
38.0 Vestibule ● ● ● ● ● ● ● ● ● ● ●
39.0 North Lobby ● ● ● ● ● ● ● ● ● ● ● ●
Phase 2
41.0 ADA Toilet ● ● ● ● ● ●
42.0 Interior Stair ● ● ● ● ● ●
43.0 Men's / Women's Restroom ● ● ● ● ●
44.0 Vestibule ● ● ● ● ● ● ● ● ● ● ●
45.0 Cross Corridor, Lobby ● ● ● ● ● ● ●
46.0 Data ● ● ● ●
47.0 FDNS File Rm, MDF, Comp Assy ● ● ● ● ● ● ● ● ● ●
48.0 Small Conference ● ● ● ●
49.0 Cross Corridor, Open Office ● ● ● ● ● ● ● ● ● ● ●
50.0 Glass Entries / Exits ●
51.0 Office ● ● ● ●
| Sincerely, |
| Tom Butler |
| A022-REV3.pdf |
| Sheets |
| A022 - DOOR SCH - PHASE 2, HARDWARE SCH |
| A023-REV3.pdf |
| Sheets |
| A023 - Door Hardware Schedule |
File details come from the government source that posted it. Updated .