47PB0017R0004_Tab_10_Amendment_08_Attachment_2_SOW_Revision_2018_06_12.pdf

PDF 98 KB Posted

Attached to
Commercial Facility Management Services at the John J. Moakley Federal Courthouse, Boston, MA - 47PB0017R0004
Solicitation number
47PB0017R0004
Issued by

About this file

47PB0017R0004 Amendment 08 SOW Revision

View the file

Other files

File Type Posted
47PB0017R0004_Tab_10_Amendment_10_Attachment_2_SOW_Revision_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_10_Amendment_Form_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_09_Amendment_Form_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_09_Attachment_2_SOW_Revision_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_09_Attachment_1_SF1449_Revised_(Form)_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_08_Amendment_Form_2018_06_12.pdf PDF
47PB0017R0004_Tab_10_Amendment_08_Attachment_1_SF1449_Revised_(Form)_2018_06_12.pdf PDF
47PB0017R0004_Tab_10_Amendment_07_Attachment_2_SOW_Revision_2018_06_08.pdf PDF
47PB0017R0004_Tab_10_Amendment_07_Attachment_1_SF1449_Revised_2018_06_08.pdf PDF
47PB0017R0004_Tab_10_Amendment_07_Amendment_UNSIGNED_2018_06_08.pdf PDF
47PB0017R0004_Tab_10_Amendment_0006_BAS_Clarification_2018_06_05.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0005.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0004.pdf PDF
47PB0017R0004_Public_Realm_Event_Guidelines.pdf PDF
47PB0017R0004_Tab_10_Questions_&_Answers_v3.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0003_collated.pdf PDF
47PB00170004_Tab_10_Exhibit_32_32BJ-MCNE-Master-Agreement.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Amendment_0003.pdf PDF
47PB0017R0004_Tab_10_Questions_&_Answers_v2.pdf PDF
47PB00170004_Tab_10_Sections_L_Revised.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Pre-Proposal_Attendance_Sheet.pdf PDF
47PB0017R0004__Tab_10_Moakley_CFM_Pre-Proposal_Agenda.pdf PDF
47PB0017R0004__Tab_10_Section_B_-_Description_of_Services.pdf PDF
47PB0017R0004_Tab_10_CPARS_form.pdf PDF
47PB0017R0004__Tab_10_Approved_Devices_(04122018).pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0002.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Pre-Proposal_Pre-Proposal_Slides.pdf PDF
47PB0017R0004__Tab_10_HVAC-AHU-04-01Y-2012.pdf PDF
47PB0017R0004__Tab_10_Moakley_Service_Call_Summary_(2014-2017).pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Questions_&_Answers_v1.pdf PDF
47PB0017R0004__SF1449_Revised_13APR2018.pdf PDF
Moakley_CFM_Amendment_0001.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Section_J_Final.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_RFP_Final.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FROM:

C.6.22.6 ONGOING COMMISSIONING/RE-TUNING

The contractor shall conduct the six step Re-tuning procedure described in the Pacific Northwest National Laboratory (PNNL) (http://retuningtraining.labworks.org/training/lms/) within the base year of the contract two times to coincide with the heating and cooling seasons. The guidelines provided by PNNL for reviewing a representative sample of building systems and equipment shall be followed. If contractor does not have adequate level of expertise to complete re-tuning, all requirements must be included in BAS maintenance sub-contract. The contractor is required to submit evidence that the training has been completed and a full report after each Re-tuning effort identifying what actions were taken because of the Re-tuning.

The contractor shall provide a priced additional service line item for each option year to complete annual (two seasonal) re-tuning.

C.6.22.6 ONGOING COMMISSIONING/RE-TUNING

TO:

The contractor shall conduct the six-step re-tuning procedure described in the Pacific Northwest National Laboratory (PNNL) (http://retuningtraining.labworks.org/training/lms/) within the six-month Base Period of the contract. Re-tuning should be performed during the seasonal transitions from cooling to heating and from heating to cooling. This shall be required to be done once during the base six month period. The guidelines provided by PNNL for reviewing a representative sample of building systems and equipment shall be followed. If contractor does not have adequate level of expertise to complete re-tuning, all requirements must be included in BAS maintenance sub-contract. The contractor is required to submit evidence that the training has been completed and a full report after each Re-tuning effort identifying what actions were taken because of the Re-tuning. The contractor shall provide a priced additional service line item for each option year to complete annual (two seasonal) re-tuning.

File details come from the government source that posted it.