This memorandum issues a waiver for the use of metric units on the FY21 PBS Design and Construction Program. The waiver allows all project documentation and construction materials to be in imperial units. Key reasons cited for the waiver include the cost of materials and services being higher when using metric units due to industries only stocking imperial products and special ordering metric items. Other reasons given are procurement lead times being longer, increased labor costs and complexity when using metric units, coordination errors being more likely, and existing facilities and historic buildings originally being constructed using imperial units.

The related federal contract opportunity is a solicitation for a Design Build Bridging Team for the design and construction of a New U.S. Land Port of Entry in Madawaska, Maine. The project includes construction of approximately 76,717 GSF facility on a 10.7 acre site with a Main Port Building, Commercial Inspection Building, 3 primary inspection lanes, and a bypass lane. The project must be completed upon opening of a new International Bridge spanning the St. John River between Madawaska, Maine and Edmundston, New Brunswick in November 2023. The estimated construction value is between $30-50 million. The solicitation will require technical and price proposals and selection will made based on best value rather than lowest price.

View the file

Other files

File Type Posted
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE REVISED 2020 11 10.pdf PDF
DuboisKing Standard Pen Plot Style - RFP Amendment 0004 20201110.zip ZIP file
REV 1_A-109 - MPB RCP Lvl 2.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0004).pdf PDF
REV 1_A-108 - MPB RCP Lvl 1.pdf PDF
Requests for Clarification and Interpretation for Madawaska LPOE (2020 11 10).xlsx XLSX spreadsheet
REV 1_L-101 Site Layout.pdf PDF
Owners Project Requirements Volume 1 - RFP Amendment 0004 20201110.pdf PDF
Madawaska Design Build SOW - RFP Amendment 0004 20201110.pdf PDF
REV 1 APPENDIX_L_Site Security and Fence Diagram.pdf PDF
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0004) 2020 11 10.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0003).pdf PDF
Copy of DuboisKing Standard.zip ZIP file
Requests for Clarification and Interpretation for Madawaska LPOE (2020 10 30).xlsx XLSX spreadsheet
COBIE EXAMPLES.zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0003) 2020 10 30.pdf PDF
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE REVISED 2020 10 29.pdf PDF
CIO_P_2181.1_Homeland_Security_Presidential_Directive-12_Personal_Identity_Verification_and_Credentialing_-_10-20-08)_(Revised_10-5-2015).pdf PDF
Madawaska Preproposal Conference Slides.zip ZIP file
Madawaska Preproposal Conference Movies.zip ZIP file
Madawaska Virtual Pre-Proposal Meeting Table of Contents.pdf PDF
Madawaska Preproposal Attendance Sheet.pdf PDF
2018 P100 Addendum_0.pdf PDF
SS 01 - Future Grading Plan at New Bridge Landing.pdf PDF
SS 01 - Existing Site at New Bridge Landing.pdf PDF
Madawaska Virtual Site Walk Instrustions README.pdf PDF
SS 02 - Existing LPOE and Bridge.pdf PDF
DroneDeploy - Digital Terrain Model Exports.zip ZIP file
DroneDeploy - Elevation Orthomosaic and Plant Health Exports .zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0002) 2020 10 19.pdf PDF
US Customs and Border Protection Non-Disclosure Agreement Form.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0002).pdf PDF
OPR Volume 4 Appendix F.zip ZIP file
SF30 Solicitation 47PB0020R0055 (Amendment 0001).pdf PDF
Madawaska New LPOE Discipline Revit Files 1 of 3.zip ZIP file
OPR Volume 4 Appendices A-E.zip ZIP file
OPR Volume 4 Appendix G.zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0001) 2020 10 07.pdf PDF
OPR Volume 4 Appendices H-Q.zip ZIP file
DBA WD ME20200006 Aroostook County dated 2020 09 18.pdf PDF
SBU Document Security Request for Construction Documents FORM B1.pdf PDF
PBS Past Performance Questionnaire (2014-07 Rev_2015-06).docx DOCX document
Model Subcontracting Plan Template (Updated Apr 2020).pdf PDF
SOW Standards and Criteria Attachments.zip ZIP file
Madawaska Design Build SOW_20200909.pdf PDF
SF24-16d.pdf PDF
C301 (Aug 2020) ME-Madawaska New LPOE 2020 09 30.docx DOCX document
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE 2020 09 30.pdf PDF
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE 2020 09 30.pdf PDF
GSA527-15e.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA Public Buildings Service

U.S. General Services Administration

1800 F Street, NW Washington, DC 20405-0002

September 28, 2020

MEMORANDUM FOR: Regional Chief Architects

Regional Design and Construction Directors

FROM: Charles Hardy

Chief Architect (Acting)

Office of the Chief Architect

Public Buildings Service

SUBJECT: Waiver – Metric Units

FY21 PBS Design and Construction Program

This memorandum issues a metric waiver for the FY21 PBS Design and Construction Program, in accordance with the GSA PBS Policy for Granting Waivers and Exceptions. Relevant policy and standards include:

o FAR 11002(b) o GSAM 511.002 GSA Metric Program o GSA Order 8000.1D ADM GSA Metric Program o P-100 Facilities Standards for the Public Buildings Service

The FY21 PBS Design and Construction Program supports successful delivery of projects to federal agencies, on budget and schedule. The GSA works to develop and execute construction programs that best utilize funding. Currently, use of hard metric does not provide a cost-effect manner in which to best satisfy the long-term requirements of federal agencies.

This waiver allows all project documentation and construction materials to be in imperial units.

The approval of this waiver is based on both traditional and project specific reasons for waiving hard metric requirements, including:

o Cost of materials and services o Procurement lead times o Labor productivity and increased complexity of construction projects o Impact to client agencies, operational and maintenance issues o Personnel are not fluent in the metric system.

GSA Public Buildings Service

U.S. General Services Administration

1800 F Street, NW Washington, DC 20405-0002 o Ongoing operational and maintenance costs as a result of industries not stocking metric products and only providing them as a result of special order which increases cost and delay in receiving products o Increased risk for coordination errors in BIM, fabrication, and installation.

o Local industry having disproportionate or lack of local experience with metric construction, which may increase the cost and/or time to deliver the project.

The use of metric increases risk of design and coordination errors for the repairs and alterations

(modernization) of the existing historic buildings and existing facilities originally constructed using imperial units. The use of both “soft metric” and the mixture of metric and imperial units increases the complexity of construction projects as well as risks coordination errors between equipment and building systems, coordination with third party contractors, and coordination with tenant agencies. Further, given the local market’s lack of experience in using metric for construction projects, waiving the use of metric supports GSA’s obligation to maximize competition to the fullest extent practicable.

The cost of metric for some of the materials used in construction, particularly when considering the Buy America Act, is up to 5% to 15% premium paid for material costs when applying hard metric. Hard metric currently is not the accepted industry system for design and construction, commissioning, and facility management, thus, the FY21 PBS Design and Construction

Program is granted a waiver. In addition, use of the metric system creates inefficiencies and causes hardships to the program and mission of impacted agencies. Furthermore, waiving the hard metric requirement supports the GSA obligation to maximize competition to the fullest extent practicable. This waiver is allowable per Executive Order 12770, 1991; Metric usage shall not be required to the extent that such use is impractical or is likely to cause significant inefficiencies or loss of markets to United States firms.

If you have any questions or concerns, please contact Natalie Huber at 202-262-3323.

Cc: Andy Young, Assistant Commissioner, Office of Project Delivery

Central Office Division Directors, Office of Design and Construction Regional Chief Architects

Regional Design and Construction Directors Bill Hunt, Chief Estimator, Office of Project Delivery

File details come from the government source that posted it. Updated .