REV 1_A-109 - MPB RCP Lvl 2.pdf
PDF 226 KB Posted
- Solicitation number
- 47PB0020R0055
About this file
This solicitation notice seeks proposals for a Design-Build Bridging team for a new United States Land Port of Entry in Madawaska, Maine. Key details include that the General Services Administration is contracting for a team to complete final design, develop construction documents, and execute construction of a 76,717 gross square foot facility on a 10.7 acre site. The facility is to include a Main Port Building, Commercial Inspection Building, three primary inspection lanes, and a bypass lane. The project is to be completed upon opening of a new Madawaska-Edmundston International Bridge in November 2023. The Design-Build Bridging Architect has developed bridging documents for use in design and construction. Proposals are due in accordance with FAR Part 15 and the selection will consider both price and technical factors. The estimated construction value is between $30-50 million. The solicitation encourages participation from small, disadvantaged, women-owned, veteran-owned and HUBZone businesses.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0.8
0.8
0.6
0.6
0.4
0.4
0.2
0.2
AA
BB
B.5
CC
DD
EE
FF
GG
HH
6.9
3.4 4.1
7.9
11.7
11.7
4.3 4.74.5
4.8
4.9 5.1
5.3
5.4 5.55.6
B.9
6.2
5.7
1.5
B.8
8.9
8.9
1.4-06 Classroom
4.0-05 Security System LAN
DEMARC
1.4-04 Confrence/Muster/Training
4.0-07 HSDN
5.0-06 RR
1.3-05 Training Storage
Health + WellnessM2-15
M2-13
M2-14 M2-16M2-12M2-11M2-22
M2-21
M2-20
M2-06
M2-07
M2-18 M2-17
1.4-07 Computer Training Lab1.3-05 Training Storage
1.1-02 Port Director 1.1-03 Assistant Port Director1.1-06 Chief CBP Officer1.3-03 File Storage
1.4-05 Tactical Training Room
4.0-04 LAN Telco Distribution
1.1-09 Training Supervisor
C of fe e
St at io n
Corridor
M2-19M2-10M2-09
M2-08
M2-00
M2-05
M2-04M2-03M2-02M2-01
CF-1
CF-1 CF-1 CF-1
CF-1
CF-1 CF-1
CF-2
CF-1
CF-2
CF-2
CF-2
CF-1
CF-1 CF-1
CF-1
CF-1
CF-1
CF-2
CF-2
CF-1
CF-1
CF-1
CF-3CF-3
CF-3
CF-3
9' - 0" 9' - 0" 9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"9' - 0" 9' - 0"
9' - 0" 9' - 0"
9' - 0"
9' - 0" 9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
22' - 0"
22' - 0"
21' - 4"
22' - 0"
*ELEV. FROM GROUND
*ELEV. FROM GROUND
*ELEV. FROM GROUND
*ELEV. FROM LVL 1
11' - 0" 9' - 0"
EXPOSED
AP APAP
RP RP RP
[secure]
[secure]
E-3 E-3 E-3 E-3AP
AP
AP
AP
AP
Drawing Title:
Drawing No:
Phase:
Architect 112 Shawmut Ave. Ste. 6b Boston, MA 02118 T 734.369.8534 F 734.369.8537
Monica Ponce de Leon Studio, Inc
DATEISSUE
Project #:
1 2 3 4 5
1 2 3 4 5
A B
C D
A B
C D
REVISIONS
MARK DATE DESCRIPTION
Building #:
Contract #:
Owner Information:
General Services Administration Public Buildings Service Region 1 - New England
Design and Construction Division (1 PCM) Thomas P. O'Neill, Jr.
Federal Building, 11th Floor 10 Causeway St.
Boston, MA 02222-1048
These documents represent the scope and intent of the Madawaska Land Port of Entry design for bid purposes. These documents shall not be used for permits, fabrication, or construction.
Authorized: Monica Ponce de Leon, FAIA
License #:
Date:
PROPERTY OF THE UNITED STATES GOVERNMENT -
FOR OFFICIAL USE ONLY.
Do not remove this notice. Properly destroy documents when no longer needed.
Project Submission History
BRIDGING DOCUMENTS
Th e
Ne w
Ma da wa sk a La nd P or t of E nt ry
NME00012
MPB RCP Lvl 2
A-109
ME0052BM
GSA # GS-00F-114CA
FINAL BCD
1/16" = 1'-0"1 MPB LEVEL 2 RCP
FINISH KEY:
<CF-1> : 5/8" Gypsum Suspended <CF-2> : 5/8" Gypsum Board Over #9 (10 Ga) Expanded Metal Mesh, Painted <CF-3> : Wood Panel Suspended <EXPOSED> : Open to structure above <AP> : Access Panel <RP>: Recessed Sloped Panel into Canopy for LED signage by CBP for lane indicators
RCP GENERAL NOTES:
1. LEVEL 2 MINIMUM CEILING HEIGHT 9'-0"
2. TACTICAL TRAINING ROOM TO BE AT
LEAST 10'-0" CEILING HEIGHT
BCD ADDENDUM 11/06/2020
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Highlight
JohnKMaurer Arrow
JohnKMaurer Arrow
JohnKMaurer Callout Dwg. A109: Ceiling finish type in M2-19, M2-20, and M2-21 corrected to CF-2 (with wire mesh).
| Sheets |
| A-109 - MPB RCP Lvl 2 |
File details come from the government source that posted it. Updated .