REV 1_A-108 - MPB RCP Lvl 1.pdf

PDF 277 KB Posted

Attached to
Madawaska Land Port of Entry Design Build Bridge, Maine
Solicitation number
47PB0020R0055
Issued by

About this file

This solicitation notice is for a Design Build Bridging (DB-B) Team for the design and construction of a New U.S. Land Port of Entry in Madawaska, Maine. The General Services Administration (GSA) seeks a contractor to complete the design based on bridging documents from a Design-Build Bridging Architect, develop final construction documents, and execute construction of a 76,717 GSF facility including a Main Port Building, Commercial Inspection Building, 3 primary inspection lanes, and a bypass lane. The project requires coordination with the concurrent but separate Maine Department of Transportation project replacing the nearby Madawaska-Edmundston International Bridge by November 2023. The estimated construction value is between $30-50 million. The GSA encourages participation from small, small disadvantaged, women-owned, service disabled veteran-owned and HUBZone businesses. The contractor selection process will consider both price and technical factors. The response deadline is not provided.

View the file

Other files

File Type Posted
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE REVISED 2020 11 10.pdf PDF
DuboisKing Standard Pen Plot Style - RFP Amendment 0004 20201110.zip ZIP file
REV 1_A-109 - MPB RCP Lvl 2.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0004).pdf PDF
Requests for Clarification and Interpretation for Madawaska LPOE (2020 11 10).xlsx XLSX spreadsheet
REV 1_L-101 Site Layout.pdf PDF
Owners Project Requirements Volume 1 - RFP Amendment 0004 20201110.pdf PDF
Madawaska Design Build SOW - RFP Amendment 0004 20201110.pdf PDF
REV 1 APPENDIX_L_Site Security and Fence Diagram.pdf PDF
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0004) 2020 11 10.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0003).pdf PDF
Copy of DuboisKing Standard.zip ZIP file
Requests for Clarification and Interpretation for Madawaska LPOE (2020 10 30).xlsx XLSX spreadsheet
COBIE EXAMPLES.zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0003) 2020 10 30.pdf PDF
MetricClassWaiver FY21 Design and Construction Program.pdf PDF
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE REVISED 2020 10 29.pdf PDF
CIO_P_2181.1_Homeland_Security_Presidential_Directive-12_Personal_Identity_Verification_and_Credentialing_-_10-20-08)_(Revised_10-5-2015).pdf PDF
Madawaska Preproposal Conference Slides.zip ZIP file
Madawaska Preproposal Conference Movies.zip ZIP file
Madawaska Virtual Pre-Proposal Meeting Table of Contents.pdf PDF
Madawaska Preproposal Attendance Sheet.pdf PDF
2018 P100 Addendum_0.pdf PDF
SS 01 - Future Grading Plan at New Bridge Landing.pdf PDF
SS 01 - Existing Site at New Bridge Landing.pdf PDF
Madawaska Virtual Site Walk Instrustions README.pdf PDF
SS 02 - Existing LPOE and Bridge.pdf PDF
DroneDeploy - Digital Terrain Model Exports.zip ZIP file
DroneDeploy - Elevation Orthomosaic and Plant Health Exports .zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0002) 2020 10 19.pdf PDF
US Customs and Border Protection Non-Disclosure Agreement Form.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0002).pdf PDF
OPR Volume 4 Appendix F.zip ZIP file
SF30 Solicitation 47PB0020R0055 (Amendment 0001).pdf PDF
Madawaska New LPOE Discipline Revit Files 1 of 3.zip ZIP file
OPR Volume 4 Appendices A-E.zip ZIP file
OPR Volume 4 Appendix G.zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0001) 2020 10 07.pdf PDF
OPR Volume 4 Appendices H-Q.zip ZIP file
DBA WD ME20200006 Aroostook County dated 2020 09 18.pdf PDF
SBU Document Security Request for Construction Documents FORM B1.pdf PDF
PBS Past Performance Questionnaire (2014-07 Rev_2015-06).docx DOCX document
Model Subcontracting Plan Template (Updated Apr 2020).pdf PDF
SOW Standards and Criteria Attachments.zip ZIP file
Madawaska Design Build SOW_20200909.pdf PDF
SF24-16d.pdf PDF
C301 (Aug 2020) ME-Madawaska New LPOE 2020 09 30.docx DOCX document
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE 2020 09 30.pdf PDF
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE 2020 09 30.pdf PDF
GSA527-15e.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0.8

0.8

0.6

0.6

0.4

0.4

0.2

0.2

AA

BB

B.5 B.6

CC

C.5C.5

DD

B.4

6.9

3.4 4.1

7.9

11.7

11.7

4.8 5.3

B.9

5.7

1.5

B.8

8.9

8.9

1.1-08 Supervisor Raised Platform 1.1-09 CBP Officer Supervisor

3.1-02 Violator Property Storage

2.6-09 Seizure Processing Room

3.1-12 Violator Waiting

6.0-04 Elect Cl

3.1-08 TTRT Interview Room3.1-03 Interview Room 1 3.1-05 Hold Room 1

5.0-04 Womens 5.0-01 Staff Break Room

2.1-13 Public Restroom

2.1-13 Public Restroom

Vestibule

2.1-06 Public Waiting Area

1.2-02 Enforcement Work Station

3.1-01 IDENT

Booth

Secure Corridor

3.1-05 Hold Room 1

4.0-08 Weapons Cleaning 4.0-09 Weapons Secure

Storage1.3-03 Files/Supply Storage3.3-01 Agricultural Lab Small 1.3-04 Ag Supply Stor.

5.0-03 Lactation Support

5.0-05 Mens RR/Locker/Shower

Attic Stock (GSA) Office(GSA)

6.0-06 Emergency Generator Room

6.0-08 Janitor Supply

GSA Universal Storage6.0-08 Janitor Closet

6.0-10 Mechanical Room

6.0-05 Electrical Room

7.0-01 Enclosed Government Parking

3.1-05 Hold Room 2

GSA Operations and Maintenance Mechanic

GSA Salt/Sand Storage Ground EquipmentGSA Operations and

Maintenance Mechanic Office

Enclosed Secondary Inspection

Ext. Stairwell M1-11M1-10

M1-04

M1-13

M1-03 M1-30

M1-29 M1-28 M1-27 M1-26

M1-23M1-22

M1-18

M1-16

M1-14

M1-31M1-15 M1-20

M1-02

M1-21

M1-26 M1-25

M1-38M1-24M1-23

M1-39 M1-40

M1-51 M1-50

M1-49

M1-48

M1-47 M1-46

M1-43

M1-44

M1-42

M1-41 M1-45M1-37M1-36M1-35M1-34M1-33M1-32

M1-19

BoothBooth M1-01M1-00

CF-1

CF-2 CF-2 CF-2

CF-1 CF-3

CF-1

CF-1

CF-2

CF-1

RR/Locker/Shower

CF-1 CF-1

CF-2

CF-2CF-2

CF-2

CF-2

CF-2

CF-2 CF-2

10' - 0" 10' - 0"

10' - 0"

10' - 0"

10' - 0"

10' - 0"

10' - 0"

10' - 0"

10' - 0" 10' - 0"

10' - 0"

Secure Corridor

10' - 0"10' - 0" 10' - 0"10' - 0"

10' - 0" 10' - 0"

10' - 0"

10' - 0"

10' - 0"

12' - 4" 12' - 4"

12' - 4"

10' - 0"

10' - 0"10' - 0"

10' - 0"

10' - 0"

10' - 0" 10' - 0"

10' - 0" 10' - 0" 10' - 0"

CF-1

CF-1

CF-1 CF-1

CF-2

CF-2 CF-2 CF-1

CF-1

CF-1

CF-1

Mech Corridor

EXPOSED

EXPOSED

EXPOSED

CF-1

EXPOSED

EXPOSED

EXPOSED

EXPOSED

EXPOSED

CF-1

CF-3

CF-3

CF-1

CF-2

EXPOSED

10' - 0"

10' - 0"

CF-3

10' - 0"

EXPOSED

Drawing Title:

Drawing No:

Phase:

Architect 112 Shawmut Ave. Ste. 6b Boston, MA 02118 T 734.369.8534 F 734.369.8537

Monica Ponce de Leon Studio, Inc

DATEISSUE

Project #:

1 2 3 4 5

1 2 3 4 5

A B

C D

A B

C D

REVISIONS

MARK DATE DESCRIPTION

Building #:

Contract #:

Owner Information:

General Services Administration Public Buildings Service Region 1 - New England

Design and Construction Division (1 PCM) Thomas P. O'Neill, Jr.

Federal Building, 11th Floor 10 Causeway St.

Boston, MA 02222-1048

These documents represent the scope and intent of the Madawaska Land Port of Entry design for bid purposes. These documents shall not be used for permits, fabrication, or construction.

Authorized: Monica Ponce de Leon, FAIA

License #:

Date:

PROPERTY OF THE UNITED STATES GOVERNMENT -

FOR OFFICIAL USE ONLY.

Do not remove this notice. Properly destroy documents when no longer needed.

Project Submission History

BRIDGING DOCUMENTS

Th e

Ne w

Ma da wa sk a La nd P or t of E nt ry

NME00012

MPB RCP Lvl 1

A-108

ME0052BM

GSA # GS-00F-114CA

FINAL BCD

FINISH KEY:

<CF-1> : 5/8" Gypsum Suspended <CF-2> : 5/8" Gypsum Board Over #9 (10 Ga)

Expanded Metal Mesh, Painted <CF-3> : Wood Panel Suspended <EXPOSED> : Open to structure above

RCP GENERAL NOTES:

1. LEVEL 1 MINIMUM CEILING HEIGHT 9'-0"

2. WHEN OPEN TO ABOVE, SEE LEVEL

ABOVE FOR FINISH INDICATOR

1/16" = 1'-0"1 MPB Level 1 RCP

12' - 4"

10' - 0"

BCD ADDENDUM 11/06/2020

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Highlight

JohnKMaurer Arrow

JohnKMaurer Arrow

JohnKMaurer Callout Dwg. A108: Ceiling finish type in M1-18 and M1-19 corrected to CF-1 (no wire mesh).

JohnKMaurer Callout Dwg. A108: Ceiling finish type in M1-36 and M1-37 corrected to CF-2 (with wire mesh).

Sheets
A-108 - MPB RCP Lvl 1

File details come from the government source that posted it. Updated .