About this file

This is a Schedule C Cost Proposal Form for a design-build project submitted by Lake Mountain School District in Utah for the renovation of a centralized administrative office facility. The project involves turnkey design, permitting, procurement, and construction services for a 14,696-square-foot commercial office building that will be transformed from four separate tenant suites into a single unified administrative headquarters. A mandatory pre-bid conference is scheduled for June 11, 2026, at 10:00 A.M. MST at 1307 North Commerce Drive, Saratoga Springs, Utah 84045, with bidders required to arrive early or on time as the walk-through will close promptly at the listed time. The RFP closing date is Monday, June 22, 2026, at 2:00 PM Mountain Time, with construction anticipated to commence on September 15, 2026, and substantial completion targeted for April 15, 2027. The contract award will be made to the responsive and responsible offeror with the highest score as justified by the procurement code.

The Schedule C form requests a fixed design-build Guaranteed Maximum Price (GMP) with line items for pre-construction services (schematic design, MEP engineering, permits, and stamped plans), five construction phases covering interior demolition and structural preparation, global finish scheduling, centralized MEP utility integration, roof replacement and perimeter upgrades, and parking lot improvements, plus construction overhead, general conditions, bonds, and contingency. Bidders must provide their total turnkey design-build maximum price in both numerical and written formats, with the written amount governing in case of discrepancy. The form requires authorized signature and date from the bidder's representative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule “C”

Turnkey Cost & Value Pricing

Project Component / Phase Fixed Design & Construction Cost

Pre-Construction (Schematic Design, MEP Engineering, Permits & Stamped Plans)

Phase I: Interior Targeted Demo, Structural Prep & Clean Up

Phase II: Global Finish Schedule (100% Building Carpet, LVT, Painting)

Phase III: Centralized MEP Utility Integration (HVAC, Panels, Low-Voltage, Plumbing)

Phase IV: R-30 TPO Roof Replacement & Perimeter Upgrades

Phase V: Parking Lot Overlay, Civil Grading, Striping & LED Poles

Construction Overhead, General Conditions, Bonds, and Contingency

TOTAL TURNKEY DESIGN-BUILD MAX PRICE (GMP) $

Total Dollars (GMP Written): $ (In case of discrepancy, written amount shall govern)

Authorized Signature: Date______________