Madawaska Virtual Pre-Proposal Meeting Table of Contents.pdf

PDF 88 KB Posted

Attached to
Madawaska Land Port of Entry Design Build Bridge, Maine
Solicitation number
47PB0020R0055
Issued by

About this file

This document provides details on a solicitation notice for a Design-Build Bridging Team for a new United States Land Port of Entry in Madawaska, Maine. The General Services Administration is seeking a Design-Build team to complete the design and construction of a new approximately 76,717 gross square foot LPOE facility on a 10.7 acre site, including a Main Port Building, Commercial Inspection Building, three primary inspection lanes, and a bypass lane. The estimated value of the construction is between $30-50 million. The new LPOE will replace an existing 1959 facility and connect to the Madawaska-Edmundston International Bridge, which is being replaced concurrently by the Maine Department of Transportation. The solicitation is designated for small businesses with a NAICS code of 236220 and size standard of $39.5 million. Proposals are due by the date specified in the solicitation, and award will be made based on best value determined by price and technical evaluation factors.

View the file

Other files

File Type Posted
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE REVISED 2020 11 10.pdf PDF
DuboisKing Standard Pen Plot Style - RFP Amendment 0004 20201110.zip ZIP file
REV 1_A-109 - MPB RCP Lvl 2.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0004).pdf PDF
REV 1_A-108 - MPB RCP Lvl 1.pdf PDF
Requests for Clarification and Interpretation for Madawaska LPOE (2020 11 10).xlsx XLSX spreadsheet
REV 1_L-101 Site Layout.pdf PDF
Owners Project Requirements Volume 1 - RFP Amendment 0004 20201110.pdf PDF
Madawaska Design Build SOW - RFP Amendment 0004 20201110.pdf PDF
REV 1 APPENDIX_L_Site Security and Fence Diagram.pdf PDF
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0004) 2020 11 10.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0003).pdf PDF
Copy of DuboisKing Standard.zip ZIP file
Requests for Clarification and Interpretation for Madawaska LPOE (2020 10 30).xlsx XLSX spreadsheet
COBIE EXAMPLES.zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0003) 2020 10 30.pdf PDF
MetricClassWaiver FY21 Design and Construction Program.pdf PDF
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE REVISED 2020 10 29.pdf PDF
CIO_P_2181.1_Homeland_Security_Presidential_Directive-12_Personal_Identity_Verification_and_Credentialing_-_10-20-08)_(Revised_10-5-2015).pdf PDF
Madawaska Preproposal Conference Slides.zip ZIP file
Madawaska Preproposal Conference Movies.zip ZIP file
Madawaska Preproposal Attendance Sheet.pdf PDF
2018 P100 Addendum_0.pdf PDF
SS 01 - Future Grading Plan at New Bridge Landing.pdf PDF
SS 01 - Existing Site at New Bridge Landing.pdf PDF
Madawaska Virtual Site Walk Instrustions README.pdf PDF
SS 02 - Existing LPOE and Bridge.pdf PDF
DroneDeploy - Digital Terrain Model Exports.zip ZIP file
DroneDeploy - Elevation Orthomosaic and Plant Health Exports .zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0002) 2020 10 19.pdf PDF
US Customs and Border Protection Non-Disclosure Agreement Form.pdf PDF
SF30 Solicitation 47PB0020R0055 (Amendment 0002).pdf PDF
OPR Volume 4 Appendix F.zip ZIP file
SF30 Solicitation 47PB0020R0055 (Amendment 0001).pdf PDF
Madawaska New LPOE Discipline Revit Files 1 of 3.zip ZIP file
OPR Volume 4 Appendices A-E.zip ZIP file
OPR Volume 4 Appendix G.zip ZIP file
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE (Amendment 0001) 2020 10 07.pdf PDF
OPR Volume 4 Appendices H-Q.zip ZIP file
DBA WD ME20200006 Aroostook County dated 2020 09 18.pdf PDF
SBU Document Security Request for Construction Documents FORM B1.pdf PDF
PBS Past Performance Questionnaire (2014-07 Rev_2015-06).docx DOCX document
Model Subcontracting Plan Template (Updated Apr 2020).pdf PDF
SOW Standards and Criteria Attachments.zip ZIP file
Madawaska Design Build SOW_20200909.pdf PDF
SF24-16d.pdf PDF
C301 (Aug 2020) ME-Madawaska New LPOE 2020 09 30.docx DOCX document
DB101-Bridging (Aug 2020) ME-Madawaska New LPOE 2020 09 30.pdf PDF
DB201A-DE-Bridging (Jul 2020) ME-Madawaska New LPOE 2020 09 30.pdf PDF
GSA527-15e.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA DESIGN & CONSTRUCTION VIRTUAL PRE-PROPOSAL

CONFERENCE & VIRTUAL SITE VISIT

New U.S. Land Port of Entry (LPOE) in Madawaska, Maine in coordination with the Maine Department of Transportation's

(MaineDOT) and New Brunswick Department of Transportation and Infrastructure's

(NBDTI) Madawaska-Edmundston International Bridge Replacement Project

Wednesday, October 14, 2020

GSA

New England

Region

Madawaska Virtual Pre-Proposal Conference and Virtual Site Visit Table of Contents

Presentations Associated Videos/Documents

GSA Introduction- Carey Bergeron, Program Manager

GSA_Intro_slides_Madawaskapreposalconfe rence

GSA Contracting Powerpoint Slideshow - Michele Valenza/Mark Rinaldi, Contracting Officer

GSA_Contracting_Madawaskaprepropsalcon fernece.MP4

US Department of Labor (DOL) - Office of Federal Contract Compliance Programs (OFCCP) - Rhonda Aubin-Smith, District Director of the Boston District Office

DOL_Madawaskaprepropsalconference.MP4

GSA Office of Small and Disadvantaged Business Utilization (OSDBU) Presentation - Jerry Smith, Small Business Specialist

OSDBU_Madawasapreprosalconference.MP

Maine Procurement Technical Assistance Center-Ken Bloch Director, Maine PTAC

ME_PTAC_Madawaskapreproposalconferen ce.mp4

CBP Video CBP_Video_Madawaskapreproposalconfere nce.wmv

CBP Introductory Words on CBP’s Mission & Day in the Life of CBP Officer - Scott Cyr, Madawaska Port Director

CBP_Madawaskapreprosalconference.pptx

GSA DESIGN & CONSTRUCTION VIRTUAL PRE-PROPOSAL

CONFERENCE & VIRTUAL SITE VISIT

New U.S. Land Port of Entry (LPOE) in Madawaska, Maine in coordination with the Maine Department of Transportation's

(MaineDOT) and New Brunswick Department of Transportation and Infrastructure's

(NBDTI) Madawaska-Edmundston International Bridge Replacement Project

Wednesday, October 14, 2020

GSA

New England

Region

MaineDOT Project Overview - Powerpoint Slideshow by Andrew Lathe, Project Manager

MEDOT_Slides_Madawaskapreproposalconf erence.pptx

MEDOT_Madawaskapreprosalconference.m p4

Pre Proposal Conference Link: https://meet.gsa.gov/p5csuysk26fe/

GSA Project Overview - Powerpoint Slideshow by Alexas Kelly, Project Manager

GSA_Project_Overview_slides_Madawaska preproposalconference.pdf https://meet.gsa.gov/pb69pt2xma7k/

Virtual Site Visual Alexas Kelly, Project Manager https://meet.gsa.gov/pisn99mtc10v/ https://meet.gsa.gov/p5csuysk26fe/?OWASP_CSRFTOKEN=c6cf1bc3f4c39ba12a280272ad2b8f13f6b60f119c455be95ee87e7eb03924e0 https://meet.gsa.gov/pb69pt2xma7k/?OWASP_CSRFTOKEN=95a3b2678a4b008c5f3a71581b32f47ed37b66f345e8004d5f91a757d1ee1dae https://meet.gsa.gov/pisn99mtc10v/?OWASP_CSRFTOKEN=c6cf1bc3f4c39ba12a280272ad2b8f13f6b60f119c455be95ee87e7eb03924e0