42250134_Pre-Bid RFI Log.pdf
PDF 2 MB Posted
- Attached to
- Lickdale Renovation - Phase 2
- Solicitation number
- 6100065581
- Issued by
- Lebanon County, Pennsylvania
About this file
This is a Pre-Bid Request for Information (RFI) Log for the Lickdale Renovation - Phase 2 project managed by the Commonwealth of Pennsylvania Department of Military and Veterans Affairs (DMVA). The project encompasses three construction disciplines—General Construction, HVAC, and Electrical work—at the Lickdale Veteran's and Military Outreach Facility located at 40 Fisher Avenue, Jonestown, Lebanon County, Pennsylvania. The scope of work includes installation of new HVAC systems, electrical work associated with the new HVAC equipment, and removal and replacement of existing acoustical ceiling grid and tile within the 34,442 square-foot facility. The project requires four new rooftop units with variable air volume terminal units and reheat coils, new piping and ductwork systems, integration with a Johnson Controls Metasys Building Management System, and provision of temporary office and restroom modular facilities with utilities for displaced building occupants during the 270-calendar-day construction period. The mandatory pre-bid conference was held on March 18, 2026, at 10:00 AM on-site, with questions due by 3:30 PM EST on March 30, 2026, and sealed bids due on April 8, 2026, at 2:00 PM through the Pennsylvania Supplier Portal (subsequently extended to April 10, 2026, per RFI #047). The RFI log contains 53 questions submitted during the bid phase addressing technical clarifications regarding demolition sequencing, electrical work, HVAC equipment specifications, temporary facility requirements, material storage, roof work, asbestos concerns, lighting fixture reuse, boiler specifications, refrigerant piping removal, construction scheduling, and SDB/VBE participation documentation.
The estimated budget ranges are General Construction $200,001.00 to $400,000.00, HVAC $1,000,001.00 to $1,500,000.00, and Electrical $400,001.00 to $600,000.00, with liquidated damages assessed at $130.00 per day for General Construction, $370.00 per day for HVAC, and $160.00 per day for Electrical. The HVAC discipline carries specific Small Diverse Business (SDB) participation goals of 12 percent and Veteran Business Enterprise (VBE) participation goals of 3 percent; bidders must meet the established participation goals in full or demonstrate good faith efforts if unable to achieve full compliance. All bidders must be registered as vendors through the Pennsylvania Supplier Portal and maintain a current, active vendor number prior to bid submission. Key RFI responses addressed that the roof is currently under warranty (built-up TPO system installed by Spotts Brothers, Inc., with expiration date October 20, 2045) and that the Point 2 HVAC Contractor is responsible for all roof penetrations; the Point 2 HVAC Contractor serves as the Lead Contractor responsible for developing and coordinating the overall construction schedule; temporary modular office and restroom trailers will accommodate 16 personnel with specific ADA requirements (Male: 1 ADA water closet, 1 ADA urinal, 1 ADA lavatory; Female: 1 ADA water closet, 1 standard water closet, 1 ADA lavatory) operating Monday through Friday from 0700 to 1700 hours; the existing boilers are dual-fuel but the new boiler will operate on natural gas only at 2 psi; all lighting fixtures building-wide are to be removed, stored, and reinstalled after ceiling work except in the multi-purpose room where new fixtures will be installed; and the contractor is not responsible for the condition of existing batteries in removed light fixtures. All workers must comply with Pennsylvania Prevailing Wage Act, Davis-Bacon Act requirements, an enhanced minimum wage of $15.00 per hour, employment verification through the Public Works Employment Verification Act, and background checks with photo identification for facility access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| General Conditions to the Construction Contract DMVA 2024 v6.docx | DOCX document | |
| 42250134_Drawings-Final.pdf | ||
| Addendum #4.docx | DOCX document | |
| Notice to Bidders.docx | DOCX document | |
| Bid docs to be returned.pdf | ||
| Wage Rates.pdf | ||
| Addendum #2.docx | DOCX document | |
| 6100065581 BDISBO SDB VBE presentation.pdf | ||
| 42250134_Specifications-Final.pdf | ||
| Instructions to Bidders DMVA - 2024.docx | DOCX document | |
| Administrative Procedures 2023 DMVA.docx | DOCX document | |
| Addendum #3.docx | DOCX document | |
| Addendum #5.docx | DOCX document | |
| Addendum #6.docx | DOCX document | |
| Addendum #1.docx | DOCX document | |
| Pre-Bid sign in.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.:
Project Name:
RFI # Submitted By Point Date
Submitted Description Discipline Assigned To Response
Addendum No.
001 Bognet, Inc 2 - HVAC 3/11/26 Will all the ceiling demolition work be performed at one time or is it phased? General Const. Jason Nye The ceiling demolition may be done all at once. 4
002 Bognet, Inc 2 - HVAC 3/11/26 Will the new ceilings be installed after all HVAC and Electrical work is completed and tested?
General Const. Jason Nye
New ceiling installation shall not take place till all above ceiling work has been completed and tested. This work shall be coordinated with all Prime contractors and if possible, perfromed in phases so not to delay project progress [or] delay the Point 1 Contractor from completing their work per the approved project construction schedule.
003 Bognet, Inc 2 - HVAC 3/11/26 Is there any asbestos material in the ceilings? General Conditions Jason Nye No 4
004 US Solutions, Inc 4 - Electrical 3/12/26 Drawing E.1.2 , West Wing lighting looks like hallway gets new lighting the rest of the wing is like East Wing, take down and put up Correct?
Electrical Dennis Healey
All lights in the building are to be removed and stored for the ceiling work and re-installed after the ceiling work with the exception of the multi-purpose room. The multi-purpose room will have new lighting fixtures installed. The circuits shall remain the same.
005 DMVA-BDPM 2 - HVAC 3/13/26
Drawing C1.0 - Note 3 Reads, "The .3 Contractor is required to provide/coordinate Temporary Office Trailers and Restrooms for the current Building Occupants and Provide Power to said Trailers."
General Conditions Mark Griffin
Please know same Drawing [Drawing C1.0] and Specification Section 010100 Paragraph 2.1(b)(4) & (5), and Specification Section 011200, Paragraph 2.2(a)(1) & (2), appropriately addresses this contract requirement and the .2 HVAC Contractor is responsible. Therefore, Drawing [Drawing C1.0], General Note 3 should read, "The .2 Contractor" instead of The .3 Contractor.
006 Master Mechanical Corp. 2 - HVAC 3/17/26 Can you please kindly confirm that for this project, you do NOT have to be a Veteran-Business-Owned company in order to be considered/to bid?
General Conditions Tina Rebuck No, you do not need to be a certified veteran owned business to bid on this project.
007 Master Mechanical Corp. 2 - HVAC 3/18/26 Will floor protection be required to protect all existing floors? If so, which prime is responsible to lay it down and take it back out? What type of protection product would be required?
General Conditions Jason Nye
Yes. The Point 1 General Contractor shall be responsible for providing the required floor protection. All Prime Contractors and their sub-contractors will be held resposnible for maintaining the floor protection throughout the duration of the project. It will be at the contractors discretion on what type of floor protection to utilize.
008 Master Mechanical Corp. 2 - HVAC 3/18/26 Will a construction schedule be required, if so which prime would be responsible to develop it/ update it?
General Conditions Mark Griffin
In accordance with Project Specifications, Division 01, Section 013100, Paragraph 1.5B, "The Lead Contractor shall submit a construction schedule, for the total project, including all prime contractors critical path work items. The schedule shall be submitted at the pre-construction meeting. The schedule will be reviewed and approved by the designer and the using agency to confirm compliance with construction sequencing and Using Agency training schedule."
In addition, Division 01, Section 010400, Coordination and Control, Paragraph 1.6A, establishes the HVAC (.2) Contractor as the Lead Contractor and shall be responsible for coordination between all contracts. Therefore, the .1 Contractor and .4 Contractor are responsible to coordinate their individual construction tasks / milestones with the Lead Contractor (.2) for an overall Construction Schedule.
009 Master Mechanical Corp. 2 - HVAC 3/18/26 Is the roof under warranty and will the prime contractor be required to maintain it?
Which roofing system is it and who installed it?
General Conditions Jason Nye
The roof is currently "Under Warranty". The Point 2 HVAC Contractor will be responsible for all required roof penetrations along with insuring all associated work has been repaired and/or patched in such a manner that provides 100% water tightness and does not void the current warranty. Spotts Brothers, Inc.
(Schuylkill Haven, PA). The roof is a built-up TPO roofing system. The Department will provide the awarded Point 2 HVAC Contractor a copy of Carlisle SYNTEC Systems Warranty so to obtain written authorization from Carlisle prior to installation of subject utilities in an effort to maintain Warranty (Warranty Expiration Date: 10/20/2045)
010 SAS, Inc 4 - Electrical 3/19/26
Note 1 on drawing E0.2 states the contractor shall remove light fixtures, with no mention of storing them. Note 1 on drawing E1.2 states that the contractor shall install the lighting as indicated. Can you confirm that the lights in the west wing are new and we are not reusing existing lights?
Electrical Dennis Healey
All lights in the building are to be removed and stores for the ceiling work and re-installed after the ceiling work with the exception of the multi-purpose room. The multi-purpose room will have new lighting fixtures installed. The circuits shall remain the same.
011 WC Eshenaur and Son, Inc. 2 - HVAC 3/20/26 If the duct is covered at each break in work or end of the day daily will duct cleaning still be required?
HVAC Brian Toevs Protecting and covering the ends of the open duct work will be adequate to prevent cleaning.
42250134 Lickdale VMOC HVAC ReplacementBID PHASE - REQUEST FOR INFORMATION
RFI # Submitted By Point Date
Submitted Description Discipline Assigned To Response
Addendum No.
42250134 Lickdale VMOC HVAC ReplacementBID PHASE - REQUEST FOR INFORMATION
012 WC Eshenaur and Son, Inc. 2 - HVAC 3/23/26 The Boilers that are there now are dual fired, oil/gas. The new Burner should be the same?
HVAC Brian Toevs The existing boilers were/are dual fuel. The oil system is disabled. The new boiler will be natural gas only. The gas pressure is 2 psi. The burner shall be able to accept 2 psi gas.
013 WC Eshenaur and Son, Inc. 2 - HVAC 3/23/26 The Spec on the boiler schedule says 208v/3ph/60Hz and the burner in operation now has a 115v motor. Are we to assume the New Boiler is both 115v and dual fired?
HVAC Brian Toevs The new boiler electric shall match existing boiler electric. The burner motor is 120/208-230 convertible. This boiler is a 1 for 1 replacement.
014 Master Mechanical Corp. 2 - HVAC 3/24/26 After the refrigerant is reclaimed are the underground refrigerant pipes to be dug up and removed or abandoned in place?
HVAC Brian Toevs The piping pass from the building through an accessible vault and rises up out of the vault to connect to the chiller. All the piping shall be removed and the remaining holes shall be filled to match the existing surroundings.
015 Master Mechanical Corp. 2 - HVAC 3/24/26 Does the chilled water pump, remote condenser and evaporator housekeeping pads get removed or are they to remain?
HVAC Brian Toevs If the associated Base Bid is accepted, the chilled water pumps and evaporator shall be removed. The concrete pads can remain in place.
016 Master Mechanical Corp. 2 - HVAC 3/24/26 Is the hot water pump and boiler housekeeping pad to remain for reuse with the new pumps and boiler?
HVAC Brian Toevs Yes, the housekeeping pads shall be reused. 4
017 US Solutions, Inc 4 - Electrical 3/24/26 Will there be an addendum confirming where new lighting fixtures are to be installed? Believe No. 19 pertains to Original RFI Question No. 4. MEG.
Electrical Dennis Healey Yes, there will be an addendum. 4
018 Tri Vet Contracting Co., Inc. 4 - Electrical 3/24/26 Some light fixtures listed to be removed, stored and reused contain a battery backup. Will contractor be expected to cover the cost if the batteries are found to no longer function after the storage period?
Electrical Dennis Healey The contractor is not responsible for the condition of existing batteries. 4
019 Tri Vet Contracting Co., Inc. 4 - Electrical 3/24/26 Are all lighting fixtures in the West Wing west of match line to be removed from site and disposed of?
Electrical Dennis Healey
All lights in the building are to be removed and stored for the ceiling work and re-installed after the ceiling work with the exception of the multi-purpose room. The multi-purpose room will have new lighting fixtures installed. The circuits shall remain the same.
020 Tri Vet Contracting Co., Inc. 4 - Electrical 3/24/26 Will room inside the building be made available for material storage such as for the light fixtures that are to be reused?
General Conditions Mark Griffin
The Department will coordinate with all appointed contractors so to make material storage rooms available inside of the building. Intent is to assign separate room per contractors for efficient operations. In addition, per construction schedule - Department is able to assist with assigned storage room in different parts of building.
021 Master Mechanical Corp. 2 - HVAC 3/25/26 Approximately how many people will be using the restrooms daily? General Conditions Mark Griffin
Please know per Specification Section 011200 (Coordination and Control), Paragraph 2.2(a)(1), each modular office trailer will occupy a total of eight personnel, times two - equals a total of sixteen (16) personnel. Considering visitors from the public for services daily, estimation totals between twenty (20) and twenty-four (24) per day.
022 Master Mechanical Corp. 2 - HVAC 3/25/26 How many stalls were you looking to have in the trailer? Typically ADA trailers have a unisex bathroom with a ramp leading to it and then there is other bathrooms attached that have steps to enter.
General Conditions Jason Nye Male = (1) ADA Water closet, (1) ADA Urinal and (1) ADA Lav. Female = (1) ADA Water closet, (1) Standard Water Closet, (1) ADA Lav.
023 Master Mechanical Corp. 2 - HVAC 3/25/26 Is there water and 20 amp power within 100 ft of where the trailer will sit? General Conditions Keith Lloyd With respect to power, refer to RFI #40. Water - No. Contractor will ensure trailers have water tanks and DMVA will fill water tanks for the trailers.
024 Master Mechanical Corp. 2 - HVAC 3/25/26 Are any services needed, such as pump-outs/cleanings, housekeeping, etc.? General Conditions Mark Griffin
The Point 2 (HVAC Contractor) shall provide and maintain the temporary modular trailers (office / restroom) during contract duration. In addition, same contractor will maintain all necessary services and utilities to include, but not limited to;
electrical services, sanitary and water services, heating and cooling, cleaning, pumping, and required maintenance.
025 Master Mechanical Corp. 2 - HVAC 3/25/26 When is the project supposed to start? General Conditions Tina Rebuck The Department will not have a start date until all the contracts have gone through the review and approval process.
026 Master Mechanical Corp. 2 - HVAC 3/25/26 Does the exterior natural gas piping get primed and painted? HVAC Brian Toevs
Yes, all the exterior gas piping shall be primed and painted yellow. This shall include all exterior unpainted existing piping and all new exterior piping. The existing piping to be painted is approximately 40 feet of 2" black steel pipe. The existing pipe shall be cleaned of loose rust prior to painting.
027 Master Mechanical Corp. 2 - HVAC 3/25/26 Will chemical cleaning of the hot water heating system and water treatment services be required for this project?
HVAC Brian Toevs Refer to Addendum Attachment for Boiler system Cleaning Guidance. 4
028 Master Mechanical Corp. 2 - HVAC 3/25/26 Per spec section 232116 2.4, will stainless steel flexible connectors be required for the VAV’s and RCP’s?
HVAC Brian Toevs Yes braided stainless steel flexible connectors will be required as part of the assembly for the VAVs and RCPs
RFI # Submitted By Point Date
Submitted Description Discipline Assigned To Response
Addendum No.
42250134 Lickdale VMOC HVAC ReplacementBID PHASE - REQUEST FOR INFORMATION
029 Master Mechanical Corp. 2 - HVAC 3/25/26 The drawing doesn’t show any space between the 3 trailers. Is a walk way required for the trailers?
General Conditions Keith Lloyd A continuous walkway is not required if the existing grade doesn't allow for it, however each trailer must have ADA accessible access.
030 Master Mechanical Corp. 2 - HVAC 3/25/26 With all three (3) trailers line up, the walk way will be about 160’. With the grade of the parking lot, I don’t believe we would be able to set all the trailers to the exact same height. Is the platform allowed have a step in it?
General Conditions Jason Nye All trailers must have ADA access. Steps will not be permitted. Trailer access may be installed on each trailer in lieu of a universal walk way between all the trailers.
031 Master Mechanical Corp. 2 - HVAC 3/25/26 Will all utilities be marked before we install our tie-downs into the blacktop? General Conditions Keith Lloyd The contractor will be required to complete a PA 1 Call and submit a dig permit request through Division of Installation Management 10 Days prior to installing tie-downs.
032 Master Mechanical Corp. 2 - HVAC 3/25/26 Is skirting required? General Conditions Jason Nye Skirting is required for security purposes. 4
033 Master Mechanical Corp. 2 - HVAC 3/25/26 What are the hours of operation for the toilet trailer? ( 5 days a week, 8- 10 hrs days?)
General Conditions Jason Nye Monday thru Friday. 0700 - 1700 4
034 Master Mechanical Corp. 2 - HVAC 3/25/26 Is there a bid bond required for this project? If so, what amount? General Conditions Tina Rebuck
Please understand a bid bond is not required at bid submission time. The Department will, however, ask the awarded contractor(s) for a bond when we know who the awarded contactor(s) for the project are (bonds for the faithful performance of the contract and for payment of labor and material, as required by the Department).
035 Master Mechanical Corp. 2 - HVAC 3/26/26
For the hvac prime contractor there are three base bids. Base bid #3, is to remove the existing chiller. The plans show basebid 1 and basebid 2, but not basebid 3 plans. The prime EC bid form does not show a basebid #3, might not get power disconnected on chiller equipment. Can plans or clarifications be provided for the scope of work for the hvac prime for BB#3, such as will the chiller piping ,indoor chiller, outdoor unit be removed under the BB#3 or under BB#2 as plans show?
HVAC Brian Toevs The chiller pumps shall be electrically disconnected as part of Electrical Base Bid #1. Refer to revised Mechanical Sheet M2.2 for clarification on the the mechanical Base Bids #2 and #3.
036 Tri Vet Contracting Co., Inc. 4 - Electrical 3/26/26 Can you confirm you want new battery backup emergency light fixtures and not new fixtures that utilize the building backup generator?
Electrical Dennis Healey
All lights in the building are to be removed and stored for the ceiling work and re-installed after the ceiling work with the exception of the multi-purpose room. The multi-purpose room will have new lighting fixtures installed. The circuits shall remain the same. The new fixtures indicated in the multi-purpose room, with battery pack, do not need to be on the Emergency Generator
037 Tri Vet Contracting Co., Inc. 4 - Electrical 3/26/26 At the site visit we were unable to get into the East Wing mechanical and electrical rooms, can we schedule another brief site walk through to gain our subcontractor access?
Electrical Dennis Healey The next walk-through is scheduled for 01APR 2026, at 1200. 3
038 Tri Vet Contracting Co., Inc. 4 - Electrical 3/26/26 Who is manufacturer of Main Distribution Panel? Electrical Dennis Healey Square D 4
039 Tri Vet Contracting Co., Inc. 4 - Electrical 3/26/26 What is the electrical service rating coming into the building? Electrical Dennis Healey 1600A, 208/120V, 3 PH, 4W 4
040 Master Mechanical Corp. 4 - Electrical 3/26/26 Please confirm the .4 EC will furnish and install temporary power for the trailers and then disconnect when done as listed in summary of work and owner will pay for the power.
Electrical Dennis Healey Yes. Please see note 5 on E.2.2. 4
041 Master Mechanical Corp. 2 - HVAC 3/26/26
With four (04) new RTU being installed , will new steel supports be required under the curbs on the existing steel bar joists? If so, will details be produced and which prime contractor would be required to furnish and install them? Would the new steel support design need to stamped by an engineer in PA?
HVAC Brian Toevs
The roof curbs designed for these RTUs are structural curbs that will span the width of the corridor. The only miscellaneous materials will be dunnage necessary to fill between the top of the block corridor walls and the building framing above the wall, to allow for continuous support.
042 Master Mechanical Corp. 2 - HVAC 3/26/26 With four (04) new RTU being installed with supply and rerun air duct detectors, would these have to be tied into the fire alarm system? Which prime contractor would be required to tie it in and have it programmed in the fire alarm system?
HVAC Brian Toevs
Yes the duct detectors shall be tied into the existing fire alarm system. The Point 2 Mechanical contractor shall install the duct detectors. The Point 4 Electrical contractor shall extend the communication wiring from the detectors to the existing fire alarm panel. The DMVA Fire Alarm contractor shall terminate the wiring and program the detectors as needed.
043 Tri Vet Contracting Co., Inc. 4 - Electrical 3/27/26 Can you please clarify the purpose of the 150kVA transformer shown on drawing E2.1?
Electrical Dennis Healey The transformer is for the purpose of avoiding a voltage drop at the new air handlers.
044 WC Eshenaur and Son, Inc. 2 - HVAC 3/27/26 Will a crane be able to use the lot (playground) in the back of the building? HVAC Keith Lloyd YES - avoiding setup over exg. utiltiies 4
RFI # Submitted By Point Date
Submitted Description Discipline Assigned To Response
Addendum No.
42250134 Lickdale VMOC HVAC ReplacementBID PHASE - REQUEST FOR INFORMATION
045 Master Mechanical Corp. 2 - HVAC 3/30/26 Please confirm what the percentages are per contract for SDB/VBE? Procurement Tina Rebuck This information is located on the project itself in eMarketplace and also per Addendum #2.
046 Master Mechanical Corp. 2 - HVAC 3/30/26 In the bidding portal there is only (1) spot to enter pricing, however, there are multiple base bids per contract. Please advise how we are to enter each price in the portal.
Procurement Tina Rebuck Please use the bid proposal forms that are located within the contract documents to be returned in eMarketplace.
047 Tri Vet Contracting Co., Inc. 2 - HVAC 4/1/26 Is it possible to extend the bid period by a few days? Procurement Tina Rebuck The Department via Addendum, will announce extending Solicitation End Date to 04/10/2026, instead of 04/08/2026.
048 Tri Vet Contracting Co., Inc. 2 - HVAC 4/1/26 Can ceiling tile grid system and/or the ceiling tiles remain in the two data rooms to avoid the data infrastructure that runs near the ceilings?
General Const. Jason Nye Ceilings cannot stay in place due to HVAC work being done above the ceiling. 4
049 Tri Vet Contracting Co., Inc. 2 - HVAC 4/1/26 Can ceiling tile system perimeter wall angle be allowed to remain to avoid peeling the paint and spalling the cmu walls? We would paint the reused wall tracking with manufacturer paint to match new system.
General Const. Jason Nye Ceiling wall angle is to be removed. Contractor shall be responsible for paint touch-up in areas where the removing of the wall angle results in paint peeling.
050 Tri Vet Contracting Co., Inc. 2 - HVAC 4/1/26 Is lead contractor responsible for the final cleanup? Scope of work points to all primes but how are we to delineate which contactor is to do final cleaning in which area when all three have work there.
General Const. Mark Griffin
Per Division 01, Section 010400, Coordination and Control, Paragraph 1.6A, establishes the HVAC (.2) Contractor as the Lead Contractor and shall be responsible for coordination between all contracts. With respect to 'Final Cleanup', The Lead Contractor will coordinate and establish an appropriate plan with the Point One and Point Four contractors so to comply with this contract requirement.
051 DMVA-BDPM 2 - HVAC 4/1/26
Every classroom unit ventilator has an outside air grille , and motorized damper in the outside wall.
Mechanical Brian Toevs The Point 2 contractor shall remove the exterior grille, disconnect and remove the outsice air damper assembly. The contractor shall install an R19 insulated panel in the opening, sealed air tight, and reinstall the grille as original.
052 DMVA-BDPM 2 - HVAC 4/1/26
There are eight (8) relief air hoods on the roof with back draft dampers in the neck.
The roof curbs are approxomately 42" x 42".
Mechanical Brian Toevs The Point 2 contractor shall remove the the roof hoods and cap the roof curb openings weather tight. The contractor shall install an R30 insulated panel in the opening and seal it air tight.
053 DMVA-BDPM 2 - HVAC 4/1/26 The boiler expansion tank requires replacing as part of Base Bis #2 Mechanical Brian Toevs The expansion tank basis of design shall be Amtrol AX-240 - 24" dia x 72" high.
Tank volume - 131.7 gallons - acceptance volume - 44.4 gallons Flooded weight - 1500 lbs.
Solicitation/Bid Number: 6100065581 Project: 42250134 Lickdale Renovation – Phase 2
Existing Boiler system Cleaning
Note: The following is general guidance for chemically cleaning and flushing the boiler system prior to disassembly and after the new system is put into operation. The final cleaning process and procedures and actual chemicals to be utilized will be determined based on the water chemistry and existing conditions as identified by the contractor during construction.
Clean and flush the existing boiler system while it is still completely in tack and operational with the original boilers and pumps.
Safety Precautions: Carefully read the labels and Safety Data Sheets (SDS) on all treatment products involved before starting any cleaning procedure. Follow all safety precautions when handling these products and wear appropriate protective gear. Permanent or temporary eye wash station and/or safety shower with a supply of potable water shall be close at hand and tested for proper operation.
1. WARNING: Identify and bypass any equipment containing aluminum, galvanized steel, or any other metallurgy that is not compatible with alkaline cleaning solutions to avoid permanent damage.
2. Configure control valves to ensure all system piping and equipment to be cleaned receives good circulation during cleaning, flushing, and corrosion inhibitor additions.
3. Before disconnecting and removing any boilers or pumps, add 2.5 gallons CHEM-AQUA 61503 (alkaline cleaner) (or approved equal) per 1,000 gallons system volume. If system is identified to have heavy oil or dirt contamination, add 5 gallons CHEM-AQUA 61503 (or approved equal) per 1,000 gallons. For passivation, CHEM-AQUA 655T (phosphate) (or Approved Equal) can be added at 1 to 2 quarts per 1,000 gallons. Do not mix concentrated chemicals in the bypass feeder.
4. Heavy foaming may occur based on dosage, system design, and operating conditions. Add an antifoam such as FC 101 at 4-16 fluid ounces per 1,000 gallons system volume as necessary or with the other chemicals.
5. Circulate cleaning solution through all piping and equipment to be cleaned for minimum 24 hours. Extended circulation times up to 72 hours may be acceptable. Water temperature should be monitored to ensure system design temperatures are not exceeded.
6. When the cleaning step is complete, drain the system, refill with fresh water, and circulate to ensure good mixing. Then initiate a heavy bleed to flush the system until the water is clear and free of foam or repeatedly drain and refill the system until the water is clear. When flushing is complete, the conductivity of the system water should be approximately equal to the makeup water. Avoid long flushing times (days) which can result in flash corrosion and red water problems. If extended flushing times are required, the addition of CHEM-AQUA 655T (or approved equal) at 1 to 2 pints per 1000 gallons prior to flushing to reduce the potential for red water problems.
Final Boiler System Cleaning (After construction and before operation)
1. Follow all manufacturer requirements on the cleaning procedure chemicals, time, and use of system recirculating pumps. Configure control valves and balancing valves to ensure all system piping and equipment to be cleaned receives good circulation during cleaning, flushing, and corrosion inhibitor additions.
2. Open the high point vent(s) and fill the system completely with clean water. Circulate with all primary and secondary pumps running. Maintain a minimum flow velocity of 3 ft./sec through all piping and equipment to be cleaned. Periodically flush low point drains, strainers, expansion tanks, air/sediment separators, control valves, etc. while circulating to help remove any debris that has been dislodged.
3. If the system water is dirty, flush with circulation until the water is clear.
4. WARNING: Identify and bypass any equipment containing aluminum, galvanized steel, or any other metallurgy that is not compatible with alkaline cleaning solutions to avoid permanent damage.
5. Add 2.5 gallons CHEM-AQUA 61503 (alkaline cleaner) (or approved equal) per 1,000 gallons system volume. For systems with heavy oil or dirt contamination, add 5 gallons CHEM-AQUA 61503 (or approved equal) per 1,000 gallons. For passivation, CHEM-AQUA 655T (phosphate) (or Approved Equal) can be added at 1 to 2 quarts per 1,000 gallons. Do not mix concentrated chemicals in the bypass feeder.
6. Heavy foaming may occur based on dosage, system design, and operating conditions. Add an antifoam such as FC 101 at 4-16 fluid ounces per 1,000 gallons system volume as necessary or with the other chemicals.
7. Circulate cleaning solution through all piping and equipment to be cleaned for minimum 24 hours. Extended circulation times up to 72 hours may be acceptable. Water temperature should be monitored to ensure system design temperatures are not exceeded.
8. When the cleaning step is complete, drain the system, refill with fresh water, and circulate to ensure good mixing. Then initiate a heavy bleed to flush the system until the water is clear and free of foam or repeatedly drain and refill the system until the water is clear. When flushing is complete, the conductivity of the system water should be approximately equal to the makeup water. Avoid long flushing times (days) which can result in flash corrosion and red water problems. If extended flushing times are required, the addition of CHEM-AQUA 655T (or approved equal) at 1 to 2 pints per 1000 gallons prior to flushing to reduce the potential for red water problems.
CHILLER DEMOLITION NOTES
P-1
P-2
ET-1
B-1
BOILER DEMOLITION NOTES
BOILER ROOM DEMOLITION - BASE BID #3
SCALE: 1/4" = 1'-0"
BOILER ROOM NEW CONSTRUCTION - BASE BID #2
SCALE: 1/4" = 1'-0"
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
REVISIONS
DESCRIPTION DATENO.
Professional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERAN'S AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO.:
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
42250134
HVAC REPLACEMENT
LICKDALE VMOC
40 FISHER AVENUE
JONESTOWN, LEBANON CO., PENNSYLVANIA 17038
MECHANICAL LARGE SCALE
PLANS
B. TOEVS 17 FEB. 2026
B. TOEVS AS NOTED
M2.2
NO
RT
H
BOILER ROOM DEMOLITION - BASE BID #2
SCALE: 1/4" = 1'-0"
1 REVISED BASE BIDS #2 AND #3 3/27/2026
AutoCAD SHX Text
AutoCAD SHX Text REMOVE AND DISCARD ALL EXISTING CHILLED WATER PIPING, PUMPS, AIR SEPARATOR, EXPANSION TANK, SHOT FEEDER, HANGERS AND SUPPORTS. REMOVE AND DISCARD CHILLER EVAPORATOR, REMOTE CONDENSER, AND ALL ASSOCIATED PIPING AND APPURTENANCES. PROPERLY EVACUATE CHILLER REFRIGERANT PRIOR TO DEMOLITION.
AutoCAD SHX Text
AutoCAD SHX Text RECONNECT SUPPLY AND RETURN PIPING TO EXISTING PIPING. RECONNECT NEW BOILER TO EXISTING FLUE STACK.
AutoCAD SHX Text
AutoCAD SHX Text REMOVE AND DISCARD ONE (1) EXISTING BOILER. THE OTHER (NEWER) BOILER SHALL REMAIN IN PLACE AND IN OPERATIONAL CONDITION. DISCONNECT PIPING AND FLUE STACK AT THE BOILER AND PREPARE PIPING AND STACK FOR RECONNECTION TO NEW BOILER. REMOVE AND DISCARD BOILER PUMPS, VALVES FITTINGS AT THE PUMPS AND PREPARE PIPING FOR RECONNECTION TO NEW PUMPS. REMOVE AND DISCARD HEATING SYSTEM EXPANSION TANK. PREPARE PIPING AND EXISTING HANGERS FOR NEW EXPANSION TANK.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR 101
M
AT
C H
L
IN
E M
AT
C
H L
IN
E
1 11
111 1
2 2
2 2
2 2
2 2 2
THE CONTRACTOR SHALL REMOVE ALL LIGHTING FIXTURES AND CEILING MOUNTED
EQUIPMENT IN THIS AREA. THIS INCLUDES, BUT IS NOT LIMITED TO, LIGHTING FIXTURES,
SPEAKERS, IT CONNECTION POINTS (WIFI), AND OCCUPANCY SENSORS. THE CIRCUITS
SHALL REMAIN IN PLACE AND BE RE-USED WHEN THE NEW FIXTURES ARE INSTALLED. ALL
DEVICES SHALL OPERATE AS THEY DID BEFORE THE DEMOLITION. SEE DRAWING E.1.2
FOR NEW INSTALLATION AND DRAWING E.1.1 FOR THE FIXTURE SCHEDULE.
THE CONTRACTOR SHALL STORE ALL CEILING MOUNTED EQUIPMENT IN THIS AREA. THIS
INCLUDES, BUT IS NOT LIMITED TO, SPEAKERS, IT CONNECTION POINTS (WIFI), AND
OCCUPANCY SENSORS. THE CIRCUITS SHALL REMAIN IN PLACE AND BE RE-USED WHEN
THE NEW FIXTURES ARE INSTALLED. ALL DEVICES SHALL OPERATE AS THEY DID BEFORE
THE DEMOLITION.
THE LIGHTING FIXTURES REMOVED IN THIS AREA ARE TO BE REMOVED FROM THE SITE
PER FORT INDIANTOWN GAP PROCEDURES.
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
DESCRIPTION
Professional's Signature DateProfessional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
DATENO.
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY AND VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
DMVA PROJECT NO.:
REVISIONS
42250134
HVAC REPLACEMENT
V.M.O.C
40 FISCHER AVENUE
JONESTOWN, LEBANON COUNTY, PENNSYLVANIA
WEST LIGHTING
DEMOLITION
D. HEALEY 24 Feb 2026
B. BARGER AS NOTED
E.0.2
WEST WING AND CORRIDOR LIGHTING DEMOLITION
SCALE: 1/8" = 1'-0"
23FEB2026
1 REVISION BASED ON RFI - ADDENDUM #4 03 APR 2026
AT
C H
L
IN
E M
AT
C
H L
IN
E
UVUVUV
UVUVUVUV
UV
UV
UV
UV
FC
CHILLER
AHU2
DISCONNECT
SWITCH
CONDENSING UNIT
PUMPS
THE CONTRACTOR SHALL DISCONNECT THE POWER TO THE EXISTING UNIT VENTILATORS
AND REMOVE THE CIRCUIT BACK TO THE SOURCE PANEL. THE BREAKER PANEL
SCHEDULE SHALL BE UPDATED TO INDICATE THE BREAKER AS SPARE.
POWER TO THE EXISTING AIR HANDLER SHALL BE DISCONNECTED AND REMOVED BACK
TO THE SOURCE PANEL. THE BREAKER PANEL SCHEDULE SHALL BE UPDATED TO
INDICATE THE BREAKER AS SPARE.
POWER TO THE EXISTING FAN COIL SHALL BE DISCONNECTED AND REMOVED BACK TO
THE SOURCE PANEL. THE BREAKER PANEL SCHEDULE SHALL BE UPDATED TO INDICATE
THE BREAKER AS SPARE.
POWER TO THE EXISTING CHILLER SHALL BE DISCONNECTED AND REMOVED BACK TO
THE LOCAL DISCONNECT SWITCH. AT THE END OF THE PROJECT, WHEN THE TRAILERS
ARE REMOVED, THE DISCONNECT SHALL BE REMOVED AND THE CONDUCTORS SHALL BE
REMOVED BACK TO THE MAIN SWITCHBOARD,THE BREAKER PANEL SCHEDULE SHALL BE
UPDATED TO INDICATE THE BREAKER AS SPARE. THE BREAKER SHALL REMAIN IN PLACE.
THE EXISTING CHILLER DISCONNECT SWITCH SHALL BE REMOVED AT THE END OF THE
CONTRACT, AFTER THE REMOVAL OF THE TEMPORARY TRAILERS. THE CONDUITS
PENETRATING THE WALL TO THE DISCONNECT SWITCH SHALL BE CUT BACK TO AN AREA
INSIDE THE BUILDING, CAPPED AND LEFT IN PLACE. THE WALL PENETRATIONS SHALL BE
SEALED IN AN APPROPRIATE MANOR.
THE CONTRACTOR SHALL DISCONNECT THE POWER TO THE EXISTING CONDENSING UNIT
PUMPS AND REMOVE THE CIRCUITS BACK TO THE SOURCE PANEL(PANEL "P"). THE
BREAKER PANEL SCHEDULE SHALL BE UPDATED TO INDICATE THE BREAKERS AS SPARE.
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
DESCRIPTION
Professional's Signature DateProfessional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
DATENO.
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY AND VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
DMVA PROJECT NO.:
REVISIONS
42250134
HVAC REPLACEMENT
V.M.O.C.
40 FISCHER AVENUE
JONESTOWN, LEBANON COUNTY, PENNSYLVANIA
WEST ELECTRICAL
EQUIPMENT DEMOLITION
D. HEALEY 24 Feb 2026
B. BARGER AS NOTED
E.0.4
WEST WING AND CORRIDOR CIRCUIT DEMOLITION
SCALE: 1/8" = 1'-0"
23FEB2026
1 REVISION BASED ON RFI - ADDENDUM #4 03 APR 2026
SOFFIT
SOFFIT
CONF. ROOM 145
REINTEGRATION &
OUTREACH/VSO'S
STORAGE
144b
144a
OFFICEOFFICE
141142
OPERATIONS &
INITIATIVES
BUREAU
DIRECTOR
139a
OFFICE
140a140b
STORAGE IT
137 134
MECH.
ELEC.
BUREAU
DIRECTOR
DIV. OF PROGRAM SVCS.
DIV. OF PROGRAM SVCS.
135a
135b
136a
HOTELING
CORRIDOR 101
OFFICE
M
AT
C H
L
IN
E M
AT
C
H L
IN
E
2 2
THE CONTRACTOR SHALL RE-INSTALL THE LIGHTING FIXTURES PREVIOUSLY REMOVED
FROM THIS AREA. THE FIXTURES SHALL BE PLACED IN THEIR PREVIOUS POSITIONS,
PAYING ATTENTION TO EMERGENCY FIXTURE LOCATIONS. THE ORIGINAL CIRCUITS AND
CONTROLS SHALL BE RE-USED TO ENSURE OPERATION MATCHING THAT OF BEFORE
DEMOLITION. LIGHTING FIXTURE TYPES ARE FOR REFERENCE ONLY.
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
DESCRIPTION
Professional's Signature DateProfessional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
DATENO.
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY AND VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
DMVA PROJECT NO.:
REVISIONS
42250134
HVAC REPLACEMENT
V.M.O.C
40 FISCHER AVENUE
JONESTOWN, LEBANON COUNTY, PENNSYLVANIA
EAST LIGHTING PLAN
D. HEALEY 24 Feb 2026
B. BARGER AS NOTED
E.1.1
EAST WING AND CORRIDOR LIGHTING
SCALE: 1/8" = 1'-0"
23FEB2026
1 REVISION BASED ON RFI - ADDENDUM #4 03 APR 2026
AutoCAD SHX Text B1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B1
AutoCAD SHX Text B1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B1
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text B
AutoCAD SHX Text B1
AutoCAD SHX Text B1
AutoCAD SHX Text B1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G1
AutoCAD SHX Text G
AutoCAD SHX Text G1
AutoCAD SHX Text G1
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G1
AutoCAD SHX Text G1
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G1
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C1
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text B1
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text B1
AutoCAD SHX Text B1
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
LAMPS
AutoCAD SHX Text
LIGHTING FIXTURE SCHEDULE
AutoCAD SHX Text I.D.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CAT. NO.
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MTG.
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
BASIS OF DESIGN
AutoCAD SHX Text
ALTERNATE
AutoCAD SHX Text
ALTERNATE
AutoCAD SHX Text
LED EXIT
AutoCAD SHX Text
DUAL LITE
AutoCAD SHX Text
EVEURWEI
AutoCAD SHX Text
LED
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
SURELITES
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text 1.
AutoCAD SHX Text PROVIDE EMERGENCY BATTERY PACK. WIRE TO HOT LEG OF LOCAL LIGHTING CIRCUIT IN THE AREA IN WHICH IT SERVES. THE AREA MUST BE ON THE SAME CIRCUIT.
AutoCAD SHX Text
%%UNOTE%%U:
AutoCAD SHX Text
EMERGENCY LIGHTING UNIT
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
SURELITES
AutoCAD SHX Text
DUALLITE
AutoCAD SHX Text
CVEC50N-12V-I-0
AutoCAD SHX Text
NOTE 7
AutoCAD SHX Text B
AutoCAD SHX Text 2.
AutoCAD SHX Text A
AutoCAD SHX Text 3.
AutoCAD SHX Text 4.
AutoCAD SHX Text G
AutoCAD SHX Text
LED WALL BRACKET
AutoCAD SHX Text
AXCS6ARL-PC1
AutoCAD SHX Text
LED ARRAY
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text G1
AutoCAD SHX Text
LED NORM/EM WALL BRACKET
AutoCAD SHX Text
AXCS6ARL-PC1-CBP
AutoCAD SHX Text
LED ARRAY
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
LUMARK
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
LUMARK
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
HUBBELL
AutoCAD SHX Text
XX
AutoCAD SHX Text 5.
AutoCAD SHX Text
XX
AutoCAD SHX Text
WATT
AutoCAD SHX Text 50W
AutoCAD SHX Text 50W
AutoCAD SHX Text 2.1W
AutoCAD SHX Text 13W
AutoCAD SHX Text B1
AutoCAD SHX Text
XX
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text C
AutoCAD SHX Text
XX
AutoCAD SHX Text 6.
AutoCAD SHX Text
XX
AutoCAD SHX Text H
AutoCAD SHX Text 7.
AutoCAD SHX Text
NOT USED THIS PROJECT
AutoCAD SHX Text H1
AutoCAD SHX Text A1
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text C1
AutoCAD SHX Text D1
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text
NOTE 7
AutoCAD SHX Text
CWM2-40MWSM-FRWA-EU-ELL14
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text 21W
AutoCAD SHX Text
2' WALLMOUNT LED
AutoCAD SHX Text
2430 L LED
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text
CWM2-40MWSM-FRWA-EU
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text D
AutoCAD SHX Text 21W
AutoCAD SHX Text
2' WALLMOUNT LED
AutoCAD SHX Text
2430 L LED
AutoCAD SHX Text 2'x4' LED ZERO PLENUM
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LZPT24-40VWG-LSRS-EDU
AutoCAD SHX Text
3500 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text 33W
AutoCAD SHX Text 2'x4' LED ZERO PLENUM
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text 2'x4' LED ZERO PLENUM
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LZPT24-40LWG-LSRS-EDU
AutoCAD SHX Text
4500 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text 43W
AutoCAD SHX Text
LZPT24-40LWG-LSRS-EDU-ELL14
AutoCAD SHX Text
4500 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text 43W
AutoCAD SHX Text 2'x4' LED ZERO PLENUM
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LZPT24-40VWG-LSRS-EDU-ELL14
AutoCAD SHX Text
3500 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text 33W
AutoCAD SHX Text 2'x2' LED ZERO PLENUM
AutoCAD SHX Text
LZPT22-40VWG-LSRS-EDU-ELL14
AutoCAD SHX Text
2000 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text 18W
AutoCAD SHX Text 2'x2' LED ZERO PLENUM
AutoCAD SHX Text
LZPT22-40VWG-LSRS-EDU
AutoCAD SHX Text
2000 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text 18W
AutoCAD SHX Text 2'x4' LED ZERO PLENUM
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LZPT24-40XWG-LSRS-EDU
AutoCAD SHX Text
3500 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text 33W
AutoCAD SHX Text 2'x4' LED ZERO PLENUM
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
LZPT24-40XWG-LSRS-EDU-ELL14
AutoCAD SHX Text
3500 L LED
AutoCAD SHX Text
RECESSED
AutoCAD SHX Text
LITHONIA
AutoCAD SHX Text
COOPER
AutoCAD SHX Text 33W
NOTE 7
CORRIDOR 101
AT
C H
L
IN
E M
AT
C
H L
IN
E
2 2 2 2
2 2
THE CONTRACTOR SHALL INSTALL THE LIGHTING FIXTURES IN THIS AREA AS INDICATED.
THE ORIGINAL CIRCUITS AND CONTROLS SHALL BE RE-USED TO ENSURE OPERATION
MATCHING THAT OF BEFORE DEMOLITION. SEE DRAWING E.1.1 FOR THE FIXTURE
SCHEDULE.
THE CONTRACTOR SHALL RE-INSTALL ALL CEILING MOUNTED EQUIPMENT IN THIS AREA.
THIS INCLUDES, BUT IS NOT LIMITED TO, LIGHTING FIXTURES, SPEAKERS, IT CONNECTION
POINTS (WIFI), AND OCCUPANCY SENSORS. THE CIRCUITS SHALL REMAIN IN PLACE AND
BE RE-USED WHEN THE FIXTURES ARE RE-INSTALLED. ALL DEVICES SHALL OPERATE AS
THEY DID BEFORE THE DEMOLITION.
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
DESCRIPTION
Professional's Signature DateProfessional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD, FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
DATENO.
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY AND VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
DMVA PROJECT NO.:
REVISIONS
42250134
HVAC REPLACEMENT
V.M.O.C
40 FISCHER AVENUE
JONESTOWN, LEBANON COUNTY, PENNSYLVANIA
WEST LIGHTING PLAN
D. HEALEY 24 Feb 2026
B. BARGER AS NOTED
E.1.2
WEST WING AND CORRIDOR LIGHTING
SCALE: 1/8" = 1'-0"
23FEB2026
1 REVISION BASED ON RFI - ADDENDUM #4 03 APR 2026
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text A1
A1
| RFI Tracker |
| 42250134_M&P-M2.2-Revised.pdf |
| Sheets and Views |
| M2.2 |
| 42250134_E.0.2.LTG DEMO R1.pdf |
| Sheets and Views |
| DEMO LTG E.0.2 |
| 42250134_E.0.4.EQUIP DEMO R1.pdf |
| Sheets and Views |
| DEMO ELEC EQUIP E.0.4 |
| 42250134_E.1.1 EAST LTG R1.pdf |
| Sheets and Views |
| LIGHTING E.1.1 |
| 42250134_E.1.2 WEST LTG R1.pdf |
| Sheets and Views |
| LIGHTING E.1.2 |
File details come from the government source that posted it. Updated .