REV 1_L-101 Site Layout.pdf
PDF 570 KB Posted
- Solicitation number
- 47PB0020R0055
About this file
This solicitation notice seeks a Design-Build Bridging team for the design and construction of a new United States Land Port of Entry in Madawaska, Maine. The General Services Administration requires replacement of the existing 1959 facility due to being mission and operationally deficient. The new approximately 76,717 gross square foot facility is to be constructed on a 10.7 acre site and include a Main Port Building, Commercial Inspection Building, three primary inspection lanes, and a bypass lane. Coordination is necessary with the concurrent but separate Maine Department of Transportation project replacing the nearby Madawaska-Edmundston International Bridge over the St. John River, with both projects required to be complete by November 2023. Interested offerors should review project details on the GSA and MaineDOT websites. The General Services Administration encourages participation from small, small disadvantaged, women-owned, service disabled veteran-owned, and HUBZone small businesses. The estimated construction value is between $30-50 million. Proposals are due under Solicitation Number 47PB0020R0055 in accordance with FAR Part 15 using a best value evaluation of technical and priced factors, not lowest price.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPSTREAM
TWIN
RIVERS
PAPER
COMPANY
DOWNSTREAM
+565LP
75'
WETLAND
SETBACK
PROPERTY
LINE
+559
LP
+508 LP
+523 LP
+547
LP
+546
LP
+558
LP
+559
LP
TRUCK
STAGING
PARKING
LOT
E
M
P
L
O
Y
E
S
C
U
R
E
P
A
R
K
I
N
G
L
O
T
V
I
S
I
T
O
R
P
A
R
K
I
G
S
A
W
S
I
G
N
S
T
R
A
I
N
I
V
I
S
I
T
O
R
P
A
R
K
I
DUMPSTER
PAD
IMPOUNDMENT
LOT
535'
520'
530'
525'
O
U
T
B
O
U
N
D
P
A
R
K
I
ROLLING
GATE
ROLLING
GATE
ROLLING
GATE
MANUAL
HINGE
POST
GATES
PROPOSED INTERNATIONAL
BRIDGE AND WINGWALLS
(BY OTHERS, SUBJECT TO
CHANGE, COORDINATE WITH
FINAL DRAWINGS BY BRIDGE
CONTRACTOR)
GA2
MANUAL HINGE POST GATES
GRANITE CURBING
SIDEWALK
CHANGES TO TOPOGRAPHY OUTSIDE OF
SITE PROPERTY LINE ARE PART OF MDOT
BRIDGE PROJECT AND SHALL BE
COORDINATED BY DB-C
DF1
DF1
DF1
DF1
DF1
GA2
GA2
KEY NOTES:
DF1 - DECORATIVE SECURITY PERIMETER FENCE
GA2 - VEHICULAR PIVOT MECHANICAL LIFT GATE Drawing Title:
Drawing No:
Phase:
Architect 112 Shawmut Ave. Ste. 6b Boston, MA 02118 T 734.369.8534 F 734.369.8537
Monica Ponce de Leon Studio, Inc
DATEISSUE
Project #:
1 2 3 4 5
1 2 3 4 5
A B
C D
A B
C D
REVISIONS
MARK DATE DESCRIPTION
Building #:
Contract #:
Owner Information:
General Services Administration Public Buildings Service Region 1 - New England
Design and Construction Division (1 PCM) Thomas P. O'Neill, Jr.
Federal Building, 11th Floor 10 Causeway St.
Boston, MA 02222-1048
These documents represent the scope and intent of the Madawaska Land Port of Entry design for bid purposes. These documents shall not be used for permits, fabrication, or construction.
Authorized: Monica Ponce de Leon, FAIA
License #:
Date:
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICIAL USE ONLY.
Do not remove this notice. Properly destroy documents when no longer needed.
Project Submission History
BRIDGING DOCUMENTS
Th e
Ne w
Ma da wa sk a La nd P or t of
E nt ry
NME00012
Site Layout Plan
L101
ME0052BM + ME0053BM
GSA # GS-00F-114CA
FINAL BCD 1" = 50'-0"
Site Layout
ADDENDUM 11/06/2020
JohnKMaurer Oval
JohnKMaurer Callout Dwg. L101: Pedestrian turnstile gate (GA1) removed at Main St. entrance/exit.
| Sheets and Views |
| L-101 Site Layout |
File details come from the government source that posted it. Updated .