C.6.22.6 ONGOING COMMISSIONING/RE-TUNING
The contractor shall conduct the six-step re-tuning procedure described in the Pacific Northwest National Laboratory (PNNL) (http://retuningtraining.labworks.org/training/lms/) within the six-month Base Period of the contract. Re-tuning should be performed during the seasonal transitions from cooling to heating and from heating to cooling. This shall be required to be done once during the base six month period. The guidelines provided by PNNL for reviewing a representative sample of building systems and equipment shall be followed. If contractor does not have adequate level of expertise to complete re-tuning, all requirements must be included in BAS maintenance sub-contract. The contractor is required to submit evidence that the training has been completed and a full report after each Re-tuning effort identifying what actions were taken because of the Re-tuning. The contractor shall provide a priced additional service line item for each option year to complete annual (two seasonal) re-tuning.
TO:
C.6.22.6 ONGOING COMMISSIONING/RE-TUNING
The contractor shall conduct the six-step re-tuning procedure described in the Pacific Northwest National Laboratory (PNNL) (http://retuningtraining.labworks.org/training/lms/) once in the six-month Base Period of the contract during the cooling to heating transition period. The guidelines provided by PNNL for reviewing a representative sample of building systems and equipment shall be followed. If contractor does not have adequate level of expertise to complete re-tuning, all requirements must be included in BAS maintenance sub-contract. The contractor is required to submit evidence that the training has been completed and a full report after each Re-tuning effort identifying what actions were taken because of the Re-tuning. The Government will determine whether or not to exercise the Line Item for this annual Re-tuning (be performed during the seasonal transitions from cooling to heating and from heating to cooling) for each Option Year based on building operations.
http://retuningtraining.labworks.org/training/lms/ http://retuningtraining.labworks.org/training/lms/