This solicitation seeks general contractor services for construction of a new 88,000 square foot office building space located in the Peachtree Summit Federal Building in Atlanta, Georgia. The project includes construction and renovation work as well as tenant improvements. The General Services Administration intends to award a firm fixed price construction contract using a tradeoff source selection process in accordance with FAR Part 15. The solicitation will include technical and price proposals that are evaluated separately. No stipend is offered for this project. Upon completion of the solicitation process, GSA intends to award a single contract to one offeror to perform all construction services.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1819 Peachtree Rd. NE, Suite 102 Atlanta, GA 30309 t: 404.633.4264 f: 404.870.7337 houserwalker.com info@houserwalker.com
February 16, 2021
Christopher Blackburn Project Manager, GSA
Project USCIS at Peachtree Summit Re: Addendum 001
Chris, Please find attached the updated specifications and drawings in response to bidders’ questions. These documents should replace the originally issued sheets and specifications.
This issue includes the following:
Specs – 00 0110 Table of Contents Strikes masonry spec, identifies updated specs 09 6500 Resilient Flooring Add product information for Linoleum Flooring 10 5100 Lockers Changes width of locker and configuration from single to two-tier 12 2113 Horizontal Louver Blinds Adds section to specify replacement blinds Drawings - G001 Cover Sheet Correct mis-number sheets in the sheet list G002 General Note, Sheet List Correct mis-number sheets in the sheet list G004 Phasing Plan Clarifies the scope of Phase 1A on 25th floor A325 Phase 1A Scope 25thFlr. Shows entire corridor around SWS space AI118 18th Flr. Finish Plan Corrects scope area M7.01 Mechanical Controls Updates points for WSHPs P2.00 2nd Flr. Plumbing Plan Sheet was omitted for original issue P2.01 10th Flr. Plumbing Plan Sheet was omitted for original issue P2.02 12th Flr. Plumbing Plan Sheet was omitted for original issue P2.04 24th Flr. Plumbing Plan Sheet was omitted for original issue P2.05 25th Flr. Plumbing Plan Sheet was omitted for original issue P4.01 Part Plumbing Risers Sheet was omitted for original issue
Sincerely, Tom Butler Houser Walker Architecture
File: DOCUMENT1
USCIS N170152 Bid Set -12/10/2020
TABLE OF CONTENTS
00 0110 - 1
SECTION 00 0110
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0110 - Table of Contents B. 01 1000 – Summary C. 01 1400 – Work Restrictions D. 01 2500 – Substitution Procedures E. 01 3000 – Electronic Project Management F. 01 3100 – Project Management and Coordination G. 01 3110 – Prosepctus CPM Schedule H. 01 3200 – Construction Progress Documentation I. 01 3300 – Submittal Procedures J. 01 3331 – Structural Submittals K. 01 4200 – References L. 01 4525 – Structural Testing/Inspection Agency Services M. 01 5950 – Safety and Heath N. 01 6000 – Product Requirements O. 01 7000 – Execution Requirements P. 01 7320 – Selective Demolition Q. 01 7410 – Construction Indoor Air Quality R. 01 7419 – Construction Non-Hazardous Waste S. 01 7700 – Closeout Procedures T. 01 7822 – Operation and Maintenance Documentation
2.03 DIVISION 03 -- CONCRETE
A. 03 1000 - Concrete Formwork B. 03 2000 - Concrete Reinforcement C. 03 3000 - Cast-in-Place Concrete D. 03 6200 - Non-shrink Grout
2.04 DIVISION 04 -- MASONRY
A. 04 4200 - Exterior Stone Cladding
2.05 DIVISION 05 -- METALS
A. 05 1000 - Structural Steel B. 05 3000 - Metal Decking C. 05 5000 - Metal Fabrications D. 05 5213 - Pipe and Tube Railings E. 05 7300 - Decorative Metal Railings
2.06 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry B. 06 2000 - Finish Carpentry C. 06 4100 - Architectural Wood Casework
Addendum 001 02/16/2021
00 0110 - 2
D. 06 4200 - Wood Paneling
2.07 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 2100 - Thermal Insulation B. 07 2129 - Sprayed Insulation
2.08 DIVISION 08 -- OPENINGS
A. 08 1113 - Hollow Metal Doors and Frames B. 08 1416 - Flush Wood Doors C. 08 3100 - Access Doors and Panels D. 08 7100 - Door Hardware E. 08 8000 - Glazing F. 08 8300 - Mirrors
2.09 DIVISION 09 -- FINISHES
A. 09 2116 - Gypsum Board Assemblies B. 09 3000 - Tiling C. 09 5100 - Acoustical Ceilings D. 09 5423 - Linear Metal Ceilings E. 09 6500 - Resilient Flooring F. 09 6813 - Tile Carpeting G. 09 8311 - Acoustical Wall Systems H. 09 8400 - Acoustic Room Components I. 09 9123 - Interior Painting
2.10 DIVISION 10 -- SPECIALTIES
A. 10 2113.13 - Metal Toilet Compartments B. 10 2239 - Folding Panel Partitions C. 10 5100 - Lockers
2.11 DIVISION 12 -- FURNISHINGS
A. 12 2113 – Horizontal Louver Blinds B. 12 2400 - Window Shades
2.12 DIVISION 21 -- FIRE SUPPRESSION
A. 21 1300 - Fire-Suppression Sprinkler Systems
2.13 DIVISION 22 – PLUMBING
A. 22 0517 - Sleeves and sleeve seals for plumbing piping B. 22 0518 - Escutcheons for plumbing piping C. 22 0523 - General-duty valves for plumbing piping D. 22 0529 - Hangers and supports for plumbing piping and equipment E. 22 0553 - Identification for plumbing piping and equipment F. 22 0719 - Plumbing piping insulation G. 22 1116 - Domestic water piping H. 22 1119 - Domestic water piping specialties J. 22 1316 – Sanitary waste and vent piping
2.14 DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
00 0110 - 3
A. 23 0000 - HVAC general requirements B. 23 0513 - Common motor requirements for HVAC equipment C. 23 0514 - Variable frequency drives for HVAC equipment D. 23 0519 - Meters and gauges for HVAC piping E. 23 0523 - Valves for HVAC piping F. 23 0529 - Hangers and supports for HVAC piping and equipment G. 23 0553 - Identification for HVAC piping and equipment H. 23 0593 - Testing, adjusting, and balancing for HVAC I. 23 0716 - HVAC equipment insulation J. 23 0719 - HVAC piping insulation K. 23 0800 - Commissioning of HVAC and plumbing L. 23 2113 - Hydronic piping M. 23 2116 - Hydronic piping specialties N. 23 2123 - Hydronic pumps O. 23 2300 - Refrigerant piping P. 23 3100 - HVAC metal ducts Q. 23 3300 - HVAC duct accessories R. 23 3346 - Flexible ducts S. 23 3713.13 - Air diffusers T. 23 3713.23 - Registers and grilles U. 23 6350 - Variable refrigerant flow system V. 23 7433 - Dedicated outdoor-air units W. 23 8146 - Water-source unitary heat pumps X. 23 8219 - Fan coil units
2.15 DIVISION 26 – ELECTRICAL
A. 26 0519 - Low-voltage electrical power conductors and cables B. 26 0526 - Grounding and bonding for electrical systems C. 26 0529 - Hangers and supports for electrical systems D. 26 0533 - Raceways and boxes for electrical systems E. 26 0544 - Sleeves and sleeve seals for electrical raceways and cabling F. 26 0553 - Identification for electrical systems G. 26 0923 - Lighting control devices H. 26 0943 - Relay-based lighting controls I. 26 2726 - Wiring devices J. 26 2813 - Overcurrent protective devices K. 26 2816 - Circuit and motor disconnects L. 26 5100 - Luminaires
2.16 DIVISION 27 – COMMUNICATIONS – SEE APPENDICES
2.17 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY
A. 28 3100 - Fire Detection and Alarm
00 0110 - 4
2.18 DIVISION 33 – EXTERIOR IMPROVEMENT
A. 32 3113 – Chain Link Fence and Gates
3 Appendices Appendix A – SWS - IT/AV/Security Scopes of Work and Certification Standards
A. IT/AV Structured Cable Plant Scope of Work (SOW)-A LAN, B-LAN, C-LAN B. Security - Lease Acquisition Project Statement of Work C. Technical Specifications for Construction and Management of Sensitive Compartmented
Information Facilities Appendix B. SOWs
A. OIT
a. ZSV Phase IA, II SOW
i. 24th Floor-MDF Phase I
ii. 2nd Floor- TR-1
iii. 12th Floor- TR-3
iv. 18th Floor-TR-4
v. 25th Floor-TR-5 Phase I
b. ZSV Phase III SOW
i. 10th Floor – TR-2
ii. 25th Floor – TR-5 Phase II
i. 24th Floor-MDF Phase III
c. Drawings
i. ZSV Layouts R-11 8/7/19
ii. Rack Elevations 7/16/19
iii. Demarcation and Chase Locations
B. Security
a. USCIS AVCF Security SOW
b. AV - USCIS ZSV AV Coordination Set
C. Reference Standards
1. 2017 USCIS Computer and Telephone Room Standards, July 2017
a. 2017 USCIS Computer and Telephone Room Standards, July 2017-Appendix A
2. USCIS Structured Cable and Plant Standards, March 2016 V 2.2
3. USCIS AV Standards, 1APR219
4. USCIS FSS Requirements, November, 2017
END OF SECTION
USCIS N170152 Addendum 001 Issued:02/16/2021
RESILIENT FLOORING
09 6500 - 1
SECTION 09 6500
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Resilient sheet flooring.
B. Resilient tile flooring.
C. Resilient base.
D. Resilient stair accessories.
E. Installation accessories.
1.02 REFERENCE STANDARDS
A. ASTM F150 - Standard Test Method for Electrical Resistance of Conductive and Static
Dissipative Resilient Flooring; 2006 (Reapproved 2013).
B. ASTM F1344 - Standard Specification for Rubber Floor Tile; 2015.
C. ASTM F1861 - Standard Specification for Resilient Wall Base; 2008 (Reapproved 2012).
D. ASTM F2034 - Standard Specification for Sheet Linoleum Floor Covering; 2008 (Reapproved
2013).
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on specified products, describing physical and performance characteristics; including sizes, patterns and colors available; and installation instructions.
C. Selection Samples: Submit manufacturer's complete set of color samples for Architect's initial selection.
D. Maintenance Data: Include maintenance procedures, recommended maintenance materials, and suggested schedule for cleaning, stripping, and re-waxing.
E. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
1. See Section 01 6000 - Product Requirements, for additional provisions.
1.04 DELIVERY, STORAGE, AND HANDLING
A. Upon receipt, immediately remove any shrink-wrap and check materials for damage and the correct style, color, quantity and run numbers.
B. Store all materials off of the floor in an acclimatized, weather-tight space.
C. Maintain temperature in storage area between 55 degrees F and 90 degrees F.
D. Protect roll materials from damage by storing on end.
E. Do not double stack pallets.
1.05 FIELD CONDITIONS
A. Store materials for not less than 48 hours prior to installation in area of installation at a temperature of 70 degrees F to achieve temperature stability. Thereafter, maintain conditions above 55 degrees F.
PART 2 PRODUCTS
2.01 SHEET FLOORING
A. Linoleum Sheet Flooring - Type LF1: Homogeneous wear layer bonded to backing, with color and pattern through wear layer thickness.
1. Manufacturers:
a. Forbo Flooring, Inc; Marmoleum: www.forboflooringna.com/#sle.
b. Substitutions: See Section 01 6000 - Product Requirements.
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20F150 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20F1344 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20F1861 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20F2034
09 6500 - 2
2. Minimum Requirements: Comply with EN ISO 24011, Type corresponding to type specified.
3. Backing: Jute fabric.
4. Thickness: 0.100 inch, minimum, excluding backing.
5. Sheet Width: 79 inch, minimum.
6. Seams: Heat welded.
7. Color: As indicated on drawings.
B. Welding Rod: Solid bead in material compatible with flooring, produced by flooring manufacturer for heat welding seams, and in color matching field color.
2.02 TILE FLOORING
A. Rubber Tile: Type I- and Grade 1 Homogeneous, color and pattern throughout thickness;
1. Manufacturers:
a. Nora Systems; Noarplan Environcare ed. Basis of design
b. Roppe; ESD Rubber Static Control Tile
c. Flexco, Inc.; ESD Rubber
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 24 by 24 inch.
4. Total Thickness: 0.08 inch.
5. Color: As indicated on drawings.
2.03 RESILIENT BASE
A. Resilient Base: ASTM F1861, Type TS rubber, vulcanized thermoset; top set as indicated on drawings.
1. Height: 4 inch.
2. Thickness: 0.125 inch.
3. Finish: Satin.
4. Length: Roll.
5. Color: As indicated on drawings.
2.04 ACCESSORIES
A. Subfloor Filler: White premix latex; type recommended by adhesive material manufacturer.
B. Primers, Adhesives, and Seam Sealer: Waterproof; types recommended by flooring manufacturer.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that surfaces are flat to tolerances acceptable to flooring manufacturer, free of cracks that might telegraph through flooring, clean, dry, and free of curing compounds, surface hardeners, and other chemicals that might interfere with bonding of flooring to substrate.
B. Cementitious Sub-floor Surfaces: Verify that substrates are dry enough and ready for resilient flooring installation by testing for moisture and pH.
1. Obtain instructions if test results are not within limits recommended by resilient flooring manufacturer and adhesive materials manufacturer.
3.02 PREPARATION
A. Remove sub-floor ridges and bumps. Fill minor low spots, cracks, joints, holes, and other defects with sub-floor filler to achieve smooth, flat, hard surface.
B. Prohibit traffic until filler is fully cured.
3.03 INSTALLATION - GENERAL
A. Starting installation constitutes acceptance of sub-floor conditions.
B. Install in accordance with manufacturer's written instructions.
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20F1344 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20F1861
09 6500 - 3
C. Spread only enough adhesive to permit installation of materials before initial set.
D. Fit joints and butt seams tightly.
E. Set flooring in place, press with heavy roller to attain full adhesion.
F. Where type of floor finish, pattern, or color are different on opposite sides of door, terminate flooring under centerline of door.
G. Install edge strips at unprotected or exposed edges, where flooring terminates, and where indicated.
H. Scribe flooring to walls, columns, cabinets, floor outlets, and other appurtenances to produce tight joints.
3.04 INSTALLATION - SHEET FLOORING
A. Lay flooring with joints and seams parallel to longer room dimensions, to produce minimum number of seams. Lay out seams to avoid widths less than 1/3 of roll width; match patterns at seams.
B. Seal seams by heat welding where indicated.
3.05 INSTALLATION - TILE FLOORING
A. A secure storage area that is fully enclosed, weather tight, and climate controlled between 63°F and 75°F and 40% to 60% ambient relative humidity (RH) for at least 48-hours prior and during the installation, so the flooring contractor can acclimate all materials.
B. Mix tile from container to ensure shade variations are consistent when tile is placed, unless otherwise indicated in manufacturer's installation instructions.
C. Provide INSTALL certified installers D. Follow maunfactuers instructes for protection from UV exposure, foot traffic and additinal construction
3.06 INSTALLATION - RESILIENT BASE
A. Fit joints tightly and make vertical. Maintain minimum dimension of 18 inches between joints.
B. Install base on solid backing. Bond tightly to wall and floor surfaces.
3.07 INSTALLATION - STAIR COVERINGS
A. Adhere over entire surface. Fit accurately and securely.
LOCKERS
10 5100 - 1
SECTION 10 5100
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Metal lockers.
1.02 REFERENCE STANDARDS
A. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc- Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2015.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Product Data: Manufacturer's published data on locker construction, sizes and accessories.
C. Shop Drawings: Indicate locker plan layout, numbering plan and combination lock code.
D. Manufacturer's Installation Instructions: Indicate component installation assembly.
1.04 DELIVERY, STORAGE, AND HANDLING
A. Protect locker finish and adjacent surfaces from damage.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Metal Lockers:
1. Art Metal Products: www.artmetalproducts.com.
2. Penco Products, Inc: www.pencoproducts.com.
3. Republic Storage Systems Co: www.republicstorage.com.
4. Substitutions: See Section 01 6000 - Product Requirements.
2.02 LOCKER APPLICATIONS
A. Staff Lockers: Two tier metal lockers, wall mounted with matching closed base.
1. Width: 15 inches.
2. Depth: 12 inches.
3. Height: 72 inches.
4. Fittings: Hat shelf, 2 coat hooks.
5. Locking: Built-in combination locks.
2.03 METAL LOCKERS
A. Lockers: Factory assembled, made of formed sheet steel, ASTM A653/A653M SS Grade
33/230, with G60/Z180 coating, stretcher leveled; metal edges finished smooth without burrs;
baked enamel finished inside and out.
1. Where ends or sides are exposed, provide flush panel closures.
2. Provide filler strips where indicated, securely attached to lockers.
3. Color: To be selected by Architect; allow for contrasting colors for locker bodies and doors.
B. Locker Body: Formed and flanged; with steel stiffener ribs; electric spot welded.
1. Body and Shelves: 24 gage, 0.0239 inch.
2. Base: 20 gage, 0.036 inch.
3. Metal Base Height: 4 inch.
C. Frames: Formed channel shape, welded and ground flush, welded to body, resilient gaskets and latching for quiet operation.
1. Door Frame: 16 gage, 0.0598 inch, minimum.
2. Provide ventilation slots in top and bottom of door frame.
https://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20A653/A653M
10 5100 - 2
D. Doors: Hollow double pan, sandwich construction, 1-3/16 inch thick; welded construction, channel reinforced top and bottom with intermediate stiffener ribs, grind and finish edges smooth.
1. Door Outer Face: 18 gage, 0.0478 inch, minimum.
2. Door Inner Face: 20 gage, 0.0359 inch, minimum.
3. Form recess for operating handle and locking device.
4. Provide ventilation slots in top and bottom of door.
E. Hinges: Two for doors under 42 inches high; three for doors over 42 inches high; weld securely to locker body and door.
1. Hinge Thickness: 14 gage, 0.0747 inch.
F. Number Plates: Provide oval shaped brass plates. Form numbers ____ inch high of block font style with ADA designation, in contrasting color.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that prepared bases are in correct position and configuration.
3.02 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Install lockers plumb and square.
C. Place and secure on prepared base.
HORIZONTAL LOUVER BLINDS
12 2113 - 1
SECTION 12 2113
HORIZONTAL LOUVER BLINDS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Horizontal slat louver blinds.
B. Operating hardware.
1.02 REFERENCE STANDARDS
A. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
B. WCMA A100.1 - Safety of Corded Window Covering Products; Current Edition, Including All
Revisions.
1.03 SUBMITTALS
A. Product Data: Provide data indicating physical and dimensional characteristics.
B. Samples: Submit 4 samples, 6 inch long illustrating slat materials and finish, cord type and color.
C. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
1. Extra Blind Assemblies: Two of each size.
2. Extra Lift Cords, Control Cords, and Wands: Two of each type.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Horizontal Louver Blinds Without Side Guides:
1. Hunter Douglas Architectural; to match existing:
www.hunterdouglasarchitectural.com/#sle.
2.02 BLINDS WITHOUT SIDE GUIDES
A. Description: Horizontal slat louvers hung from full-width headrail with full-width bottom rail.
B. Manual Operation: Control of raising and lowering by cord with full range locking; blade angle adjustable by cord.
C. Metal Slats: Spring tempered pre-finished aluminum; square slat corners, with manufacturing burrs removed.
1. Width: 1 inch.
2. Color: As selected by Architect, to match existing mill aluminum finish.
D. Slat Support: Woven polypropylene cord, ladder configuration.
E. Head Rail: Pre-finished, formed aluminum box, with end caps; internally fitted with hardware, pulleys, and bearings for operation; same depth as width of slats.
F. Lift Cord: Braided nylon; continuous loop; complying with WCMA A100.1.
G. Headrail Attachment: Ceiling brackets.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install blinds in accordance with manufacturer's instructions.
B. Secure in place with flush countersunk fasteners.
3.02 CLEANING
A. Clean blind surfaces just prior to occupancy.
http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=NFPA%2070 http://www.wcmanet.org/ http://www.wcmanet.org/
Number Sheet Name 12 /1
0/
M2.05A LEVEL 25 - MECHANICAL DUCTWORK PLAN - SECTOR A X
M2.05B LEVEL 25 - MECHANICAL DUCTWORK PLAN - SECTOR B X
M2.05C LEVEL 25 - MECHANICAL DUCTWORK PLAN - SECTOR C X
M3.00 LEVEL 2 - MECHANCICAL PIPING PLAN X
M3.01 LEVEL 10 - MECHANICAL PIPING PLAN X
M3.02 LEVEL 12 - MECHANICAL PIPING PLAN X
M3.03 LEVEL 18- MECHANICAL PIPING PLAN X
M3.04 LEVEL 24 - MECHANICAL PIPING PLAN x
M3.05 LEVEL 25 - MECHANICAL PIPING PLAN X
M6.00 MECHANICAL DETAILS X
M6.01 MECHANICAL DETAILS X
M7.00 MECHANICAL CONTROLS X
M7.01 MECHANICAL CONTROLS X 1
Number Sheet Name 12 /1
0/
A701 CASEWORK/MILLWORK DETAILS CONT. X 1
A702 2nd FLOOR INTERIOR ELEVATIONS X A710 10th FLOOR INTERIOR ELEVATIONS X A712 12th FLOOR INTERIOR ELEVATIONS X A712B 12th FLOOR INTERIOR ELEVATIONS CONT. X A724 24th FLOOR INTERIOR ELEVATIONS X A725 25th FLOOR INTERIOR ELEVATIONS X A725B 25th FLOOR INTERIOR ELEVATIONS CONT. X
AI ARCHITECTURAL INTERIORS
AI000 FINISHES SCHEDULE X
AI001 ROOM FINISH SCHEDULE X
AI002 ROOM FINISH SCHEDULE CONT. X
AI102 2nd FLOOR FINISH PLAN X AI110.A 10th FLOOR FINISH PLAN - A X AI110.B 10th FLOOR FINISH PLAN - B X AI112.A 12th FLOOR FINISH PLAN - A X AI112.B 12th FLOOR FINISH PLAN - B X AI112.C 12th FLOOR FINISH PLAN - C X AI118 18th FLOOR FINISH PLAN X 1 AI124.A 24th FLOOR FINISH PLAN - A X AI124.B 24th FLOOR FINISH PLAN - B X AI125.A 25th FLOOR FINISH PLAN - A X AI125.B 25th FLOOR FINISH PLAN - B X AI125.C 25th FLOOR FINISH PLAN - C X
WR WINDOW REPAIR
WR102 2nd FLOOR WINDOW REPAIR X WR110A 10th FLOOR WINDOW REPAIR - A X WR110B 10th FLOOR WINDOW REPAIR - B X WR112A 12th FLOOR WINDOW REPAIR - A X WR112B 12th FLOOR WINDOW REPAIR - B X WR112C 12th FLOOR WINDOW REPAIR - C X WR118 18th FLOOR WINDOW REPAIR X WR124A 24th FLOOR WINDOW REPAIR - A X WR124B 24th FLOOR WINDOW REPAIR - B X WR125A 25th FLOOR WINDOW REPAIR - A X WR125B 25th FLOOR WINDOW REPAIR - B X WR125C 25th FLOOR WINDOW REPAIR - C X
S STRUCTURAL
S001 GENERAL NOTES X
S110 10TH FLOOR FRAMING PLAN X
S501 FRAMING DETAILS X
M MECHANICAL
M0.00 MECANICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES X
M0.01 MECHANICAL SCHEDULES X
M0.02 MECHANICAL SCHEDULES X
M1.01 LEVEL 10 - MECHANICAL DEMO PLAN X
M1.03 LEVEL 18 - MECHANICAL DEMO PLAN X
M2.00 LEVEL 2 - MECHANICAL DUCTWORK PLAN X
M2.01A LEVEL 10 - MECHANICAL DUCTWORK PLAN - SECTOR A X
M2.01B LEVEL 10 - MECHANICAL DUCTOWRK PLAN - SECTOR B X
M2.02A LEVEL 12 - MECHANICAL DUCTWORK PLAN - SECTOR A X
M2.02B LEVEL 12 - MECHANICAL DUCTWORK PLAN - SECTOR B X
M2.02C LEVEL 12 - MECHANICAL DUCTWORK PLAN - SECTOR C X
M2.03B LEVEL 18 - MECHANICAL DUCTWORK PLAN - SECTOR B X
M2.04B LEVEL 24 - MECHANICAL DUCTWORK PLAN - SECTOR B X
M2.04C LEVEL 24 - MECHANICAL DUCTWORK PLAN - SECTOR C X
Number Sheet Name 12 /1
0/
A022 DOOR SCH - PHASE 2, HARDWARE SCH X
A030 DOOR TYPES X
A040 WALL TYPES X
A102 2nd FLOOR X A110 10th FLOOR - OVERALL X A110A 10th FLOOR PLAN - A X A110B 10th FLOOR PLAN - B X A112 12th FLOOR - OVERALL X A112A 12th FLOOR PLAN - A X A112B 12th FLOOR PLAN - B X A112C 12th FLOOR PLAN - C X A118 18th FLOOR PLAN & RCP X A124 24th FLOOR - OVERALL X A124A 24th FLOOR PLAN - A X A124B 24th FLOOR PLAN - B X A125 25th FLOOR - OVERALL X A125A 25th FLOOR PLAN - A X A125B 25th FLOOR PLAN - B X A125C 25th FLOOR PLAN - C X
A201 DETAIL SECTIONS X
A210 TYPICAL SECTIONS X
A220 10th FLOOR HIGH DENSITY FILING X A324 PHASE 2A SCOPE-24th FLOOR X A325 PHASE 2A SCOPE-25th FLOOR X 1
A350 RESTROOM PLANS X
A351 RESTROOM DETAILS & 10th ADA X A352 RESTROOM 12th, 24th, & 25th ADA X A353 RESTROOM 12th FAMILY X
A354 RESTROOM ELEVATIONS X
A355 RESTROOM ELEVATIONS CONT. X
A402 2nd FLOOR RCP X A410 10th FLOOR RCP - OVERALL X A410A 10th FLOOR RCP - A X A410B 10th FLOOR RCP - B X A412 12th FLOOR RCP - OVERALL X A412A 12th FLOOR RCP - A X A412B 12th FLOOR RCP - B X A412C 12th FLOOR RCP - C X A424 24th FLOOR RCP - OVERALL X A424A 24th FLOOR RCP - A X A424B 24th FLOOR RCP - B X A425 25th FLOOR RCP - OVERALL X A425A 25th FLOOR RCP - A X A425B 25th FLOOR RCP - B X 1 A425C 25th FLOOR RCP - C X 1
A500 TYPICAL DETAILS X
A510 SPECIAL DETAILS X
A600 10th LOBBY PLANS X A601 10th LOBBY ELEVATIONS X A602 12th LOBBY PLANS X A603 12th LOBBY ELEVATIONS X A604 12th LOBBY ELEVATIONS CONT. X A605 24th LOBBY PLANS X A606 24th LOBBY ELEVATIONS X A607 25th LOBBY PLANS X A608 25th LOBBY ELEVATIONS X
A610 LOBBY DETAILS X
A611 LOBBY DETALS X
A700 CASEWORK/MILLWORK DETAILS X
Number Sheet Name 12 /1
0/
-M6.01-U Unnamed
G GENERAL
G002 GENERAL NOTES, DRAWING LIST CONT. X 1
G003 KEYNOTES, LEGEND, & CODES X
G004 PHASING DIAGRAM X 1
G102 2nd FLOOR LIFE SAFETY X G110 10th FLOOR LIFE SAFETY X G112 12th FLOOR LIFE SAFETY X
G124 18TH & 24TH FLOOR LIFE SAFETY X
G125 25TH FLOOR LIFE SAFETY X
-0 SWS PHASE 1
-A-020-S DOOR SCHEDULE, DETAILS, WALL TYPES X
-A-100-S FLOOR PLAN x
-A-400-S REFLECTED CEILING PLAN X
-A-500-S DETAILS X
-M0.00-S MECANICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES X
-M0.01-S MECHANICAL SCHEDULES X
-M2.00-S SWA - MECHANICAL PLAN X
-M3.00-S ROOF MECHANICAL PLAN X
-M6.00-S MECHANICAL DETAILS X
-M6.01-S MECHANICAL DETAILS X
-M6.02-S MECHANICAL DETAILS X
-M7.00-S MECHANICAL CONTROLS X
-E0.01-S ELECTRICAL LEGEND X
-E0.02-S ELECTRICAL ABBREVIATIONS & NOTES X
-E0.03-S ELECTRICAL LUMINAIRE SCHEDULE X
-E1.00-S ELECTRICAL LEVEL 25 PLAN X
-E4.01-S ELECTRICAL PARTIAL RISER DIAGRAM X
-E5.00-S ELECTRICAL PANELBOARD SCHEDULES X
-E5.01-S ELECTRICAL PANELBOARD SCHEDULES X
-E6.00-S ELECTRICAL DETAILS X
-E6.01-S ELECTRICAL DETAILS X
-FA125-S FIRE ALARM X
-FA500-S DETAILS X
-FP125-S FIRE PROTECTION X
AD PHASE 2 ARCHITECTURAL DEMOLITION
AD202 2nd FLOOR DEMO PLAN X AD210 10th FLOOR DEMO - OVERALL X AD210A 10th FLOOR DEMO PLAN - A X AD210B 10th FLOOR DEMO PLAN - B X AD212 12th FLOOR DEMO - OVERALL X AD212A 12th FLOOR DEMO PLAN - A X AD212B 12th FLOOR DEMO PLAN - B X AD212C 12th FLOOR DEMO PLAN - C X AD218 18th FLOOR DEMO PLAN X AD224 24th FLOOR DEMO - OVERALL X AD224A 24th FLOOR DEMO PLAN - A X AD224B 24th FLOOR DEMO PLAN - B X AD225 25th FLOOR DEMO - OVERALL X AD225A 25th FLOOR DEMO PLAN - A X AD225B 25th FLOOR DEMO PLAN - B X AD225C 25th FLOOR DEMO PLAN - C X
A ARCHTIECTURAL
A020 DOOR SCHEDULE - PHASE 1A & 1B X
A021 DOOR SCHEDULE - PHASE 1B CONT. X
Key:
X = Issued for Review P = Previously Issued = Not Issued (blank) i = For Information Only
Vicinity Map:
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
FP ENGINEER:
MEP ENGINEER:STRUCTURAL ENGINEER:
ARCHITECT:
Occupancy Type:
Project Name:Image: Project Information:
Project Team:
Drawing List:
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/16/2021 10:41:30 AM
G001
12/10/2020
VIRTUAL WALK-THROUGH
COVER SHEET
TB
Approver
Intergral Consulting Engineering 1000 Marietta St. NW, Suite Atlanta GA 30318 404.481.5686
Shear Structural 3411 Pierce Drive, Suite 100 Chamblee, GA 30341 404.735.3712
Coffman Engineers 2180 Satellite Blvd. Suite Duluth, GA 30097 404.480.4470
Houser Walker Architecture 1819 Peachtree Rd NE Suite 102 Atlanta, GA 30309 404.633.4264
USCIS AT PEACHTREE SUMMIT
401 West Peachtree St. NW Atlanta GA 30308
RENOVATION OF PORTIONS OF
FLOORS 2,10,18 AND 24, AND THE
ENTIRE AREA OF FLOORS 12 AND 25.
WORK INCLUDES NEW FINISHES, HVAC,
ELECTRICAL AND LIGHTING,
PLUMBING AND FIRE PROTECTION FOR
ALL REWORKED TENANT AREAS. SCOPE
ALSO INCLUDE NEW FIXTURES AND
FINISHES IN THE RESTROOMS,
ELEVATOR LOBBIES AND CORRIDORS
OF THE OCCUPIED FLOORS, EXCEPT
FOR FLOOR 2. A NEW PACKAGE
SCANNING MACHINE WILL BE
INTEGRATED INTO THE CURRENT
LOADING DOCK SECURITY AREA ON
FLOOR 2.
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
G, A, AI, WR, S, & M
DRAWING LIST CONTINUED ON G002...
Revision Number
Revision Date Revision Description
1 02/16/21 Addendum 001
OUTLINED SHEETS WERE INCLUDED IN THE ORGINAL
ISSUE BUT WERE MIS-NUMBERED ON THE SHEET LIST.
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
MATERIAL KEYNOTES
GENERAL NOTES
SHEET SPECIFIC NOTES
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/16/2021 10:13:17 AM
G002
12/10/2020
VIRTUAL WALK-THROUGH
GENERAL NOTES, DRAWING LIST CONT.
Author Approver
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
Number Sheet Name 12 /1
0/
C ur re nt
R ev isi on
FA125B 25TH FLOOR FIRE ALARM PLAN - B X
FA125C 25TH FLOOR FIRE ALARM PLAN - C X
FA500 DETAILS X
Number Sheet Name 12 /1
0/
C ur re nt
R ev isi on
PD PLUMBING DEMOLITION
PD1.01 PLUMBING PLAN LEVEL 10 - DEMOLITION X
P PLUMBING
P0.00 PLUMBING LEGEND, NOTES AND ABBREVIATIONS X
P0.02 PLUMBING SCHEDULES X
P2.00 PLUMBING PLAN LEVEL 2 X
P2.01 PLUMBING PLAN LEVEL 10 X
P2.02 PLUMBING PLAN LEVEL 12 X
P2.04 PLUMBING PLAN LEVEL 24 X
P2.05 PLUMBING PLAN LEVEL 25 X
P4.01 PART PLUMBING RISERS X
DS DATA & SECURITY
DS000 SECURITY LEGEND X
DS102 2nd FLOOR PLAN X DS110A 10th FLOOR PLAN - A X DS110B 10th FLOOR PLAN - B X DS112A 12th FLOOR PLAN - A X DS112B 12th FLOOR PLAN - B X DS112C 12th FLOOR PLAN - C X DS118 18th FLOOR PLAN X DS124A 24th FLOOR PLAN - A X DS124B 24th FLOOR PLAN - B X DS125A 25th FLOOR PLAN - A X DS125B 25th FLOOR PLAN - B X DS125C 25th FLOOR PLAN - C X DS324 24th FLOOR - 1ST PHASE SCOPE X DS325 25th FLOOR - 1ST PHASE SCOPE X
FP FIRE PROTECTION
FP001 LEGENDS, NOTES, SITE PLAN X
FP102 2ND FLOOR FIRE SPRINKLER PLAN - C X
FP110B 10TH FLOOR FIRE SPRINKLER PLAN - B X
FP110C 10TH FLOOR FIRE SPRINKLER PLAN - A X
FP112A 12TH FLOOR FIRE SPRINKLER PLAN - A X
FP112B 12TH FLOOR FIRE SPRINKLER PLAN - B X
FP112C 12TH FLOOR FIRE SPRINKLER PLAN - C X
FP118 18TH FLOOR FIRE SPRINKLER PLAN - B X
FP124B 24TH FLOOR FIRE SPRINKLER PLAN - B X
FP124C 24TH FLOOR FIRE SPRINKLER PLAN - C X
FP125A 25TH FLOOR FIRE SPRINKLER PLAN - A X
FP125B 25TH FLOOR FIRE SPRINKLER PLAN - B X
FP125C 25TH FLOOR FIRE SPRINKLER PLAN - C X
FP500 TYPICAL FIRE SPRINKLER SECTIONS AND DETAILS X
FA FIRE ALARM
FA102 2ND FLOOR FIRE ALARM PLAN X
FA110A 10TH FLOOR FIRE ALARM PLAN - A X
FA110B 10TH FLOOR FIRE ALARM PLAN - B X
FA112A 12TH FLOOR FIRE ALARM PLAN - A X
FA112B 12TH FLOOR FIRE ALARM PLAN - B X
FA112C 12TH FLOOR FIRE ALARM PLAN - C X
FA118 18TH FLOOR FIRE ALARM PLAN X
FA124B 24TH FLOOR FIRE ALARM PLAN - B X
FA124C 24TH FLOOR FIRE ALARM PLAN - C X
FA125A 25TH FLOOR FIRE ALARM PLAN - A X
Number Sheet Name 12 /1
0/
C ur re nt
R ev isi on
E1.00-S ELECTRICAL LEVEL 25 PLAN
ED ELECTRICAL DEMOLITION
E ELECTRICAL
E0.00 ELECTRICAL LEGEND X
E0.01 ELECTRICAL ABBREVIATIONS & NOTES X
E0.02 ELECTRICAL LUMINAIRE SCHEDULE X
E0.03 ELECTRICAL LIGHTING CONTROLS X
E0.10 ELECTRICAL LEVEL 10 DEMOLITION PLAN X
E0.13 ELECTRICAL LEVEL 18 DEMOLITION PLAN X
E1.00B ELECTRICAL LEVEL 02 PLAN - SECTOR B - POWER X
E1.00C ELECTRICAL LEVEL 02 PLAN - SECTOR C - POWER X
E1.01A ELECTRICAL LEVEL 10 PLAN - SECTOR A - POWER X
E1.01B ELECTRICAL LEVEL 10 PLAN - SECTOR B - POWER X
E1.01C ELECTRICAL LEVEL 10 PLAN - SECTOR C - POWER X
E1.02A ELECTRICAL LEVEL 12 PLAN - SECTOR A - POWER X
E1.02B ELECTRICAL LEVEL 12 PLAN - SECTOR B - POWER X
E1.02C ELECTRICAL LEVEL 12 PLAN - SECTOR C - POWER X
E1.03B ELECTRICAL LEVEL 18 PLAN - SECTOR B - POWER X
E1.04A ELECTRICAL LEVEL 24 PLAN - SECTOR A - POWER X
E1.04B ELECTRICAL LEVEL 24 PLAN - SECTOR B - POWER X
E1.04C ELECTRICAL LEVEL 24 PLAN - SECTOR C - POWER X
E1.05A ELECTRICAL LEVEL 25 PLAN - SECTOR A - POWER X
E1.05B ELECTRICAL LEVEL 25 PLAN - SECTOR B - POWER X
E1.05C ELECTRICAL LEVEL 25 PLAN - SECTOR C - POWER X
E2.00B ELECTRICAL LEVEL 02 PLAN - SECTOR B - LIGHTING X
E2.00C ELECTRICAL LEVEL 02 PLAN - SECTOR C - LIGHTING X
E2.01A ELECTRICAL LEVEL 10 PLAN - SECTOR A - LIGHTING X
E2.01B ELECTRICAL LEVEL 10 PLAN - SECTOR B - LIGHTING X
E2.01C ELECTRICAL LEVEL 10 PLAN - SECTOR C - LIGHTING X
E2.02A ELECTRICAL LEVEL 12 PLAN - SECTOR A - LIGHTING X
E2.02B ELECTRICAL LEVEL 12 PLAN - SECTOR B - LIGHTING X
E2.02C ELECTRICAL LEVEL 12 PLAN - SECTOR C - LIGHTING X
E2.03B ELECTRICAL LEVEL 18 PLAN - SECTOR B - LIGHTING X
E2.04A ELECTRICAL LEVEL 24 PLAN - SECTOR A - LIGHTING X
E2.04B ELECTRICAL LEVEL 24 PLAN - SECTOR B - LIGHTING X
E2.04C ELECTRICAL LEVEL 24 PLAN - SECTOR C - LIGHTING X
E2.05A ELECTRICAL LEVEL 25 PLAN - SECTOR A - LIGHTING X
E2.05B ELECTRICAL LEVEL 25 PLAN - SECTOR B - LIGHTING X
E2.05C ELECTRICAL LEVEL 25 PLAN - SECTOR C - LIGHTING X
E3.01 ELECTRICAL ENLARGED PLANS X
E3.18 ELECTRICAL ENLARGED PLANS X
E5.00 ELECTRICAL PANELBOARD SCHEDULES X
E5.01 ELECTRICAL PANELBOARD SCHEDULES X
E5.02 ELECTRICAL PANELBOARD SCHEDULES X
E5.03 ELECTRICAL PANELBOARD SCHEDULES X
E5.04 ELECTRICAL PANELBOARD SCHEDULES X
E5.05 ELECTRICAL PANELBOARD SCHEDULES X
E5.06 ELECTRICAL PANELBOARD SCHEDULES X
E5.07 ELECTRICAL PANELBOARD SCHEDULES X
E5.08 ELECTRICAL PANELBOARD SCHEDULES X
E5.09 ELECTRICAL PANELBOARD SCHEDULES X
E5.10 ELECTRICAL PANELBOARD SCHEDULES X
E5.11 ELECTRICAL PANELBOARD SCHEDULES X
E5.18 ELECTRICAL PANELBOARD SCHEDULES X
E6.00 ELECTRICAL DETAILS X
E6.01 ELECTRICAL DETAILS X
Drawing List: E, P, DS, FP, & FA
Key:
X = Current Issued for Construction P = Previously Issued = Not Issued (blank) i = For Information Only
CONTRACT DOCUMENTS
1. The Contractor shall maintain at the site for the owner one copy of the drawings, specifications, addenda, change orders and other modifications, in good order and marked currently to indicate field changes and selections made during construction, and one copy of approved shop drawings, product data, samples, and similar required submittals.
2. The Contractor shall perform work in accordance with the Contract Documents.
3. The Drawings and Specifications are complimentary and are to be understood comprehensively. Organization and arrangement of the Drawings and/ or Specifications into divisions, sections and articles shall not control the contractor in dividing the work among subcontractors or in establishing the extent of work to be performed by any trade.
4. Because the Contract Documents are complementary, the Contractor shall, before starting each portion of the work, carefully study and compare the various contract documents relative to that portion of the work, shall take field measurements of any existing conditions related to that portion of the work, and shall observe any condition at the site affecting it.
These obligations are for the purpose of facilitating coordination and construction by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the contract documents. However, the Contractor shall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the Contractor as Request for Information (RFI).
EXISTING CONDITIONS
1. Existing adjacent portions of the building are to remain operational throughout construction.
Coordinate construction activities and phasing with architect to minimize disruptions to Owner’s operations and access, and to ensure safety of occupants.
2. Attention is called to the fact that this project is a renovation of an existing building.
Renovation of existing buildings require thorough coordination of the contract documents with the existing conditions. The Contractor must verify all relevant existing conditions, dimensions, and details prior to beginning construction.
3. All drawings and details incorporating existing conditions are representations of existing conditions only. The Contractor shall verify the accuracy of actual conditions and coordinate with the Architect any deviations of the details so to execute the intent of the drawing or detail.
4. Field verify existing dimensions prior to ordering or cutting materials.
5. Cutting and patching: the Contractor shall be responsible for cutting, fitting or patching required to complete the work or to make parts fit together properly. All areas requiring cutting, fitting and patching shall be restored to the condition existing prior to cutting, fitting and patching.
6. Remove completely materials as indicated on the drawings and as required for new construction. Edges and faces of demolished areas shall be repaired to accept neat installation of new construction or finishes. Where existing materials are to be replaced, existing materials, adhesives, etc. Shall be removed and exposed surfaces shall be repaired as recommended by manufacturer prior to installation of new materials.
7. Patch holes caused by the removal of equipment, piping, conduit, duct, grills, etc with materials matching existing.
8. Where finish schedule shows existing finishes to remain, these finishes to be repaired and/ or extended to be seamless with renovated areas.
9. Surfaces of new and existing finishes are to match in color, texture and consistency, unless noted otherwise.
10. Contractor shall return all salvageable items to owner or dispose of at Owner’s discretion.
OTHER GENERAL REQUIREMENTS
1. The Contractor shall supervise and direct the work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for, and have control over, construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences, or procedures, the contractor shall evaluate the jobsite safety thereof, and shall be fully responsible for the jobsite safety associated with such instructions. If the Contractor determines that such instructions may not be safe, the contractor shall give timely written notice to the owner and architect and shall not proceed with that portion of the work without further written instructions from the Architect.
2. The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the project site during performance of the work. The superintendent shall represent the Contractor and communications given the superintendent shall be binding as if given to the Contractor.
3. Demolition debris shall be removed from the site daily. Contractor shall clean jobsite daily, maintain a clean workplace and keep construction debris and dust away from adjacent building occupants.
4. Install blocking in all walls indicated to receive wall mounted devices and/ or cabinetry.
5. All wood blocking shall be fire retardant treated.
6. Provide double studs at all openings in walls.
7. Fur in all fire extinguisher cabinets so as to afford proper fit and to maintain the integrity of any rated walls in which they occur.
8. All vertical rated mechanical chase assemblies shall extend from floor finish to structure above.
9. All exposed electrical, fire protection, and mechanical devices shall be centered on or align with architectural features as shown on the reflected ceiling plans.
10. Openings created in slabs, smoke partitions, or fire rated partitions by this work shall be repaired using techniques and materials to maintain the rating of the wall, including but not limited to, smoke dampers, fire dampers, firestopping, and fire safing, penetrations of masonry walls and concrete floors shall be stopped to minimum 2 hour rating.
11. Contractor is to coordinate with owner provided materials & services, including: security, a/v, tv, tel/data cabling, and whiteboards.
12. All dimensions are to face of finished surfaces, unless noted otherwise.
GENERAL NOTES:
Revision Number
Revision Date Revision Description
1 02/16/21 Addendum 001
OUTLINED SHEETS WERE INCLUDED IN THE ORGINAL ISSUE
BUT WERE MIS-NUMBERED ON THE SHEET LIST.
AREA OF NO WORK
Vertical chases from floors 1-3
TELECOM/FIBER ENTRANCE
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
MATERIAL KEYNOTES
GENERAL NOTES
SHEET SPECIFIC NOTES
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/15/2021 6:55:16 PM
G004
12/10/2020
VIRTUAL WALK-THROUGH
PHASING DIAGRAM
TB
Approver
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
2ND FLOOR
24TH FLOOR-MDF/
COMPUTER ASSEMBLY25TH FLOOR-SWS
12TH FLOOR
10TH FLOOR
25TH FLOOR
24TH FLOOR
18TH FLOOR
PH
A
SE
A
DA
TA
IN
FR
A
ST
RU
C
TU
RE
IN
C
LU
DE
D A
TA
C
A
BL
IN
G
F
RO
M M
DF
TO
F
UT
UR
E
PH
A
SE
TR
-R
O O
M S
PH
A
SE
A
C A
N B
E C
O
IN
C
ID
EN
T
W
ITH
P
HA
SE
PH
A
SE
B -C
A N
N O
T S
TA
RT
U
N
TIL
M
O
VE
-IN
O
N F
LO
O
R
IS
C O
M
PL
ET
E
Floor 1- TELECOM ENTRANCE
VERTICAL CHASE VERTICAL CHASE
VERTICAL CHASE
VERTICAL CHASE
VERTICAL CHASE VERTICAL CHASE
Revision Number
Revision Date Revision Description
1 02/16/21 Addendum 001
VERTICAL CHASE VERTICAL CHASE
CR
CR
F
F
CR
CR
UP
DN
DNUP
TR-4
2537 11
/2
FLUSH TO
EXISTING
NOT IN PHASE 1
SCOPE
S3Pi S3i
S3i
FLOOR FINISH LEGEND
RF-1
STORAGE
06 10 00.MB
F3
FULL WALL
ALIGN FACE OF FRAMING
TO CORNER OF COLUMN
DO NOT INSTALL FLOOR FINISH
IN CROSSHATCHED AREA UNTIL
CARPET IS BEING INSTALLED IN THE
REST OF THE FLOOR
S3
S3
S3
5' - 7" +/-
18' - 11 3/4"
NOTE 1.
NOTE 1.
NOTE 1.
5'
0" 9'
5/ 8"
5' - 0"
B
A
5'
8"
5' - 8"
5'
3/
4"
FLUSH TO EXISTING
5' - 2"
3'
3/
4"1'
AB
C
8' - 0"
M
FA
TR-4
BREAK GRID HERE TO
MAKE ALIGNMENS ON
TILE SPACING.
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
MATERIAL KEYNOTES
GENERAL NOTES
SHEET SPECIFIC NOTES
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/16/2021 10:46:52 AM
A325
12/10/2020
VIRTUAL WALK-THROUGH
PHASE 1A SCOPE-25th FLOOR
TB
Approver
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
A4 PHASE 1A FLOOR PLAN
06 10 00.MB MOUNTING BOARD
SEE APPENDIX A OF
PROJECT MANUAL FOR
CORING LOCATION TO
MDF BELOW
1. ALL WALLS WITH S3 TAG ARE PERMANENT
WALLS, BUT SHOULD ONLY BE FINISHED ON THE
CORRIDOR SIDE IN THIS SCOPE TO ALLOW FOR
INSTALLATION OF WIRING AND INSULATION IN
PHASE 1B
Revision Number
Revision Date Revision Description
1 02/16/21 Addendum 001
A1 PHASE 1A RCP
A BA1
FLOOR FINISH LEGEND
CPT-3
RF-1
WOMEN
X1800J
MEN
X1800I
LOBBY NORTH
X1800
C O
RR
ID
O R
X1
0A
VESTIBULE
X1800B
TR-4
VESTIBULE
SECURE STORAGE
1806A
STORAGE
PIV ROOM
PIV ROOM
STOR.
1802ATRAINING 2
A. CENTER TILES, PLANKS, PATTERNS, ETC. BETWEEN
PARTITIONS.
B. REFER TO RCPS FOR CEILING FINISHES.
C. DECORATIVE MATERIALS AND TRIM ARE RESTRICTED
BY COMBUSTABILITY AND THE FLAME
PROPAGATION PERFORMANCE CRITERIA OF NFPA
701 IN ACCORDANCE WITH SECTION 806. NO
WOOD FLOORING IS USED IN THIS PROJECT.
D. ALL MATERIALS SHALL MEET THE FOLLOWING
CLASSIFICATIONS ACCORDING TO BUILDING TYPE
AS DEFINED BY ICC TABLE 803.5:
• EXIT ENCLOSURES & PASSAGEWAYS: CLASS B
• CORRIDORS: CLASS B
• ROOMS & ENCLOSED SPACES: CLASS C
AREA OF NO WORK
AB
C
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TIF
IC
AT
IO
NS
KE
Y
PL
AN
RE
VI
SIO
N
NO
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
O
JE
C
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
NT
RA
C
TO
RS
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
MATERIAL KEYNOTES
GENERAL NOTES
SHEET SPECIFIC NOTES
BIM 360://USCIS/1844_USCIS-25 egress rev2.rvt
2/11/2021 4:53:09 PM
AI118
12/10/2020
VIRTUAL WALK-THROUGH
18th FLOOR FINISH PLAN
NP
Approver
GS-04-P-15-BV-D-7018
GS-04P-13-BV-D-0009
401 WEST PEACHTREE ST. NW
ATLANTA, GA
GA001
N1701502
CHRISTOPHER BLACKBURN
PEACHTREE SUMMIT BUILDING
USCIS @ PEACHTREE SUMMIT
NEW OCCUPANCY ON FLOORS 02, 10,12,
18, 24, 25
F1 18th FLOOR FINISH PLAN
1. FINISH NOTES;
A. WALL PAINT - BENJAMIN MOORE, SEAPEARL 961,
EGGSHELL
B. DOOR SLAB FINISH - FROM MANUFACTUER'S
STANDARD STAIN AND FINISH
C. DOOR FRAME - TO BE SELECTED WITH SLAB FINISH
D. RUBBER BASE - ROPPE PINNACLE 4" - 100 BLACK
STANDARD TOE
E. CPT-6 - TANDUS CENTIVA/ MIETRI II #04654 -
AGATE#62107, VERTICAL AHSLAR 18X36 - MAY
PROPOSE TEMPORARY ALERNATE IF PROJECT
AREA IS INSUFFICIENT FOR A MINIMUM ORDER
F. RF-1 - NORA/NORAPLAN ENVIRONCARE 7066/
PARADE
G. ACT - ARMSTRONG ULTIMA LAY-IN TEGULAR 3/4"
THICKNESS, BEVELED TEGULAR 9/16" EGDE, WHITE
Revision Number
Revision Date Revision Description
1 2/1/2021 PHASE 1A 25TH FLOOR
AO - COOLING VALVE
CHWR CHWS
M
CHW
AO - HEATING VALVE
HHWS HHWR
M
HW
DO - FAN START/STOP
RA
T
AI - ZONE TEMP
DA
FAN COIL UNIT CONTROL POINTS MATRIX
POINT NAME HARDWARE POINTS SOFTWARE POINTS SHOW ON GRAPHIC
AI AO DI DO AV DV LOOP SCHED TREND ALARM
ZONE TEMP x
COOLING VALVE x
FAN START/STOP x
HEATING VALVE x
COOLING SETPOINT x
HEATING SETPOINT x
SCHEDULE x
HIGH ZONE TEMP x
LOW ZONE TEMP x
TOTALS 2 2 1 1 2 0 0 1 0 3 10
DRAIN PAN WATER LEVEL x x x x x x x x x x x x
HP
DO - REVERSING VALVE
AO - COMPRESSOR SPEED
AI - DISCHARGE AIR TEMP
T
CTDI - SUPPLY FAN STATUS
RA SA
T AI - ZONE TEMP
GWR
GWS
MBTU
AI - BTU METER
AO - CONDENSER WATER CONTROL VALVE
DX
COIL
WSHP CONTROL SCHEMATIC
WSHP CONTROL POINTS MATRIX
Point Name HARDWARE POINTS SOFTWARE POINTS SHOW ON GRAPHIC
AI AO DI DO AV DV LOOP SCHED TREND ALARM
DISCHARGE AIR TEMP x x
SCHEDULE x
FAN FAILURE x
FAN IN HAND
FAN RUNTIME EXCEEDED
HIGH DISCHARGE AIR TEMP x
LOW DISCHARGE AIR TEMP
LOW ZONE TEMP
COMPRESSOR RUNTIME EXCEEDED
ZONE TEMP x x x
COOLING COIL SUPPLY AIR TEMP SETPOINT x
FAN STATUS x x
COMPRESSOR SPEED x x x
REVERSING VALVE x x
COOLING SETPOINT x x x
HIGH ZONE TEMP x
HEATING SETPOINT x x x x x x x x x x x
GLYCOL WATER CONTROL VALVE x x x
I N T E G R A L
1000 Marietta Street NW Suite 238 Atlanta, GA 30318 404.481.5686 E-Mail: info@integralgroup.com www.integralgroup.com
CONSULTING ENGINEERING
XX0000XX XX0000XX XX0000XX
XX0000XX XX0000XX XX0000XX
XXXX
HOUSER WALKER ARCHITECTURE, LLC.
C
ER
TI
FI
C A
TI
O
N S
K
EY
P
LA
N R
EV
IS
IO
N
N O
TE
S
SHEET SIZE:
DISCIPLINE SHEET NUMBER
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
D R
A W
IN
G
P R
O
JE
C T
B U
IL
D
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
C O
N
TR
A C
TO
R
S
MARK DATE DESCRIPTION
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
22 X 34
GENERAL SERVICES ADMINISTRATION
Region 4 (Southeast - Sunbelt) 77 Forsyth Street Suite # G40 Atlanta, GA 30303
VALID ONLY FOR 22" x 34" SHEET SIZE.
WRITTEN SCALES AT DRAWING TITLE(S) ARE
PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy documents when no longer needed.
H O U S E R W A L K E R A R C H I T E C T U R E
1819 PEACHTREE ROAD, NE
SUITE 102
ATLANTA, GA 30309
T. 4 0 4 . 6 3 3 . 4 2 6 4
F. 4 0 4 . 8 7 0 . 7 3 3 7 www.houserwalker.com
A B C D E F G H J K M N P R
Peachtree Summit Building
401 West Peachtree St. NW
Atlanta, GA
GS-04-P-15-BV-D-7018
GS-04-P-13-BV-D-0009
USCIS@ PEACHTREE SUMMIT
N…