REV 1_A-108 - MPB RCP Lvl 1.pdf
PDF 277 KB Posted
- Solicitation number
- 47PB0020R0055
About this file
This solicitation notice is for a Design Build Bridging (DB-B) Team for the design and construction of a New U.S. Land Port of Entry in Madawaska, Maine. The General Services Administration (GSA) seeks a contractor to complete the design based on bridging documents from a Design-Build Bridging Architect, develop final construction documents, and execute construction of a 76,717 GSF facility including a Main Port Building, Commercial Inspection Building, 3 primary inspection lanes, and a bypass lane. The project requires coordination with the concurrent but separate Maine Department of Transportation project replacing the nearby Madawaska-Edmundston International Bridge by November 2023. The estimated construction value is between $30-50 million. The GSA encourages participation from small, small disadvantaged, women-owned, service disabled veteran-owned and HUBZone businesses. The contractor selection process will consider both price and technical factors. The response deadline is not provided.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0.8
0.8
0.6
0.6
0.4
0.4
0.2
0.2
AA
BB
B.5 B.6
CC
C.5C.5
DD
B.4
6.9
3.4 4.1
7.9
11.7
11.7
4.8 5.3
B.9
5.7
1.5
B.8
8.9
8.9
1.1-08 Supervisor Raised Platform 1.1-09 CBP Officer Supervisor
3.1-02 Violator Property Storage
2.6-09 Seizure Processing Room
3.1-12 Violator Waiting
6.0-04 Elect Cl
3.1-08 TTRT Interview Room3.1-03 Interview Room 1 3.1-05 Hold Room 1
5.0-04 Womens 5.0-01 Staff Break Room
2.1-13 Public Restroom
2.1-13 Public Restroom
Vestibule
2.1-06 Public Waiting Area
1.2-02 Enforcement Work Station
3.1-01 IDENT
Booth
Secure Corridor
3.1-05 Hold Room 1
4.0-08 Weapons Cleaning 4.0-09 Weapons Secure
Storage1.3-03 Files/Supply Storage3.3-01 Agricultural Lab Small 1.3-04 Ag Supply Stor.
5.0-03 Lactation Support
5.0-05 Mens RR/Locker/Shower
Attic Stock (GSA) Office(GSA)
6.0-06 Emergency Generator Room
6.0-08 Janitor Supply
GSA Universal Storage6.0-08 Janitor Closet
6.0-10 Mechanical Room
6.0-05 Electrical Room
7.0-01 Enclosed Government Parking
3.1-05 Hold Room 2
GSA Operations and Maintenance Mechanic
GSA Salt/Sand Storage Ground EquipmentGSA Operations and
Maintenance Mechanic Office
Enclosed Secondary Inspection
Ext. Stairwell M1-11M1-10
M1-04
M1-13
M1-03 M1-30
M1-29 M1-28 M1-27 M1-26
M1-23M1-22
M1-18
M1-16
M1-14
M1-31M1-15 M1-20
M1-02
M1-21
M1-26 M1-25
M1-38M1-24M1-23
M1-39 M1-40
M1-51 M1-50
M1-49
M1-48
M1-47 M1-46
M1-43
M1-44
M1-42
M1-41 M1-45M1-37M1-36M1-35M1-34M1-33M1-32
M1-19
BoothBooth M1-01M1-00
CF-1
CF-2 CF-2 CF-2
CF-1 CF-3
CF-1
CF-1
CF-2
CF-1
RR/Locker/Shower
CF-1 CF-1
CF-2
CF-2CF-2
CF-2
CF-2
CF-2
CF-2 CF-2
10' - 0" 10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0" 10' - 0"
10' - 0"
Secure Corridor
10' - 0"10' - 0" 10' - 0"10' - 0"
10' - 0" 10' - 0"
10' - 0"
10' - 0"
10' - 0"
12' - 4" 12' - 4"
12' - 4"
10' - 0"
10' - 0"10' - 0"
10' - 0"
10' - 0"
10' - 0" 10' - 0"
10' - 0" 10' - 0" 10' - 0"
CF-1
CF-1
CF-1 CF-1
CF-2
CF-2 CF-2 CF-1
CF-1
CF-1
CF-1
Mech Corridor
EXPOSED
EXPOSED
EXPOSED
CF-1
EXPOSED
EXPOSED
EXPOSED
EXPOSED
EXPOSED
CF-1
CF-3
CF-3
CF-1
CF-2
EXPOSED
10' - 0"
10' - 0"
CF-3
10' - 0"
EXPOSED
Drawing Title:
Drawing No:
Phase:
Architect 112 Shawmut Ave. Ste. 6b Boston, MA 02118 T 734.369.8534 F 734.369.8537
Monica Ponce de Leon Studio, Inc
DATEISSUE
Project #:
1 2 3 4 5
1 2 3 4 5
A B
C D
A B
C D
REVISIONS
MARK DATE DESCRIPTION
Building #:
Contract #:
Owner Information:
General Services Administration Public Buildings Service Region 1 - New England
Design and Construction Division (1 PCM) Thomas P. O'Neill, Jr.
Federal Building, 11th Floor 10 Causeway St.
Boston, MA 02222-1048
These documents represent the scope and intent of the Madawaska Land Port of Entry design for bid purposes. These documents shall not be used for permits, fabrication, or construction.
Authorized: Monica Ponce de Leon, FAIA
License #:
Date:
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICIAL USE ONLY.
Do not remove this notice. Properly destroy documents when no longer needed.
Project Submission History
BRIDGING DOCUMENTS
Th e
Ne w
Ma da wa sk a La nd P or t of E nt ry
NME00012
MPB RCP Lvl 1
A-108
ME0052BM
GSA # GS-00F-114CA
FINAL BCD
FINISH KEY:
<CF-1> : 5/8" Gypsum Suspended <CF-2> : 5/8" Gypsum Board Over #9 (10 Ga)
Expanded Metal Mesh, Painted <CF-3> : Wood Panel Suspended <EXPOSED> : Open to structure above
RCP GENERAL NOTES:
1. LEVEL 1 MINIMUM CEILING HEIGHT 9'-0"
2. WHEN OPEN TO ABOVE, SEE LEVEL
ABOVE FOR FINISH INDICATOR
1/16" = 1'-0"1 MPB Level 1 RCP
12' - 4"
10' - 0"
BCD ADDENDUM 11/06/2020
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Arrow
JohnKMaurer Arrow
JohnKMaurer Callout Dwg. A108: Ceiling finish type in M1-18 and M1-19 corrected to CF-1 (no wire mesh).
JohnKMaurer Callout Dwg. A108: Ceiling finish type in M1-36 and M1-37 corrected to CF-2 (with wire mesh).
| Sheets |
| A-108 - MPB RCP Lvl 1 |
File details come from the government source that posted it. Updated .