47PB0017R0004 Amendment 0006 BAS Clarification
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable simeonaberry Inserted Text ddddd
Building Automation System (BAS) Clarification
The Government has been alerted to an interpretation of the subject solicitation by Gwynn Systems, a potential subcontractor, that the Pacific Northwest National Laboratory (PNNL) Re-tuning Training (http://www.pnnl.gov/buildingretuning/training.stm) referenced in Exhibit #19 (“Clarification For Completing The Annual Report On Energy And Water Efficiency”), Attachment #2, of the solicitation requires manual testing and calibration of every point in the Building Automation System (BAS). This interpretation is not in line with the recommendations and requirements of the aforementioned training, nor those of Exhibit 8 (“GSA Best Practices for Building Automation System Technicians”) of the solicitation.
Additionally, the Government wishes to call attention to the requirements in the solicitation regarding the existing, proprietary Automatrix system currently in use at the Moakley Courthouse:
C.6.22.4 REPORTING
The Contractor is responsible for retaining an adequate level of expertise to manage the control systems. This may require changing sequences of operations, calibrating sensors or adjusting schedules. If the Contractor does not have a manufacturer trained or equivalent BAS operator onsite, the Contractor shall enter into a subcontract, including regular scheduled support (not merely support on a contingency basis), or remote access; with a firm that has these skills. This subcontract shall include regularly scheduled maintenance including sequence of operation tuning, calibration; BAS log review and other BAS system maintenance. Reporting, log reviews, and operations checklists shall be done and provided in accordance with “GSA Best Practices for Building Automation System Technicians.”
C.6.22.3 BAS CONTROL SYSTEMS
Control systems shall be maintained as designed. The Contractor will be responsible for maintaining BAS hardware and software. Contractor must provide all security patches and minor software revisions for BAS Server, Client and Controllers. Contractor must maintain all certifications, registration, license or service agreements with BAS manufacturer to receive patches and revisions. If the contractor is not capable of maintaining the patching and updating of the system, they will be responsible for a maintenance agreement with a sub-contractor (commonly known as System Integrator) that is capable of performing the patch/updated software work. Patching should happen within 90 days of manufacturer's official release and GSA Building Manager and GSA Public Buildings IT Services shall be notified when patching is applied.
Contractor services for BAS shall follow the recommendations and requirements of the GSA Best Practices for Building Automation System Technicians. The latest version is provided as an exhibit.
[Emphasis added] http://www.pnnl.gov/buildingretuning/training.stm
| 47PB0017R0004 Tab 10 Amendment 06 Amendment Form DRAFT 2018 06 04 |
| 47PB0017R0004 Tab 10 Amendment 06 Amendment Attachment 1 BAS Clarification 2018 06 04 |
| 1_CONTRACT_ID_CODE: |
| Textfield: 1 |
| 2_AMENDMENTMODIFICATION_NO: 0006 |
| 3_EFFECTIVE_DATE: 06/05/2018 |
| 4_REQUISITIONPURCHASE_REQ_NO: |
| 5_PROJECT_NO_If_applicable: |
| Textfield0: |
| Textfield1: |
| 8_NAME_AND_ADDRESS_OF_CONTRACTOR_No_street_county: THIS AMENDMENT MUST BE ACKNOWLEDGED |
See block 11 below
| 9B_DATED_SEE_ITEM_11: Off |
| CODE: |
| FACILITY_CODE: |
| 10B_DATED_SEE_ITEM_13: Off |
| The_above_numbered_solicitation_is_amended_as_set: On |
| is_extended: On |
| is_not_extended: Off |
| a_By_completing_items_8_and_15_and_returning: 1 |
| and_this_amendment_and_is_received_prior_to_the_op: |
| 13_THIS_ITEM_ONLY_APPLIES_TO_MODIFICATION_OF_CONTR: |
| ChkBox: Off |
| A_THIS_CHANGE_ORDER_IS_ISSUED_PURSUANT_TO_Specify: |
| date_etc_SET_FORTH_IN_ITEM_14_PURSUANT_TO_THE_AUTH: Off |
| ChkBox0: Off |
| ChkBox1: Off |
| is_not: Off |
| is_required_to_sign_this_document_and_return: On |
| is_required_to_sign_this_document_and_return0: 1 |
| 15A_NAME_AND_TITLE_OF_SIGNER_Type_or_print: |
| 16A_NAME_AND_TITLE_OF_CONTRACTING_OFFICER_Type_orp: Anthony Pellegrino |
| Signature_of_person_authorized_to_sign: |
| 15C_DATE_SIGNED: |
| Signature_of_Contracting_Officer: |
| 16C_DATE_SIGNED: |
| 9A_AMENDMENT_OF_SOLICITATION_NO: CFM Services at Moakley Courthouse |
| 9B_DATED_SEE_ITEM_110: 05/02/2018 |
| 10A_MODIFICATION_OF_CONTRACTORDER_NO: |
| 10B_DATED_SEE_ITEM_130: |
| C_THIS_SUPPLEMENTAL_AGREEMENT_IS_ENTERED_INTO_PURS: |
| D_OTHER_Specify_type_of_modification_and_authority: |
| 8_NAME_AND_ADDRESS_OF_CONTRACTOR_No_street_countya: General Services Administration |
10 Causeway Street, 11th floor Boston, MA, 02222-1001 8_NAME_AND_ADDRESS_OF_CONTRACTOR_No_street_countyB: Same as Block 6 Attn: Ms. Stephanie Klein, Contract Specialist
(617) 565-5005 8_NAME_AND_ADDRESS_OF_CONTRACTOR_No_street_countyc: Solicitation referenced in Block #9A for the CFM Services at the John J. Moakley Federal Courthouse in Boston, MA, is hereby amended as follows:
1. Incorporate the attached clarification, entitled "Building Automation System (BAS) Clarification."
2. The deadline for receipt of proposals is hereby extended to 2:00 pm, EST, Monday, June 11th, 2018.
3. Any Offerors who have previously submitted a proposal shall:
1) submit a delta proposal (rather than a new proposal entire), indicating any additions, revisions, or deletions in a "From", "By", "To" format which will show changes clearly; OR
2) affirm that there are no changes to the previous offer.
Textfield2: 2