47PB0017R0004_Tab_10_Amendment_07_Attachment_2_SOW_Revision_2018_06_08.pdf

PDF 98 KB Posted

Attached to
Commercial Facility Management Services at the John J. Moakley Federal Courthouse, Boston, MA - 47PB0017R0004
Solicitation number
47PB0017R0004
Issued by

About this file

Moakey CFM Amendment 07 Amendment Attachment 2 SOW Revision 2018 06 08

View the file

Other files

File Type Posted
47PB0017R0004_Tab_10_Amendment_10_Attachment_2_SOW_Revision_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_10_Amendment_Form_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_09_Amendment_Form_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_09_Attachment_2_SOW_Revision_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_09_Attachment_1_SF1449_Revised_(Form)_2018_06_13.pdf PDF
47PB0017R0004_Tab_10_Amendment_08_Amendment_Form_2018_06_12.pdf PDF
47PB0017R0004_Tab_10_Amendment_08_Attachment_2_SOW_Revision_2018_06_12.pdf PDF
47PB0017R0004_Tab_10_Amendment_08_Attachment_1_SF1449_Revised_(Form)_2018_06_12.pdf PDF
47PB0017R0004_Tab_10_Amendment_07_Attachment_1_SF1449_Revised_2018_06_08.pdf PDF
47PB0017R0004_Tab_10_Amendment_07_Amendment_UNSIGNED_2018_06_08.pdf PDF
47PB0017R0004_Tab_10_Amendment_0006_BAS_Clarification_2018_06_05.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0005.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0004.pdf PDF
47PB0017R0004_Public_Realm_Event_Guidelines.pdf PDF
47PB0017R0004_Tab_10_Questions_&_Answers_v3.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0003_collated.pdf PDF
47PB00170004_Tab_10_Exhibit_32_32BJ-MCNE-Master-Agreement.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Amendment_0003.pdf PDF
47PB0017R0004_Tab_10_Questions_&_Answers_v2.pdf PDF
47PB00170004_Tab_10_Sections_L_Revised.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Pre-Proposal_Attendance_Sheet.pdf PDF
47PB0017R0004__Tab_10_Moakley_CFM_Pre-Proposal_Agenda.pdf PDF
47PB0017R0004__Tab_10_Section_B_-_Description_of_Services.pdf PDF
47PB0017R0004_Tab_10_CPARS_form.pdf PDF
47PB0017R0004__Tab_10_Approved_Devices_(04122018).pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Amendment_0002.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Pre-Proposal_Pre-Proposal_Slides.pdf PDF
47PB0017R0004__Tab_10_HVAC-AHU-04-01Y-2012.pdf PDF
47PB0017R0004__Tab_10_Moakley_Service_Call_Summary_(2014-2017).pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Questions_&_Answers_v1.pdf PDF
47PB0017R0004__SF1449_Revised_13APR2018.pdf PDF
Moakley_CFM_Amendment_0001.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_Services_Section_J_Final.pdf PDF
47PB0017R0004_Tab_10_Moakley_CFM_RFP_Final.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FROM:

C.6.22.6 ONGOING COMMISSIONING/RE-TUNING

The contractor shall conduct the six step Re-tuning procedure described in the Pacific Northwest National Laboratory (PNNL) (http://retuningtraining.labworks.org/training/lms/). If contractor does not have adequate level of expertise to complete re-tuning, all requirements must be included in BAS maintenance sub-contract. The initial frequency of the re-tuning is semi-annually to coincide with the heating and cooling seasons. After completing two re-tuning cycles the co or their designee in consultation with the contractor will determine the appropriate frequency of the re-tuning effort based on the size and complexity of the facility. The contractor is required to submit evidence that the training has been completed and a report after each Re-tuning effort identifying what actions we taken because of the Re-tuning.

TO:

C.6.22.6 ONGOING COMMISSIONING/RE-TUNING

The contractor shall conduct the six step Re-tuning procedure described in the Pacific Northwest National Laboratory (PNNL) (http://retuningtraining.labworks.org/training/lms/) within the base year of the contract two times to coincide with the heating and cooling seasons. The guidelines provided by PNNL for reviewing a representative sample of building systems and equipment shall be followed. If contractor does not have adequate level of expertise to complete re-tuning, all requirements must be included in BAS maintenance sub-contract. The contractor is required to submit evidence that the training has been completed and a full report after each Re-tuning effort identifying what actions we taken because of the Re-tuning.

The contractor shall provide a priced additional service line item for each option year to complete annual (two seasonal) re-tuning.

File details come from the government source that posted it.