4-RFP C26-05 - DRAWINGS - Restroom Office Building - Compiled DD 100%.pdf
DoD Form PDF 14 MB Posted
- Attached to
- CMR Services for Gamble Road Projects
- Solicitation number
- RFP C26-05 (ESPLOST)
- Issued by
- Chatham County, Georgia
About this file
This document is a comprehensive set of architectural and engineering design drawings for a Savannah, Georgia school district project (Savannah-Chatham Public School System) involving the construction of a new restroom and office building located at 2219 Gamble Road. The design package, prepared by Goodwyn Mills Cawood LLC, includes detailed plans spanning multiple disciplines such as architectural, structural, mechanical, plumbing, and electrical systems for a two-story facility with approximately 6,880 gross square feet. The drawings are dated July 31, 2025, with design development progress sets and reflect a Type II-B fully sprinklered construction classification with a maximum building height of 88 feet.
The project appears to be funded through the school district, with an estimated construction budget of approximately $20,000,000. The building is designed to meet 2018 International Building Code standards and incorporates accessibility requirements, energy efficiency considerations, and sustainable design elements. The facility will include spaces such as offices, restrooms, a conference room, break rooms, mechanical rooms, and an elevator. The design emphasizes code compliance, with specific attention to fire safety, electrical systems, mechanical ventilation, and plumbing infrastructure. The drawings indicate careful coordination between architectural, structural, and building systems to ensure a comprehensive and functional design that meets current building standards and the district's operational needs.
View the file
Other versions and copies of DD Form 100
Who attaches DD Form 100
| Agency | Files |
|---|---|
| Defense Logistics Agency | 3 |
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ba rn ar d
St . S ui te
B
T
.2
.16
G
M C
N E
T W
O R
K . C
O M
G M
C N
E T
W O
R K
. C O
M
Sa va nn ah
, G A
G oo dw yn
M ill s C aw oo d, L
LC
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D
RA
W N
B Y
IS
SU
E
C H
EC
K
ED
B
Y
D A
TE
G M
C
8/
/2
5:
:4
PM
TI
TL
E
SH
EE
T
G A
M
BL
E
RO
A D
, S A
V A
N N
A H
, G A
TE
M
PL
A
TE
V
ER
SI
O N
: 2
2.
T1
PH A
M
/3
1/
D
D P
RO
G
RE
SS
S
ET
SC
C
PS
S
RE
ST
RO
O
M S
A N
D O
FF
IC
E
BU
IL
D
IN
G
[A
SA
V
A G
EN
C
Y
[0
A G
EN
C
Y
[0
SCCPSS / 2219 GAMBLE ROAD, SAVANNAH, GA 31405 DESIGN DEVELOPMENT
GOODWYN MILLS CAWOOD, LLC ARCHITECTURE, INTERIORS, CIVIL, LANDSCAPE
STRUCTURAL ENGINEERING
MECHANICAL, PLUMBING, & ELECTRICAL ENGINEERING
THARPE ENGINEERING
METHOD ENGINEERING GROUP
SCCPSS RESTROOMS AND OFFICE BUILDING
SD
P
RO
G
RE
SS
S
ET
/3 0/
SD
P
RO
G
RE
SS
S
ET
/0 8/
SD
0%
/3
1/
Ba rn ar d
St . S ui te
B
T
.2
.16
G
M C
N E
T W
O R
K . C
O M
G M
C N
E T
W O
R K
. C O
M
Sa va nn ah
, G A
G oo dw yn
M ill s C aw oo d, L
LC
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D
RA
W N
B Y
IS
SU
E
C H
EC
K
ED
B
Y
D A
TE
G M
C
8/
/2
9:
:13
A M
D
RA
W
IN
G
IN
D
EX
G A
M
BL
E
RO
A D
, S A
V A
N N
A H
, G A
TE
M
PL
A
TE
V
ER
SI
O N
: 2
2.
G 1.0
A ut ho r C he ck er
/3
1/
D
D P
RO
G
RE
SS
S
ET
SC
C
PS
S
RE
ST
RO
O
M S
A N
D O
FF
IC
E
BU
IL
D
IN
G
[A
SA
V
A G
EN
C
Y
[0
A G
EN
C
Y
[0
DRAWING INDEX
DWG.
NO. DRAWING NAME
ORIG.
DATE
ORIGINAL ISSUE
NAME
REV.
DATE
CURRENT REVISION
NAME
0.0 GENERAL
T1 TITLE SHEET 07/31/2025 DD PROGRESS SET 07/31/2025 SD 100%
G1.01 DRAWING INDEX 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G1.02 GENERAL NOTES 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G1.03 GENERAL INFORMATION & MOCKUP WALL 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G1.11 ACCESSIBILITY DATA 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G1.12 ACCESSIBLE PLUMBING LAYOUTS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G1.21 PARTITION TYPES 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G1.31 PENETRATION FIRESTOPPING SYSTEMS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
G2.00 LIFE SAFETY - CODE ANALYSIS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
G2.01 LIFE SAFETY PLAN - LEVEL 1 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
G2.02 LIFE SAFETY PLAN - LEVEL 2 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
1.0 CIVIL
C-100 MASTER SITE PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
C-101 SITE PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
C-201 GRADING PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
C-301 UTILITY PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
3.0 ARCHITECTURE
A1.01 FLOOR PLAN - LEVEL 1 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A1.02 FLOOR PLAN - LEVEL 2 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A2.01 REFLECTED CEILING PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A3.01 ROOF PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A4.01 EXTERIOR ELEVATIONS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A4.02 EXTERIOR ELEVATIONS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A5.01 BUILDING SECTIONS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
A5.02 BUILDING SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
A5.11 WALL SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
A5.12 WALL SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
A5.31 VERTICAL CIRCULATION 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
A5.32 VERTICAL CIRCULATION 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
A6.01 DOOR SCHEDULE, LEGEND, & NOTES 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
4.0 STRUCTURAL
S0.01 GENERAL NOTES, SHEET LIST & LEGEND 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S0.02 GENERAL NOTES 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S1.01 FOUNDATION PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
S1.02 LEVEL 2 FRAMING PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
S1.03 ROOF FRAMING PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
S2.01 BUILDING ISOMETRIC 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S2.02 BUILDING SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S3.01 FOUNDATION SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S3.02 TYPICAL FOUNDATION SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S4.01 FRAMING SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S4.02 TYPICAL FRAMING SECTIONS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S4.03 TYPICAL FRAMING DETAILS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
S4.04 TYPICAL FRAMING DETAILS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
5.0 MECHANICAL
M0.00 HVAC TITLE SHEET 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
M0.01 HVAC SCHEDULE & SPECIFICATIONS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
M1.01 HVAC PLANS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
M1.09 ROOF HVAC PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
M3.01 HVAC DETAILS 08/15/2025 DD PROGRESS SET 08/15/2025 DD 100%
6.0 PLUMBING
P0.00 PLUMBING TITLE SHEET 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
P0.01 PLUMBING SPECIFICATIONS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
P1.01 WASTE & VENT PLANS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
P2.01 HOT & COLD WATER PLANS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
P3.01 ROOF PLUMBING PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
P4.01 PLUMBING DETAILS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
7.0 ELECTRICAL
E0.00 ELECTRICAL TITLE SHEET 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E1.01 ELECTRICAL SITE PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E2.01 LIGHTING PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E3.01 POWER PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E3.09 ROOF POWER PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E4.01 SYSTEMS PLAN 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E5.01 ELECTRICAL DIAGRAMS & SCHEDULES 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E6.01 ELECTRICAL DETAILS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
E6.02 ELECTRICAL DETAILS 07/31/2025 DD PROGRESS SET 08/15/2025 DD 100%
SD
0%
/3
1/
D D
0%
/1
5/
1.01.1.01. COMPLETE CONTRACT DOCUMENTS:COMPLETE CONTRACT DOCUMENTS: COMPLETE DRAWINGS, SPECIFICATIONS, ADDENDA, AND CLARIFICATIONS ISSUED BY FIELD ORDER OR SIMILAR INSTRUMENTS CONSTITUTE THE CONTRACT DOCUMENTS AND SHALL REMAIN INTACT. GENERAL CONTRACTOR IS FULLY RESPONSIBLE FOR COMPLIANCE WITH THE REQUIREMENTS INCLUDED, OR REASONABLY INFERRED THEREIN. CONSTRUCTION MANAGER OR GENERAL CONTRACTOR (AS APPLICABLE) MUST NOT ISSUE PARTIAL SETS OR OTHERWISE CAUSE INCOMPLETE CONTRACT INFORMATION TO BE PROVIDED TO PARTIES TO THE CONTRACT, INCLUDING ASSOCIATED SUB-CONTRACTORS, OR SUB-SUB-CONTRACTORS.
1.02.1.02. MULTI-TRADE COORDINATION:MULTI-TRADE COORDINATION: ALL WORK SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID INTERFERENCES AND CONFLICTS. NO ALLOWANCES WILL BE MADE FOR CONTRACTOR'S FAILURE TO COORDINATE BETWEEN MULTIPLE DISCIPLINES, SYSTEMS OR EQUIPMENT. UNCOORDINATED WORK THAT RESULTS IN THE INEFFICIENT USE OF AVAILABLE SPACE AND/OR ENCROACHES ON THE WORK OF OTHER TRADES WILL BE SUBJECT
TO REJECTION AND RE-INSTALLATION.
1.03.1.03. VERIFICATION:VERIFICATION: GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, CONSTRUCTION, MATERIALS, METHODS OF CONSTRUCTION, GRADES AND ELEVATIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR CONFLICTS WITHIN THE DOCUMENTS PRIOR TO BID, CONSTRUCTION, AND/OR INSTALLATION OF ASSOCIATED WORK. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE THAT THE EXISTING CONDITIONS ARE CONSISTENT WITH THOSE OF THE CONTRACT DOCUMENTS. ANY CHANGE ORDER REQUEST ASSOCIATED WITH AN IDENTIFIABLE EXISTING CONDITION, WHETHER IN CONFLICT OR COMPLIANCE WITH THE CONTRACT DOCUMENTS, WILL NOT BE ACCEPTED. THIS PROVISION SHALL NOT APPLY TO WORK PERFORMED UNDER UNIT PRICE OR ALLOWANCE FEE
STRUCTURES.
1.04.1.04. DISCREPANCIES: DISCREPANCIES: GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT PROMPTLY UPON IDENTIFICATION OF ANY DISCREPANCIES OR CONFLICTS IN THE CONTRACT DOCUMENTS, WITH THE OBJECTIVE OF RESOLVING THE CONFLICT OR DISCREPANCY IN A TIMELY MANNER AND PRIOR TO ANY IMPACT TO CONTRACT TIME OR CONTRACT COST.
GENERAL CONTRACTOR SHALL INCLUDE THE MORE EXPENSIVE, COMPLEX, AND TIME CONSUMING COMPONENTS OF ANY DISCREPANCIES IN THE BASE BID PRICE. FAILURE TO NOTIFY THE ARCHITECT PROMPTLY OF A KNOWN DISCREPANCY CONSTITUTES ACCEPTANCE OF FULL RESPONSIBILITY FOR THE ASSOCIATED COST AND SCHEDULE IMPACT.
1.05.1.05. DRAWING SCALE: DRAWING SCALE: REPROGRAPHIC TECHNIQUES MAY RENDER DRAWINGS DIFFERENTLY THAN THE INTENDED PRINTED SCALE. THEREFORE, DO NOT RELY UPON THE SCALE OF ANY PRINTED DRAWINGS. CONTACT THE ARCHITECT FOR REQUIRED DIMENSIONS THAT ARE NOT PROVIDED CLEARLY IN NUMERIC FORM HEREIN. FAILURE TO REQUEST CRITICAL DIMENSIONAL INFORMATION FROM THE ARCHITECT MAY RESULT IN THE REJECTION OF INSTALLED WORK.
1.06.1.06. DIMENSIONAL STANDARDS: DIMENSIONAL STANDARDS: STANDARD DIMENSION CONVENTIONS UTILIZED HEREIN CALL FOR DIMENSIONS TO FACE OF STUD (MASONRY) OF FINISHED PARTITION, FACE OF FINISH, OR CENTERLINE OF COLUMN LINE OR OTHER REFERENCE LINE, UNLESS OTHERWISE NOTED OR GRAPHICALLY ILLUSTRATED. DIMENSIONS NOTED AS “CLEAR”, “MIN”, OR “MAX” SHALL BE STRICTLY ENFORCED.
1.07.1.07. {PM SOFTWARE}{PM SOFTWARE}
1.08.1.08. PERMITTING: PERMITTING: THE GENERAL CONTRACTOR SHALL SECURE AND PAY FOR ALL NECESSARY AND REQUIRED PERMITS AND APPROVALS FROM JURISDICTIONAL AUTHORITIES, PRIOR TO COMMENCING THE WORK. THIS REQUIREMENT SHALL APPLY TO ON-SITE AND OFF-SITE WORK REQUIRED BY THE CONTRACT DOCUMENTS.
1.09.1.09. CODE COMPLIANCE: CODE COMPLIANCE: THE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH ALL APPLICABLE LAWS, CODES, AND ORDINANCE. THE GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL PERFORM THEIR WORK IN COMPLIANCE WITH ALL APPLICABLE BUILDING CODES, LAWS, REGULATIONS, AND ORDINANCES. GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS SHALL CAREFULLY READ AND FAMILIARIZE THEMSELVES WITH THE CODE COMPLIANCE
DATA INCLUDED IN THE DRAWINGS AND SPECIFICATIONS.
1.10.1.10. NON-COMBUSTIBLE CONSTRUCTION TYPES: NON-COMBUSTIBLE CONSTRUCTION TYPES: THE PROPOSED BUILDING STRUCTURE IS NON-COMBUSTIBLE IN ACCORDANCE WITH APPLICABLE CODES, AND THEREFORE REQUIRES NON-COMBUSTIBLE CONSTRUCTION TECHNIQUES. ALL NEW CONSTRUCTION SHALL BE IN COMPLIANCE WITH APPLICABLE REQUIREMENTS, INCLUDING WOOD BLOCKING, FURRING, FRAMING, SHEATHING, BACK-BOARDS, AND RELATED WORK. FIRE RETARDANT TREATED [FRT] IS PERMITTED WHERE ALLOWED BY CODE. SEE CODE COMPLIANCE DRAWINGS FOR DETAILED INFORMATION AND
REQUIREMENTS.
1.11.1.11. TEMPORARY GUARDS: TEMPORARY GUARDS: THE GENERAL CONTRACTOR SHALL INSTALL AND MAINTAIN TEMPORARY GUARDS AT ALL SLAB EDGES, PIT EDGES, ELEVATED PLATFORM EDGES, AND SIMILAR CONDITIONS WHERE REQUIRED BY OSHA, ANY APPLICABLE CODE OR ORDINANCE, AND AT MINIMUM ALL CHANGES IN ELEVATION IN EXCESS OF THIRTY INCHES (30”) INCLUDING BOTH SIDES OF STAIRS AND LADDERS. TEMPORARY GUARDS MUST BE MAINTAINED UNTIL THE PERMANENT
GUARDS ARE INSTALLED.
1.12.1.12. LIFE-SAFETY MEASURES DURING CONSTRUCTION: LIFE-SAFETY MEASURES DURING CONSTRUCTION: THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS REQUIRED BY OSHA, CODE, AND OTHER APPLICABLE REGULATORY AUTHORITIES.
1.13.1.13. MEANS OF EGRESS: MEANS OF EGRESS: THE GENERAL CONTRACTOR SHALL MAINTAIN CLEAR AND UNOBSTRUCTED MEANS OF
EGRESS AT ALL TIMES DURING CONSTRUCTION, WITHOUT EXCEPTION.
1.14.1.14. CONSTRUCTION LOADS: CONSTRUCTION LOADS: THE GENERAL CONTRACTOR SHALL NEVER LOAD NEW OR EXISTING CONSTRUCTION BEYOND ITS DESIGN CAPACITY WITH STORED MATERIAL, CONSTRUCTION EQUIPMENT, TEMPORARY LOADS ASSOCIATED WITH MATERIAL MOVEMENT, HOISTING, STORAGE, OR SIMILAR CONDITIONS.
1.15.1.15. GENERAL CLEAN-UP: GENERAL CLEAN-UP: THE GENERAL CONTRACTOR SHALL INCLUDE ONGOING CLEAN-UP OF THE PROPERTY AND BUILDING, INCLUDING REMOVAL OF TRASH AND WASTE MATERIALS, ON A REGULAR BASIS DURING
CONSTRUCTION. RECYCLING OF CONSTRUCTION WASTE IS ENCOURAGED.
1.16.1.16. OWNER FURNISHED EQUIPMENT: OWNER FURNISHED EQUIPMENT: LOOSE FURNISHINGS, WORKSTATIONS, OFFICE EQUIPMENT, COPIERS, VENDING MACHINES, KITCHEN EQUIPMENT, AND SIMILAR ITEMS THAT ARE BOTH LABELED “OWNER FURNISHED” OR “OF/OI”, AND SHOWN DASHED OR IN GRAY-TONE SHALL BE CONSIDERED OWNER-FURNISHED EQUIPMENT. OWNER- FURNISHED EQUIPMENT IS SHOWN FOR THE GENERAL CONTRACTOR’S KNOWLEDGE AND UNDERSTANDING TO FACILITATE COORDINATION WITH THE OWNER’S WORK. THE GENERAL CONTRACTOR SHALL CAREFULLY REVIEW THE SCOPE OF WORK, AND REQUEST CLARIFICATION FROM THE ARCHITECT IN THE EVENT OF ANY UNCERTAINTY ABOUT THE
DEFINITION OF OWNER FURNISHED WORK.
1.17. 1.17. TEMPORARY BRACING: TEMPORARY BRACING: PRIOR TO REMOVAL OF ANY EXISTING STRUCTURAL ELEMENTS, THE GENERAL CONTRACTOR SHALL TEMPORARILY SHORE AND/OR BRACE EXISTING CONSTRUCTION TO REMAIN AS REQUIRED TO SUPPORT EXISTING LOADS AND/OR LOADS IMPOSED DURING CONSTRUCTION. FURTHER, THE GENERAL CONTRACTOR SHALL DESIGN, INSTALL AND MAINTAIN ANY TEMPORARY BRACING OR SUPPORT FRAMING REQUIRED TO SUPPORT NEW CONSTRUCTION COMPONENTS WHICH ARE NOT FULLY SECURED IN A COMPLETE STRUCTURAL ASSEMBLY, OR ARE OTHERWISE SUBJECTED TO LOADS IN EXCESS OF THE POST-CONSTRUCTION LOADS FOR WHICH THE ELEMENT IS
DESIGNED.
2.01.2.01. POSITIVE DRAINAGE AT BUILDING: POSITIVE DRAINAGE AT BUILDING: SLOPE EXTERIOR GRADE AWAY FROM THE BUILDING IN ACCORDANCE
WITH THE INTERNATIONAL BUILDING CODE.
2.02.2.02. SITE PAVING EXPANSION AND CONTROL JOINTS: SITE PAVING EXPANSION AND CONTROL JOINTS: WHETHER SPECIFICALLY INDICATED OR NOT, PROVIDE CONTROL JOINTS IN ALL SITE CONCRETE PAVING FOR PEDESTRIAN TRAFFIC AT AN INTERVAL OF NO MORE THAN FIVE FEET (5’) EACH WAY. IN ADDITION, PROVIDE CONTROL JOINTS AT NO MORE THAN THIRTY FOOT (30’) INTERVAL, EACH WAY. ALL EXPANSION JOINTS, INCLUDING THOSE BETWEEN HORIZONTAL PAVING AND VERTICAL ABUTMENTS, SHALL RECEIVE SPECIFIED JOINT FILLER, AS SPECIFIED IN SECTION 079000.
9.01.9.01. INDOOR ENVIRONMENTAL CONDITIONS: INDOOR ENVIRONMENTAL CONDITIONS: NO INTERIOR SOFT CONSTRUCTION [IE. DRYWALL, CEILINGS, CARPET, MILLWORK, OR SIMILAR WORK THAT IS SUBJECT TO TEMPERATURE AND HUMIDITY INSTABILITY] SHALL COMMENCE, NOR SHALL MATERIALS BE STORED ON SITE, UNTIL STABLE INTERIOR ENVIRONMENTAL CONDITIONS ACCEPTABLE TO THE PRODUCT MANUFACTURER ARE PROVIDED AND IN PLACE FOR A DURATION SUFFICIENT TO ESTABLISH CONSISTENT AND ACCEPTABLE INDOOR TEMPERATURE AND HUMIDITY LEVELS. FAILURE TO PROVIDE AN INDOOR ENVIRONMENT IN STRICT COMPLIANCE WITH THE PRODUCT MANUFACTURERS PRINTED REQUIREMENTS WILL SUBJECT THE INSTALLING CONTRACTOR TO FULL RESPONSIBILITY FOR ANY COSTS ASSOCIATED WITH RE-WORK DUE TO MOLD OR MILDEW GROWTH , WARPING, CUPPING, DE-LAMINATION, OR SIMILAR DETERIORATION OF THE STORED OR
INSTALLED CONSTRUCTION.
9.02.9.02. FLOOR & WALL TILE: FLOOR & WALL TILE: INSTALL FLOOR AND WALL TILE IN ALL SCHEDULED AREAS IN ACCORDANCE WITH
APPLICABLE TILE COUNCIL OF AMERICA (TCNA) METHOD.
9.03.9.03. FLOOR FINISH TRANSITIONS:FLOOR FINISH TRANSITIONS: UNLESS OTHERWISE INDICATED, TRANSITION FLOOR FINISHES AT CENTERLINE OF DOOR IN CLOSED LOCATION. TRANSITION FLOOR MATERIAL UNDER CENTER OF DOORS & WHERE NOTED. PROVIDE
SCHEDULED TRANSITION MATERIALS AT CHANGES IN FLOOR MATERIAL TYPE.
9.04.9.04. PARTITIONS: PARTITIONS: SEE PARTITION NOTES AND SPECIFICATIONS FOR REQUIREMENTS OF PARTITION
CONSTRUCTION.
9.05.9.05. EQUIPMENT ACCESS DOORS: EQUIPMENT ACCESS DOORS: THE GENERAL CONTRACTOR SHALL PROVIDE PROPOSED LOCATION OF CEILING ACCESS DOORS TO THE ARCHITECT FOR APPROVAL. ACCESS DOORS SHALL BE PAINTED TO MATCH ADJACENT
FINISH.
9.06.9.06. CASEWORK AND MILLWORK ANCHORAGE: CASEWORK AND MILLWORK ANCHORAGE: COORDINATE INSTALLATION OF IN-WALL STEEL ANCHORAGE, GROUNDS, AND REQUIRED BLOCKING WITH OTHER TRADES FOR PRECISE LOCATION.
9.07.9.07. PARTITION COORDINATION WITH OTHER TRADESPARTITION COORDINATION WITH OTHER TRADES :
(A) (A) COORDINATE BETWEEN TRADES BEFORE FRAMING PARTITIONS. PARTITION FRAMING SHALL BE LAID OUT SO AS TO PERMIT THE INSTALLATION OF PIPING, CONDUITS, AND DUCTWORK WITH A MINIMUM OF CUTTING BY OTHER TRADES.
(B)(B) EXCEPT FOR PIPING LOCATED IN EQUIPMENT ROOMS, ALL PIPING INSIDE THE BUILDING SHALL BE CONCEALED WITHIN PARTITIONS AND FURRED SPACES. WHERE IT OCCURS THAT PIPING CANNOT BE EASILY CONCEALED, NOTIFY THE ARCHITECT IN WRITING FOR CLARIFICATION. IN ANY CASE, SUCH PIPING SHALL BE CONCEALED AT NO ADDITIONAL
COST.
(C)(C) COORDINATE WITH OTHER TRADES AND OWNERS' SCHEDULED EQUIPMENT VENDORS FOR SUPPORT REQUIREMENTS OF WALL- MOUNTED AND SUSPENDED ITEMS. SIZE STUD GAUGE AND SPACING MUST BE ABLE TO SUPPORT ANY ADDITIONAL LOADS IMPOSED BY THESE ITEMS. MAX. DEFLECTION L/360 @ 5 PSF HORIZ. LOAD.
(D)(D) PROVIDE AND INSTALL ALL BLOCKING, STIFFENERS, BRACES, BACK-UP PLATES, AND SUPPORTING BRACKETS AS REQUIRED FOR THE INSTALLATION OF WALL-MOUNTED OR SUSPENDED MECHANICAL ELECTRICAL, CASEWORK, MILLWORK AND ANY OTHER MISCELLANEOUS EQUIPMENT OR WALL-MOUNTED ACCESSORIES.
(E) (E) ANY ADDITIONAL WORK OR, RE-WORK, AS A RESULT OF A FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL NOT
BE GIVEN CONSIDERATION FOR CHANGE ORDER.
9.089.08 FIRE-RATED PARTITIONS AND FIRE-RATED SMOKE BARRIER IDENTIFICATIONFIRE-RATED PARTITIONS AND FIRE-RATED SMOKE BARRIER IDENTIFICATION
(A) (A) FIRE-RATED PARTITIONS AND FIRE-RATED SMOKE BARRIERS SHALL BE PERMANENTLY LABELED IN RED STENCILED
LETTERING ABOVE FINISHED CEILING AT 1'-0" ABOVE CEILING.
1. 1. EACH NEW FIRE WALL, FIRE BARRIER, FIRE PARTITION, SMOKE BARRIER, SMOKE PARTITION, OR ANY OTHER NEW WALL REQUIRED TO HAVE PROTECTED OPENINGS SHALL BE PERMANENTLY IDENTIFIED WITH SIGNS OR
STENCILING ABOVE ANY DECORATIVE CEILING AND IN CONCEALED SPACES WITH THE WORDING, "FIRE AND SMOKE BARRIER - PROTECT ALL OPENINGS", OR SIMILAR LANGUAGE. SUCH SIGNS OR STENCILING SHALL BE IN
4 INCH HIGH LETTERS, I/2 INCH STROKE, AND NOT MORE THAN 15 FEET ON-CENTER.
(B)(B) UNLESS OTHERWISE REQUIRED OTHERWISE BY LOCAL JURISDICTION IDENITIFY RATED PARTITIONS AND WALLS AS FOLLOWS (G.C. MUST CONFIRM VERBIAGE WITH LOCAL AHJ)(G.C. MUST CONFIRM VERBIAGE WITH LOCAL AHJ) :
1-HOUR FIRE BARRIER - PROTECT ALL OPENINGS
1-HOUR FIRE & SMOKE BARRIER - PROTECT ALL OPENINGS
2-HOUR FIRE BARRIER - PROTECT ALL OPENINGS
2-HOUR FIRE & SMOKE BARRIER - PROTECT ALL OPENINGS
3-HOUR FIRE WALL - PROTECT ALL OPENINGS
4-HOUR FIRE WALL - PROTECT ALL OPENINGS
14.01. STRUCTURAL FOUNDATION COORDINATION: 14.01. STRUCTURAL FOUNDATION COORDINATION: COORDINATE EXACT BOTTOM OF ELEVATOR SHAFT WITH PIT DEPTH REQUIREMENTS OF SELECTED ELEVATOR MANUFACTURER. EXACT LOCATION OF SUMP PUMP AS DICTATED BY SELECTED ELEVATOR MANUFACTURER. AREA BETWEEN BOTTOM OF SLAB OF ELEVATOR SHAFT & STRUCTURAL
CONCRETE MAT FOOTING TO BE POROUS FILL.
14.02. STRUCTURAL CONCRETE WALL COORDINATION: 14.02. STRUCTURAL CONCRETE WALL COORDINATION: COORDINATE ALL REQUIRED ELEVATOR SHAFT WALL PENETRATIONS, EMBED LOCATIONS, SPECIAL HOISTWAY INFILL BRACKETS (IF REQUIRED FOR INSTALLATION IN SHAFT
PROVIDED), WALL MOUNTED LADDERS, ETC. WITH SELECTED ELEVATOR MANUFACTURER.
14.03. STRUCTURAL CMU WALL COORDINATION: 14.03. STRUCTURAL CMU WALL COORDINATION: COORDINATE ALL REQUIRED ELEVATOR SHAFT WALL PENETRATIONS, EMBED LOCATIONS, SPECIAL HOISTWAY INFILL BRACKETS (IF REQUIRED FOR INSTALLATION IN SHAFT
PROVIDED), ROUGH OPENINGS FOR DOORS, ETC. WITH SELECTED ELEVATOR MANUFACTURER.
14.04. ELECTRICAL COORDINATION: 14.04. ELECTRICAL COORDINATION: COORDINATE A MINIMUM QUANTITY (2) PER CAB, ELEVATOR DISCONNECTS
WITH SELECTED ELEVATOR MANUFACTURER
D I V I S I O N 2 - E X I S T I N G C O N D I T I O N SB
D I V I S I O N 3 - C O N C R E T EC
D I V I S I O N 4 - M A S O N R YD
D I V I S I O N 5 - M E T A L SE
D I V I S I O N 6 - W O O D , P L A S T I C S & C O M P O S I T E SF
D I V I S I O N 7 - T H E R M A L & M O I S T U R E P R O T E C T I O NG
D I V I S I O N 8 - O P E N I N G SH
D I V I S I O N 9 - F I N I S H E SI
D I V I S I O N 1 4 - C O N V E Y I N G S Y S T E M SN
D I V I S I O N 2 1 - F I R E S U P P R E S S I O NO
D I V I S I O N 2 2 - P L U M B I N GP
D I V I S I O N 2 3 - H V A CQ
D I V I S I O N 2 6 - E L E C T R I C A LR
D I V I S I O N 1 0 - S P E C I A L T I E SJ
D I V I S I O N 1 2 - F U R N I S H I N G SL
D I V I S I O N 1 1 - E Q U I P M E N TK
D I V I S I O N 1 - G E N E R A L R E Q U I R E M E N T SA
8.01.8.01. LABELED FIRE-RATED DOORS AND FRAMES: LABELED FIRE-RATED DOORS AND FRAMES: ALL FIRE DOORS AND FRAMES SHALL BE LABELED BY AN APPROVED AGENCY PER NFPA 80, AND SHALL BE PERMANENTLY AFFIXED THERETO, AND THE LIFE OF THE LABEL AND THE ATTACHMENT THEREOF CAN REASONABLY BE EXPECTED TO EQUAL THE LIFE OF THE COMPONENT TO WHICH IT IS ATTACHED. LABELS MUST BE PROVIDED BY A MANUFACTURER THAT HAS BEEN APPROVED BY A LABORATORY OR ORGANIZATION TO PROVIDE TESTING AND FOLLOW-UP SERVICES FOR FIRE-RATED OPENING ASSEMBLIES. ALL LABELS SHALL INCLUDE THE FIRE RESISTANCE RATING IN HOURS AND/OR MINUTES. LABELS ON FRAMES WITH TRANSOMS
AND/OR SIDELIGHTS MUST IDENTIFY THAT THE OPENING ASSEMBLY INCLUDES SAME.
(A) (A) LABELS SHALL BE RAISED OR EMBOSSED ON METAL LABELS.
(B) (B) PLASTIC OR PAPER LABELS ARE UNACCEPTABLE.
(C)(C) LABELS MUST BE VISIBLE AND LEGIBLE AT ALL TIMES AND SHALL NOT BE PAINTED.
1. FAILURE TO COMPLY WITH THIS REQUIREMENT WILL REQUIRE PAINTER TO REIMBURSE OWNER FOR
COSTS OF RE-LABELING RATED DOORS AND FRAMES.
8.028.02 FIRE-RATED CERAMIC GLAZING:FIRE-RATED CERAMIC GLAZING: AT FIRE-RATED DOORS, SIDELITES, AND TRANSOMS, PROVIDE FIRE- RATED CERAMIC GLAZING AT ANY VISION PANEL THAT EXCEEDS THE MAXIMUM ALLOWABLE GLASS SIZE PER IBC TABLE
716.5 (IBC 2015) or 716.1(2) (IBC 2018) AS APPLICABLE. SEE SPECIFICATION SECTION 08 8000 GLAZING FOR
CERAMIC GLAZING.
8.03.8.03. TEMPERED GLASS: TEMPERED GLASS: PROVIDE TEMPERED SAFETY GLASS EVERYWHERE REQUIRED BY APPLICABLE CODE, INCLUDING ANY GLASS IN DOORS, OPERABLE WINDOWS, ADJACENT TO DOORS OR OPERABLE WINDOWS, WITHIN 36”
OF THE ADJACENT FLOOR OR GRADE LEVEL, OR OTHERWISE WHERE REQUIRED BY CODE.
8.04.8.04. BLOCKING: BLOCKING: FURNISH AND INSTALL BLOCKING IN METAL STUD FRAMED WALLS AND PARTITIONS THAT ARE SCHEDULED TO RECEIVE DOOR BUMPERS/ STOPS, MAGNETIC LOCK DEVICES, AND SIMILAR DOOR RELATED DEVICES
THAT WILL SUBJECT THE PARTITION TO DOOR MOVEMENT LOADS AND IMPACT.
8.05.8.05. HOLLOW METAL FRAMES:HOLLOW METAL FRAMES: COORDINATE THE THROAT DEPTH OF ALL HOLLOW METAL FRAMES WITH THE
DEPTH OF THE PARTITION SCHEDULED TO RECEIVE THE DOOR OR WINDOW FRAME.
8.068.06 LEAD-LINED DOORS AND HOLLOW METAL FRAMES: LEAD-LINED DOORS AND HOLLOW METAL FRAMES: THESE DOORS ARE VERY HEAVY AND REQUIRE ADDITIONAL STRUCTURAL SUPPORT TO PREVENT SAGGING. TYPICALLY THIS WILL REQUIRE HEAVY GUAGE (16 GA.)
BOX-FRAMED AND WELDED STEEL STUD POSTS AT THE HINGE-SIDE JAMB. SEE DRAWING G1.22 AND SPECIFICATION
SECTION 09 2216 "NON-STRUCTURAL METAL FRAMING" FOR FURTHER INFORMATION.
7.01.7.01. GENERAL SEALANTS: GENERAL SEALANTS: CONTINUOUSLY SEAL PERIMETER OF ALL DOOR AND WINDOW FRAMES, MILLWORK AND CASEWORK, TRIM, CABINETS, AND SIMILAR FIXED CONSTRUCTION WITH PAINTABLE, SILICONIZED LATEX SEALANT. ALL VERTICAL SURFACE CONTROL AND EXPANSION JOINTS AT MASONRY WALLS SHALL BE
CONTINUOUSLY SEALED, BOTH SIDES OF JOINT.
7.02.7.02. SLOPE TO DRAIN: SLOPE TO DRAIN: ALL ROOF SURFACES SHALL BE SLOPED TO DRAIN, WITH MINIMUM PITCH OF ¼” PER LINEAR FOOT. PROVIDE TAPERED INSULATION, CRICKETS AS NECESSARY TO ASSURE THE MINIMUM SLOPE IS
ACHIEVED.
7.03.7.03. WALK-PADS: WALK-PADS: FURNISH AND INSTALL COMPATIBLE ROOF WALK-PADS AT ALL MEMBRANE ROOF SURFACES THAT ARE TRAVELED TO ACCESS SERVICEABLE ROOFTOP EQUIPMENT SUCH AS HVAC UNITS, FANS, ELECTRICAL EQUIPMENT, AND SIMILAR EQUIPMENT REQUIRING SERVICE ACCESS.
7.04.7.04. EXPANSION JOINTS COVERS: EXPANSION JOINTS COVERS: ALL BUILDING EXPANSION JOINTS EXPOSED TO VIEW IN FLOOR, PARTITION, AND/ OR CEILING ASSEMBLIES SHALL RECEIVE COLOR-COORDINATED PRE-FABRICATED EXPANSION JOINT COVER ASSEMBLY DESIGNED TO ALLOW THE REQUIRED MOVEMENT, AND TO PROVIDE UL APPROVED FIRE
RATED ASSEMBLY WHERE REQUIRED.
6.01.6.01. WOOD IN CONTACT WITH CONCRETE/ MASONRY: WOOD IN CONTACT WITH CONCRETE/ MASONRY: ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY CONSTRUCTION SHALL BE PRESSURE TREATED [PT] UNLESS OTHERWISE NOTED TO BE FIRE RETARDANT
TREATED [FRT].
6.02.6.02. FIELD VERIFICATION: FIELD VERIFICATION: THE CASEWORK OR MILLWORK CONTRACTOR SHALL OBTAIN AND VERIFY ALL FIELD MEASUREMENTS AND CONDITIONS AFFECTING HIS WORK AND SHALL BE RESPONSIBLE FOR ALL DETAILS AND
DIMENSIONS ASSURING PRECISION AND PROPER ASSEMBLY OF HIS PRODUCTS.
6.03.6.03. MILLWORK BASE: MILLWORK BASE: PROVIDE FINISHED BASE TO MATCH MATERIAL AND FINISH OF ADJACENT SCHEDULED WALL BASE, AT TOE-KICK AT ALL EXPOSED FRONT, SIDE, AND REAR FACES OF MILLWORK OR CASEWORK.
6.04.6.04. MILLWORK SPLASH: MILLWORK SPLASH: PROVIDE BACKSPLASH AT ALL COUNTERTOPS UNLESS OTHERWISE INDICATED ON PLAN. PROVIDE SIDESPLASH OF SAME MATERIAL, DIMENSION, AND FINISH EVERYWHERE A COUNTERTOP BACKSPLASH ABUTS A VERTICAL WALL SURFACE AT ONE OR MORE OF ITS SIDES UNLESS OTHERWISE INDICATED ON
PLAN.
5.01.5.01. EMBEDDED STEEL: EMBEDDED STEEL: ALL MISCELLANEOUS STEEL ITEMS INCLUDING STEEL EDGE ANGLES, EMBEDDED PLATE, AND SIMILAR WORK SHALL BE HOT-DIPPED GALVANIZED. THIS PROVISION DOES NOT APPLY TO
REINFORCING STEEL, WHICH SHALL COMPLY WITH SPECIFICATION DIVISION 033000.
4.01.4.01. SEAL VENEER ANCHORS: SEAL VENEER ANCHORS: ALL EXTERIOR VENEER SYSTEM ANCHORS SHALL BE SET IN FULL, FRESH BED OF TROWEL GRADE AIR/MOISTURE BARRIER COATING, OR DOW 795 OR EQUIVALENT AT THE PLANE OF THE AIR/
MOISTURE BARRIER.
3.01.3.01. SLAB-ON-GRADE: SLAB-ON-GRADE: SEE SPECIFICATION SECTION 033000 FOR DETAILED REQUIREMENTS OF SLAB-ON- GRADE CONSTRUCTION, INCLUDING REQUIREMENTS FOR REINFORCING, CONCRETE ADMIXTURES, VAPOR BARRIER, AND SURFACE TREATMENTS [IF ANY]. ALL SLAB-ON-GRADE CONSTRUCTION SHALL BE INSTALLED OVER MINIMUM
FOUR INCH (4”) THICK COMPACTED POROUS DRAINAGE LAYER UNLESS NOTED OTHERWISE.
3.02.3.02. SLAB EXPANSION AND CONTROL JOINTS: SLAB EXPANSION AND CONTROL JOINTS: SEE STRUCTURAL DRAWINGS FOR REQUIRED SLAB EXPANSION AND CONTROL JOINTS. ALL EXPANSION JOINTS AND CONTROL JOINTS IN FLOOR SLABS, AND BETWEEN FLOOR SLABS AND VERTICAL ABUTMENTS SHALL RECEIVE TRAFFIC BEARING SEALANT JOINT MATERIAL.
3.03.3.03. CORE DRILLING - FLOOR SLABS: CORE DRILLING - FLOOR SLABS: THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF THE LOCATION AND DIMENSION OF ANY PROPOSED CORES THROUGH STRUCTURAL FLOOR SLABS, PRIOR TO COMMENCING CORING ACTIVITIES. CORE DRILLING IS STRICTLY PROHIBITED (SLEEVES ONLY) IN ANY POST-
TENSIONED STRUCTURED FLOOR SLAB ASSEMBLIES.
3.04.3.04. FLOOR LOADING DURING CONSTRUCTION: FLOOR LOADING DURING CONSTRUCTION: NO LOADS EXCEEDING THE SPECIFIED FLOOR LIVE LOAD INCLUDING CONSTRUCTION EQUIPMENT OR LIFTS SHALL BE PLACED ON THE ELEVATED SLABS WITHOUT REVIEW AND APPROVAL OF THE STRUCTURAL ENGINEER. ANY REQUESTS SHALL BE MADE IN WRITING BY THE GENERAL CONTRACTOR INCLUDING CUT SHEETS AND PROPOSED LOADING CRITERIA. DO NOT PROCEED UNTIL WRITTEN
AUTHORIZATION FROM THE STRUCTURAL ENGINEER HAS BEEN PROVIDED.
12.01. CASEWORK BASE: 12.01. CASEWORK BASE: PROVIDE FINISHED BASE TO MATCH MATERIAL & FINISH OF ADJACENT WALL BASE, AT TOE
KICK, AT ALL EXPOSED FRONT, SIDE, & REAR FACES OF CASEWORK.
12.02. CASEWORK SPLASH: 12.02. CASEWORK SPLASH: PROVIDE BACKSPLASH AT ALL COUNTERTOPS UNLESS OTHERWISE INDICATED ON PLAN.
PROVIDE SIDESPLASH OF SAME MATERIAL, DIMENSION, AND FINISH EVERYWHERE A COUNTERTOP BACKSPLASH ABUTS A VERTICAL WALL SURFACE AT ONE OR MORE OF ITS SIDES UNLESS OTHERWISE INDICATED ON PLAN.
26.01. MEP DEVICE/ FIXTURE COORDINATION: 26.01. MEP DEVICE/ FIXTURE COORDINATION: COORDINATE LOCATIONS FOR DIFFUSERS, AND RETURN AIR GRILLES TO THE GREATEST EXTENT POSSIBLE IN ORDER TO MAINTAIN LIGHTING LAYOUT INDICATED IN THE DRAWINGS. MEP&FP CONTRACTORS SHALL COORDINATE WORK WITH OTHER DISCIPLINES PRIOR TO INSTALLATION. ALL ELECTRICAL ITEMS INDICATED IN OR ON CABINETRY OR MILLWORK SHALL BE SUPPLIED, INSTALLED AND COORDINATED BY THE
ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED.
26.02. CENTER CEILING DEVICES: 26.02. CENTER CEILING DEVICES: CENTER LIGHTS, SUPPLY DIFFUSERS, RETURN GRILLES, SPRINKLER HEADS, ETC.
IN CEILING PANELS IF NOT OTHERWISE INDICATED.
26.03. ELECTRICAL BOXES IN RATED PARTITIONS:26.03. ELECTRICAL BOXES IN RATED PARTITIONS: WHERE ELECTRICAL BOXED ARE INSTALLED IN FIRE-RATED METAL STUD PARTITIONS, INSTALL BOXES NO LARGER THAN SIXTEEN SQUARE INCHES (16 SI) IN AREA, AND DO NOT EXCEED ONE-HUNDRED SQUARE INCHES (100 SI) OF METALLIC BOX PER ONE-HUNDRED SQUARE FEET (100 SF) OF FIRE- RATED WALL AREA. WHERE ELECTRICAL REQUIREMENTS DICTATE A HIGHER RATION, TREAT THE ELECTRICAL BOXES WITH CODE APPROVED METHOD TO ASSURE CONTINUOUS RATING. FURTHER, DO NOT INSTALL ELECTRICAL BOXES
BACK-TO-BACK IN THE SAME STUD CAVITY WITHOUT APPROVED FIRE-RATED TREATMENT.
26.04. ELECTRICAL DEVICES IN OR NEAR MILLWORK: 26.04. ELECTRICAL DEVICES IN OR NEAR MILLWORK: CAREFULLY LOCATE ELECTRICAL BOXES FOR DEVICES IN OR NEAR MILLWORK AND/OR CASEWORK TO ASSURE COORDINATED INSTALLATION. LOCATE ELECTRICAL DEVICES ABOVE COUNTERTOP SUCH THAT THE DEVICE COVER PLATE WILL NOT INTERFERE WITH SCHEDULED BACKSPLASH OR
SIDESPLASH.
23.01. MEP DEVICE/ FIXTURE COORDINATION: 23.01. MEP DEVICE/ FIXTURE COORDINATION: COORDINATE LOCATIONS FOR DIFFUSERS, AND RETURN AIR GRILLES TO THE GREATEST EXTENT POSSIBLE IN ORDER TO MAINTAIN LIGHTING LAYOUT INDICATED IN THE DRAWINGS. MEP&FP
CONTRACTORS SHALL COORDINATE WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
22.01. CONCEALED PIPING: 22.01. CONCEALED PIPING: ALL PIPING, DUCTWORK, ELECTRICAL RACEWAYS & CONDUITS SHALL BE CONCEALED IN THE BUILDING CONSTRUCTION. THE GENERAL CONTRACTOR SHALL INCLUDE, IN THE BASE BID, REQUIRED FURRING TO CONCEAL THESE SYSTEMS WHETHER OR NOT THE FRAMING AND FURRING IS ILLUSTRATED IN THE DRAWINGS.
22.02. SECURE PIPING: 22.02. SECURE PIPING: TIE ALL PIPING "HARD" TO STRUCTURE.
22.03. GAS PIPING EXPOSED ON ROOF: 22.03. GAS PIPING EXPOSED ON ROOF: WHERE GAS PIPING IS EXPOSED ON THE ROOF, PAINT GAS PIPING
"YELLOW".
22.04. PLUMBING FIXTURES: 22.04. PLUMBING FIXTURES: CAREFULLY REVIEW THE DIMENSIONAL STANDARDS FOR INSTALLED PLUMBING FIXTURES, AND PLAN THE WORK TO ASSURE FULL COMPLIANCE OF CODE REQUIRED FIXTURE CLEARANCES.
21.01. FIRE PROTECTION SYSTEMS: 21.01. FIRE PROTECTION SYSTEMS: WHERE REQUIRED, INSTALL FIRE PROTECTION SYSTEMS IN STRICT ACCORDANCE WITH APPLICABLE CODES AND ORDINANCES, INCLUDING NFPA. ALL EQUIPMENT UTILIZED IN THE FIRE PROTECTION
SYSTEM SHALL BE LISTED BY UNDERWRITER'S LABORATORIES [UL].
21.02. FIRE PROTECTION SYSTEM DESIGN: 21.02. FIRE PROTECTION SYSTEM DESIGN: WHERE DESIGN OF THE FIRE PROTECTION SYSTEM IS THE RESPONSIBILITY OF THE CONTRACTOR AS REQUIRED BY A PERFORMANCE SPECIFICATION, THE SYSTEM DESIGN SHALL BE SUPERVISED BY AN INDIVIDUAL WHO IS A REGISTERED FIRE PROTECTION ENGINEER AND/OR IS CERTIFIED AT LEVEL III OR HIGHER IN FIRE PROTECTION ENGINEERING TECHNOLOGY AUTOMATIC SPRINKLER SYSTEM LAYOUT BY THE NATIONAL INSTITUTE
FOR CERTIFICATION IN ENGINEERING TECHNOLOGY (NICET).
21.03. FIRE PROTECTION PIPING: 21.03. FIRE PROTECTION PIPING: SPRINKLER PIPING SHALL BE UNENCUMBERED BY THE WORK OF ANY OTHER TRADE THROUGHOUT THE ENTIRE BUILDING. UNDER NO CIRCUMSTANCES SHALL ANYTHING BE SUPPORTED BY, DRAPED OVER, TIED-OFF TO, OR SUSPENDED BY, SPRINKLER PIPING. GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO CONTINUOUSLY MONITOR ONGOING WORK IN THE VICINITY OF SPRINKLER PIPING AND SHALL DIRECT ANY OTHER CONTRACTOR OR TRADESMAN TO IMMEDIATELY REMOVE AND RE-INSTALL ANY ITEM NOT IN COMPLIANCE WITH THIS
REQUIREMENT.
11.01. EQUIPMENT GENERAL:11.01. EQUIPMENT GENERAL: FOR EQUIPMENT OR SYSTEMS INSTALLED UNDER SEPARATE CONTRACT, GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH SEPARATE CONTRACTORS SO WORK ON THOSE CONTRACTS MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS CONTRACT OR OTHER CONTRACTS. COORDINATE THE WORK OF THIS CONTRACT WITH WORK PERFORMED UNDER SEPARATE CONTRACTS.
WORK TO BE PERFORMED UNDER SEPARATE CONTRACT IS AS ITEMIZED UNDER SPECIFICATION SECTION 01 1000 -
"SUMMARY"; PARA. "1.07 WORK UNDER SEPARATE CONTRACTS".
11.02. MEDICAL EQUIPMENT, GENERAL: 11.02. MEDICAL EQUIPMENT, GENERAL: MEDICAL EQUIPMENT PLANNED FOR THIS FACILITY REQUIRING ELECTRICAL, PLUMBING, OR HVAC SERVICES IS AS SCHEDULED ON THE EQUIPMENT PLAN DRAWING AND/OR BOUND EQUIPMENT MANUAL. GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THESE REQUIREMENTS AND INCLUDE ALL WORK
NECESSARY FOR A COMPLETE INSTALLATION.
11.03. MEDICAL EQUIPMENT VENDOR DRAWINGS: 11.03. MEDICAL EQUIPMENT VENDOR DRAWINGS: WHEN APPLICABLE, VENDOR'S SITE-SPECIFIC INSTALLATION DRAWINGS WILL BE PROVIDED TO THE CONTRACTOR FOR INFORMATION (e,g. X-RAY, CT, MRI, OR SIMILAR MAJOR ITEMS). EQUIPMENT INSTALLATION WILL BE BY THE RESPECTIVE VENDOR/S HOWEVER, THESE DRAWINGS ASSIGN RESPONSIBILITY TO GENERAL, AND OTHER CONTRACTOR/S, FOR WORK REQUIRED FOR A COMPLETE INSTALLATION THAT IS NOT PERFORMED BY THE VENDOR. GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THESE
RESPONSIBILITIES AND INCLUDE ALL WORK NECESSARY FOR A COMPLETE INSTALLATION.
10.01. SPECIALTIES GENERAL:10.01. SPECIALTIES GENERAL: WHEN APPLICABLE TO THE PROJECT, OWNER WILL AWARD AND WILL ASSIGN TO THE GENERAL CONTRACTOR THE CONTRACT FOR CERTAIN SPECIALTY ITEMS. CONTRACTOR SHALL BE RESPONSIBLE FOR PROCURING, SCHEDULING, AND COORDINATING THE INSTALLATION OF WORK INSTALLED UNDER THESE CONTRACTS. THE COST OF ASSIGNED CONTRACTS SHALL BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT. SEE SPECIFICATION
SECTION 01 1000 - "SUMMARY""; PARA. "1.07 WORK UNDER SEPARATE CONTRACTS"
10.02. SPECIALTY CONTRACTS: 10.02. SPECIALTY CONTRACTS: THE FOLLOWING SPECIALTY CONTRACTS WILL BE ASSIGNED TO THE GENERAL
CONTRACTOR:
(A) (A) INTERIOR AND EXTERIOR SIGNAGE PACKAGE.
(B)(B) ROLLER WINDOW SHADE AND CUBICLE CURTAIN PACKAGE.
D I V I S I O N 1 3 - S P E C I A L C O N S T R U C T I O N M
13.01. RF (RADIO-FREQUENCY) SHIELDED ENCLOSURES:13.01. RF (RADIO-FREQUENCY) SHIELDED ENCLOSURES: WHEN MRI ROOM RF ENCLOSURE/S ARE APPLICABLE TO THE PROJECT, OWNER WILL AWARD AND WILL ASSIGN TO THE GENERAL CONTRACTOR THE CONTRACT FOR THE RF SHIELDED ENCLOSURE/S. CONTRACTOR SHALL BE RESPONSIBLE FOR PROCURING, SCHEDULING, AND COORDINATING THE INSTALLATION OF WORK INSTALLED UNDER THESE CONTRACTS. THE COST OF ASSIGNED CONTRACTS SHALL BE
INCLUDED AS PART OF THE WORK OF THIS CONTRACT.
13.02. LEAD SHIELDING REQUIREMENTS: 13.02. LEAD SHIELDING REQUIREMENTS: SEE SPECIFCATION SECTION 134900 "RADIATION PROTECTION" FOR LEAD
SHIELDING REQUIREMENTS AT X-RAY DIAGNOSTIC ROOMS.
(A) (A) ALL RADIATION PROTECTION WORK MUST BE INSTALLED IN STRICT CONFORMANCE WITH PHYSICIST’S REPORTS PROVIDED BY THE OWNER. IF AT THE TIME OF BIDDING SAID REPORT/S ARE NOT AVAILABLE, CONTRACTOR SHALL ASSUME THAT ALL LEAD SHIELDING WILL BE THE EQUIVALENT OF 1/16” (15MM) THICK FOR BIDDING PURPOSES.
(B)(B) UPON COMPLETION OF RADIATION PROTECTION WORK, ALL X-RAY DIAGNOSTIC ROOMS WILL BE SUBJECT TO AN OWNER-COMMISSIONED SHIELDING INTEGRITY SURVEY TO CONFIRM THAT THE SHIELDING WAS INSTALLED ACCORDING
TO PLAN AND THAT X-RAYS ARE BEING CONTAINED WITHIN THE ROOM BY THE SHIELDING.
(C) (C) SHOULD SHIELDING FAILURES OCCUR DURING THE INTEGRITY SURVEY, CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY BREACHES IN THE LEAD SHIELDING SYSTEM. ANY REPAIRS TO WALL, FLOOR , OR CEILING FINISHES AS MAY BE REQUIRED BY THIS REMEDIAL WORK SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST.
G E N E R A L N O T E S THE GENERAL NOTES BELOW ARE INTENDED TO COMPLEMENT, RATHER THAN REPLACE, REQUIREMENTS PUT FORTH BY THE PROJECT SPECIFICATIONS. SHOULD A DISCREPANCY BE FOUND BETWEEN THESE GENERAL NOTES AND THE PROJECT SPECIFICATIONS THE GC SHALL NOTIFY THE ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING.
Ba rn ar d
St . S ui te
B
T
.2
.16
G
M C
N E
T W
O R
K . C
O M
G M
C N
E T
W O
R K
. C O
M
Sa va nn ah
, G A
G oo dw yn
M ill s C aw oo d, L
LC
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D
RA
W N
B Y
IS
SU
E
C H
EC
K
ED
B
Y
D A
TE
G M
C
8/
/2
5:
:4
PM
G
EN
ER
A
L N
O
TE
S
G
A M
BL
E
RO
A
D , S
A V
A N
N A
H , G
A
TE
M
PL
A
TE
V
ER
SI
O N
: 2
2.
G 1.0
A ut ho r C he ck er
/3
1/
D
D P
RO
G
RE
SS
S
ET
SC
C
PS
S
RE
ST
RO
O
M S
A N
D O
FF
IC
E
BU
IL
D
IN
G
[A
SA
V
A G
EN
C
Y
[0
A G
EN
C
Y
[0
SD
0%
/3
1/
B/B
BC
BD
BLDG
BLKG
BM
BOT
BRG
BSMT
BUR
BOW
B/W
CAB
CB
C/C
CD
CF
CFCI
CI
CIP
CJ
CLG
CLO
CLR
CMP
CMU
CO
COL
CONC
CONN
CONST
CONT
COORD
CPT
CSMU
CT
CW
D
DBL
DEM
DET
DH
DIA
DIAG
DIM
DL
DS
DWG
DF
FACE OF
FACE OF BRICK
FACE OF CONCRETE
FACE OF FINISH
FACE OF MASONRY
FACE OF STUD
FRAME (ED), (ING)
FIRE RETARDANT TREATED
FOOT/FEET
FOOTING
GAUGE
GALVANIZED
GRAB BAR
GALVANIZED HOLLOW METAL
GALVANIZED IRON
GYPSUM WALL BOARD
GYPSUM
HEIGHT
HANDICAP
HOLLOW METAL
HIGHEST OPERABLE DEVICE
HORIZONTAL
HIGH POINT/HORSE POWER
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING / VENTILATION / AIR
CONDITIONING
HARDWARE
ID
IE
IJ
IN
INSUL
JAN
JG
JT
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
OVERHEAD
ON CENTER (S)
OCCUPANT (S)
OUTSIDE DIAMETER
OWNER FURNISHED,
CONTRACTOR INSTALLED
OPPOSITE HAND
OPENING
OPPOSITE
PRECAST JOINT
PROPERTY LINE, PLATE
PLASTIC LAMINATE
PAINT (ED)
PREFABRICATED
PREFINISHED
PREMANUFACTURED
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POINT / PRESSURE TREATED /
POINT OF TANGENCY
POLYVINYL CHLORIDE
PAVEMENT
PLYWOOD
QUARRY TILE
FBO
FD
FEC
FFE
FFW
FHC
F/F
FL
FLG
FND
W
WB
WC
WD
WH
WIN
WP
WT
W/W
WWF
W/ W/O
TELE
TERM
T&G
TH
THK
TO
TOC
TOGB
TOF
TOJ
TOS
TOW
TYP
TZ
UNO
VB
VCT
VERT
VWC
REQUIRED
RETAINING
REVISION (S), REVISED
RIGHT HAND
RECESSED JOINT
ROOM
ROUGH OPENING
RIGHT OF WAY
ROOF TOP UNIT
SEALED CONCRETE
SCHEDULED
STORM DRAIN
SECTION
STOREFRONT
SIMILAR
SPECIFICATION (S)
SQUARE
SOLID SURFACE
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURAL
SQUARE YARD
BACK-TO-BACK
BASE OF CURB
BOARD
BUILDING
BLOCKING
BENCHMARK
BOTTOM
BEARING
BASEMENT
BUILT-UP ROOF
BOTTOM OF WALL
BETWEEN
ACC
ACI
ACT
ADD
AFF
ALT
ALUM
APPROX
ARCH
ADJ
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ADDENDUM
ABOVE FINISH FLOOR
ALTERNATE
ALUMINUM
APPROXIMATE
ARCHITECT (URAL)
ADJACENT
CABINET
CATCH BASIN
CENTER TO CENTER
CORE DECK
CUBIC FOOT
CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CAST IRON
CAST IRON PIPE
CONSTRUCTION OR CONTROL JOINT
CEILING
CLOSET
CLEAR (ANCE)
CORRUGATED METAL PIPE
CONCRETE MASONRY UNIT
CLEAN OUT
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS OR CONTINUE
COORDINATE
CARPET (ED)
CALCIUM SILICATE MASONRY UNIT
CERAMIC TILE
CURTAIN WALL
DRYER
DOUBLE
DEMOLISH OR DEMOLITION
DETAIL
DOUBLE HUNG
DIAMETER
DIAGONAL
DIMENSION
DEAD LOAD
DOWNSPOUT
DRAWING
DRINKING FOUNTAIN
FURNISHED BY OTHERS
FLOOR DRAIN
FIRE EXTINGUISHER & CABINET
FINISH FLOOR ELEVATION
FINISH FACE OF WALL
FIRE HOSE & CABINET
FACE TO FACE
FLOOR
FLANGE
FOUNDATION
FO
FOB
FOC
FOF
FOM
FOS
FR
FRT
FT
FTG
GA
GALV
GB
GHM
GI
GWB
GYP
H
HC
HM
HOD
HORIZ
HP
HSS
HT
HVAC
HW
INSIDE DIAMETER
INVERT ELEVATION
ISOLATION JOINT
INCH / INCHES
INSULATION
JANITOR'S CLOSET
JOIST GIRDER
JOINT
NIC
NO
NOM
NTS
O/H
OC
OCC
OD
OFCI
OH
OPG
OPP
PJ
PL
PLAM
PNT
PREFAB
PREFIN
PREMANUF
PSF
PSI
PT
PVC
PVMT
PWD
QT
REQ'D
RET
REV
RH
RJ
RM
RO
ROW
RTU
SC
SCHED
SD
SECT
SF
SIM
SPEC
SQ
SS
SST
STD
STL
STOR
STRUCT
SY
TELEPHONE
TERMINATION
TONGUE AND GROOVE
THICK (NESS)
THICK (NESS)
TOP OF
TOP OF CURB
TOP OF GRAB BAR
TOP OF FOOTING
TOP OF JOIST
TOP OF SLAB / TOP OF STEEL
TOP OF WALL
TYPICAL
TERRAZZO
UNLESS NOTED OTHERWISE
VINYL BASE
VINYL COMPOSITION TILE
VERTICAL
VINYL WALL COVERING
WASHER / WIDTH / WIDE FLANGE
WOOD BASE
WATER CLOSET
WOOD
WATER HEATER
WINDOW
WORK POINT / WATERPROOFING
WEIGHT
WALL TO WALL
WELDED WIRE FABRIC
WITH
WITHOUT
MATERIAL
MAXIMUM
MISCELLANEOUS CHANNEL
MECHANICAL
MEZZANINE
MANUFACTURE (R)
MANHOLE
MINIMUM
MASONRY OPENING
MULLION
MATL
MAX
MC
MECH
MEZZ
MANUF
MH
MIN
MO
MULL
LAMINATE (D)
LINEAR FOOT
LENGTH, ANGLE
LABORATORY
LAVATORY
LEFT HAND
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LOW POINT
LIGHT GAUGE
LIGHT
LAM
LF
L
LAB
LAV
LH
LL
LLH
LLV
LP
LT GA
LT
K
KIP
KJ
KSI
THOUSAND
1000 #
KEY JOINT
1000 # PER SQ IN
RETURN AIR
RADIUS
RUBBER BASE
REFLECTED CEILING PLAN
ROOF DRAIN
REINFORCEMENT BAR
REFRIGERATOR / REFERENCE
REINFORCE (D), (ING)
RA
RAD
RB
RCP
RD
REBAR
REF
REINF
EA
EF
EIFS
EJ
ELEV
ELEC
ENGR
EOP
EOS
EQ
EW
EWC
EXH
EXIST
EXP
EXPN
EXT
EACH
EACH FACE
EXTERIOR INSULATION FINISH SYSTEM
EXPANSION JOINT
ELEVATION / ELEVATOR
ELECTRIC (ALL)
ENGINEER
EDGE OF PAVEMENT
EDGE OF SLAB
EQUAL
EACH WAY
ELECTRIC WATER COOLER
EXHAUST
EXISTING
EXPOSED
EXPANSION
EXTERIOR
ROOM REFERENCE TAG ROOM REFERENCE TAG
COLUMN LINES: COLUMN LINES:
CONSECUTIVE NUMBERS ARE
USED FOR COLUMN LINES
RUNNING NORTH & SOUTH
677.52 ELEVATION TAG:ELEVATION TAG:
677.52 - ELEVATION (FT)
W-1W-1
0G
L-1L-1
ROOM NAMEROOM NAME
101101
DOOR TAG:DOOR TAG:
DOOR NUMBER 101
WINDOW TAG:WINDOW TAG:
WINDOW TYPE 1
LOUVER TAG:LOUVER TAG:
LOUVER TYPE L1
WALL TAG:WALL TAG:
INTERIOR WALL TYPE 0G
REVISION CLOUD AND TAG:REVISION CLOUD AND TAG:
USED TO INDICATE SCOPE OF
CURRENT REVISION
A1.01A1.013
TRUE
NORTH
A1.01A1.01
INTERIOR ELEVATION TAG:INTERIOR ELEVATION TAG:
INTERIOR ELEVATION 3
ON SHEET A101
NORTH ARROW:NORTH ARROW:
ARCHITECTURAL PLAN ORIENTATION
FF&E: FF&E:
BY OTHERS
EXTERIOR ELEVATION TAG:EXTERIOR ELEVATION TAG:
ELEVATION 1 ON SHEET A101
PLAN
NORTH
TA01
G1
A1.01A1.01
A1.01A1.01
SPECIALTY EQUIPMENT TAG:SPECIALTY EQUIPMENT TAG:
SEE SPECIALTY EQUIPMENT
SCHEDULE
PLAN KEYNOTE TAG:PLAN KEYNOTE TAG:
KEYNOTE NUMBER
SEE PLAN KEYNOTE SCHEDULE
BUILDING SECTION TAG:BUILDING SECTION TAG:
SECTION 1 ON SHEET A101
WALL SECTION TAG:WALL SECTION TAG:
SECTION 1 ON SHEET A101
ENLARGED DETAIL TAG:ENLARGED DETAIL TAG:
DETAIL 1 ON SHEET A101
A1.01A1.01
HEIGHT #
WIDTH #
DEPTH #
CDS#
CASEWORK TAGCASEWORK TAG
A CONSECUTIVE LETTERS ARE
USED FOR COLUMN LINES
RUNNING EAST & WEST
FACE OF MASONRY
OR FACE OF GIRDER
NORTH ARROW:NORTH ARROW:
CIVIL ORIENTATION
(SEE FLOOR PLANS AND
DOOR SCHEDULE)
(SEE EXTERIOR ELEVATIONS
AND GLAZING SCHEDULE)
(SEE LOUVER SCHEDULE)
(SEE PARTITION LEGEND)
INTERIOR FINISH TAGINTERIOR FINISH TAG
PNT-1
RB-1
LVT-1
PL-3 SS-1
PRIMARY / ACCENT
WALL FINISH
BASE FINISH
FLOOR FINISH
CASEWORK /
COUNTERTOP FINISH
PNT-5
C-1C-1
CURTAINWALL TAG:CURTAINWALL TAG:
CURTAINWALL TYPE 1
(SEE EXTERIOR ELEVATIONS
AND GLAZING SCHEDULE)
S-1S-1
STOREFRONT TAG:STOREFRONT TAG:
STOREFRONT TYPE 1
(SEE EXTERIOR ELEVATIONS
AND GLAZING SCHEDULE)
30.00°
.0
0°
Ba rn ar d
St . S ui te
B
T
.2
.16
G
M C
N E
T W
O R
K . C
O M
G M
C N
E T
W O
R K
. C O
M
Sa va nn ah
, G A
G oo dw yn
M ill s C aw oo d, L
LC
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D
RA
W N
B Y
IS
SU
E
C H
EC
K
ED
B
Y
D A
TE
G M
C
8/
/2
5:
:4
PM
G
EN
ER
A
L
IN
FO
RM
A
TI
O N
M
O C
K U
P W
A
LL
G A
M
BL
E
RO
A D
, S A
V A
N N
A H
, G A
TE
M
PL
A
TE
V
ER
SI
O N
: 2
2.
G 1.0
A ut ho r C he ck er
/3
1/
D
D P
RO
G
RE
SS
S
ET
SC
C
PS
S
RE
ST
RO
O
M S
A N
D O
FF
IC
E
BU
IL
D
IN
G
[A
SA
V
A G
EN
C
Y
[0
A G
EN
C
Y
[0
M O C K U P W A L LA B B R E V I A T I O N S
A N N O T A T I O N S Y M B O L S & T A G S
V I C I N I T Y M A P
TRUE
NORTH
L O C A T I O N M A P
TRUE
NORTH
SD
0%
/3
1/
T Y P I C A L R E A C H R A N G E S
WALL MOUNTED DEVICE WALL MOUNTED DEVICE
COUNTER TOP
WALL MOUNTED DEVICE WALL MOUNTED
DEVICE
WALL MOUNTED DEVICE
FIXED OBJECT
WALL MOUNTED DEVICE
FIXED OBJECT
F.F.E.
COUNTER TOP
M
IN
HO
D
" M
AX
SE
E
EL
EV HO
D
" M
AX
SE
E
EL
EV
HO
D
" M
AX
10" MAX
" M
AX
" M
AX HO
D
" M
AX
HO
D
" M
AX
HO
D
" M
AX
M
IN
>20" - 25" MAX
MAX
20" 10" MAX >10" - 24" MAX
U N O B S T R U C T E D F O R W A R D R E A C H O B S T R U C T E D H I G H F O R W A R D R E A C H U N O B S T R U C T E D S I D E R E A C H O B S T R U C T E D H I G H S I D E R E A C H
F.F.E. F.F.E. F.F.E.
36" MIN BAR
17" FFW
W A T E R C L O S E T
TO
G
B
" A
FF
TO
S
EA
T
" A
FF
GB
42" MIN
54" MIN
12" MAX
" A
FF
M
IN
1' -6
"FFW
±40"
12" MIN
24" MIN
59" MIN CLR
CLR FLOOR SPACE
60" MIN
CL
R
9" M
IN
TO
G
B
" A
FF
AF
F
" M
AX
PARTITION
PARTITION
CL
R
9" M
IN
CLR
6" MIN
FFW
24" MIN
URINAL SCREEN
(WHERE OCCURS)
FFW
13 1/2" MIN
" A
FF
M
IN
M
AXAF
F
TO
H O
D
" M
AX
6" MIN CLR
15" MIN CLR
TO ANY
OBSTRUCTION
48" MIN CLR
TO
H
O D
U R I N A L
MIN
1'-3" COUNTER
WHERE
OCCURS
OFFSET WASTE
ACCESSIBLE SINK
BOWL 6 -1/2" DEEP
INSULATE
EXPOSED PIPING
M
AX
" A
FF
KN
EE
C
LR
" M
IN
TO
E
CL
R
9" M
IN
FFW
17" MIN
8"MIN CLR
11"MIN CLRTOE CLR
6"MIN
L A V A T O R Y O R V A N I T Y S I N K
F.F.E.
F.F.E.
NOTE: PROVIDE TA90,
UNDERLAVATORY GUARD
AT ALL EXPOSED LAVATORY
OR SINK PIPING
01. ACCESSIBILITY STANDARDS:01. ACCESSIBILITY STANDARDS: CONTRACTOR MUST BE FAMILIAR WITH AND, SHALL MAINTAIN ON THE JOB SITE, A COPY OF THE CURRENT ADAAG
STANDARDS AND IBC CHAPTER 11 ACCESSIBILITY REQUIREMENTS (OR
FLORIDA BUILDING CODE ACCESSIBLILITY) AS APPLICABLE. DURING
CONSTRUCTION THE GENERAL CONTRACTOR SHALL BE MINDFUL OF THESE
ACCESSIBILITY REQUIREMENTS INCLUDING MOUNTING HEIGHTS AND FLOOR
MANEUVERING CLEARANCES AND, IN THE EVENT THAT FIELD CONDITIONS
WILL NOT ALLOW FOR ACCESSIBILITY REQUIREMENTS TO BE MAINTAINED IN
A PARTICULAR CONDITION OR INSTALLATION, CONTRACTOR SHALL NOTIFY
THE ARCHITECT FOR FURTHER DIRECTION PRIOR TO PROCEEDING.
02.02. ADA DEVICES:ADA DEVICES: ALL DEVICES AND FIXTURES DEPICTED HEREIN AND WHERE
NOTED AS “ADA” OR “ACCESSIBLE” SHALL AT MINIMUM BE INSTALLED IN
STRICT ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT AND
APPLICABLE BUILDING CODES. WHERE ACCESSIBILITY REQUIREMENTS MAY
VARY BY JURISDICTION, FOLLOW THE MOST STRINGENT REQUIREMENTS.
03.03. ADA MOUNTING HEIGHTS:ADA MOUNTING HEIGHTS: ALL MOUNTING HEIGHTS SHOWN ON THIS PAGE ARE TO BE MEASURED FROM THE TOP OF FLOOR FINISH (i.e. NOT FROM
SUBFLOOR). THE CONTRACTOR SHALL ACCOUNT FOR THE THICKNESS OF
THE SPECIFIED FLOOR FINISH WHEN ESTABLISHING THE MOUNTING HEIGHTS
OF ACCESSIBLE ITEMS.
A C C E S S I B L E E L E M E N T S N O T E S
04.04. ADA PLAN DIMENSIONS:ADA PLAN DIMENSIONS: ALL PLAN DIMENSIONS SHALL BE MEASURED
FROM THE FINSH FACE OF SCHEDULED WALL FINISH. THE CONTRACTOR
SHALL ACCOUNT FOR THE THICKNESS OF THE SPECIFIED WALL FINISH e.g., WALL TILE, WHEN ESTABLISHING PLAN DIMENSIONS AND CLEARANCES FOR
ACCESSIBLE ELEMENTS.
05.05. PLUMBING ELEMENTS AND FIXTURES:PLUMBING ELEMENTS AND FIXTURES: SEE PLUMBING DRAWINGS AND
SPECIFICATIONS FOR REQUIRED LOCATIONS AND MOUNTING HEIGHT OF
PLUMBING ELEMENTS AND FIXTURES. SHOULD CONFLICT EXIST BETWEEN
MOUNTING HEIGHTS AND/OR CLEARANCES INDICATED HEREIN AND THE
REQUIREMENTS OF THE PLUMBING ENGINEER, THE GENERAL CONTRACTOR
SHALL NOTIFY THE ARCHITECT FOR CLARIFICATION PRIOR TO ROUGH-IN.
06.06. ELECTRICAL DEVICES: ELECTRICAL DEVICES: SEE ELECTRICAL DRAWINGS AND SPECIFICATIONS
FOR REQUIRED MOUNTING HEIGHT OF ELECTRICAL DEVICES AND FIXTURES.
SHOULD CONFLICT EXIST BETWEEN MOUNTING HEIGHTS INDICATED HEREIN
AND THE REQUIREMENTS OF THE ELECTRICAL ENGINEER, THE GENERAL
CONTRACTOR SHALL NOTIFY THE ARCHITECT FOR CLARIFICATIONPRIOR TO
ROUGH-IN.
CONTROLS
AREA
ENTRANCE SIDE
SEAT WALLBACK WALL
TO
G
B
" A
FF
5" 18
" M
IN
ENTRANCE SIDE
AF
F
1' -6
FOLDING SHOWER
SEAT
3" MIN
AF
F
1' -6
" M
AX
A
FF
TO
G
B
6"MAX
6" MAX
MAX
2'-3"
HEAD WALL
A C C E S S I B L E R O L L - I N S H O W E R ( W I T H F O L D I N G S E A T )
SHOWER
CURTAIN ROD
" M
IN
TOWEL BAR AT ACCESSIBLE
LOCATIONS
MAX
4"
F.F.E.
SEE ELEVATIONS FOR
STANDARD BAR HEIGHT
M
IN
1' -6
" C
NT
RT
P.
3' -6
U.
N.
O
" M
AX
TO
L
EN
S
O F
ST
RO
BE
" M
IN
0"
M
AX
CLEAR
1'-6"MIN
9" MIN
CL
EQ EQ
CENTERED ON TACTILE
CHARACTERS
T O
P
UL
L
LE
VE
R
" A
FF
CH
AR
AC
TE
RS
VE
RI
FY
E
XA
CT
M
O
UN
TI
NG
H
EI
GH
T
IF CEILING DOES NOT PERMIT 80"
VERIFY HEIGHT W / ARCH
LATCH SIDE OR NEAREST
ADJACENT WALL
F I R E A L A R M W / S T R O B E
*NOTE: ROTATE ELECTRICAL COVER PLATES
HORIZONTAL IF COUNTERTOP IS ABOVE 42" HIGH
" T
O T
O P
E L E C T R I C A L D E V I C E SA D A I N T E R I O R S I G N A G E
F.F.E.
HEAD WALL
CONTROLS
AREA MAY BE ON
ANY SHOWER WALL
ENTRANCE
SIDE
END WALLBACK WALL
TO
G
B
" A
FF
5" 18 " M
IN
ENTRANCE
SIDE
" M
AX
A
FF
T O
G B
" A
FF
A C C E S S I B L E R O L L - I N S H O W E R ( W I T H O U T F O L D I N G S E A T )
SHOWER
CURTAIN ROD
M
IN6"MAX
6" MAX
6"MAX
3' -6
TOWEL BAR AT ACCESSIBLE
LOCATIONS
6" MAX
MAX
4"
F.F.E.
SEE ELEVATIONS FOR
STANDARD BAR HEIGHT
F.F.E.
TO
G
B
AF
F
CONTROL END WALL
TO
G
B
AF
F
A C C E S S I B L E T U B ( W I T H R E M O V A B L E S E A T )
TO
G
B
9"TO
GB
2' -1
1"
AF
F
BACK WALL
REMOVABLE TUB
SEAT,15 1/2" W
" A
FF
SE
AT
GB
24" MIN
" M
IN
G
B 5"
GB
12" MIN
12" FFW MAX
CONTROLS
AREA
HEAD WALLCONTROL
WALL
24" FFW MAX
GB
24" MAX
EDGE OF
TUB
EDGE OF
TUB
HEAD END WALL
3' -6
TOWEL BAR AT ACCESSIBLE
LOCATIONS
SHOWER
CURTAIN ROD
M
IN
MAX
4"
SEE ELEVATIONS FOR
STANDARD BAR HEIGHT
CONTROL END WALL
TO
G
B
" A
FF
GB
24" MIN
" M
IN
G
B 5"
CONTROLS
AREA
EDGE OF
TUB
TO
G
B 9"
TO
GB
" A
FF
PERMANENT TUB
SEAT, 16" MIN
12" FFW MAX
HEAD WALLCONTROL
WALL
15" FFW MAX
GB
24" MAX
BACK WALL ACCESSIBLE TUB
(WITH PERMANENT SEAT)
AF
F
SE
AT
1' -6
" 3' -6
TOWEL BAR AT ACCESSIBLE
LOCATIONS
SHOWER
CURTAIN ROD
M
IN
MAX
4"
A C C E S S I B L E T U B ( W I T H P E R M A N E N T S E A T )
F.F.E.
SEE ELEVATIONS FOR
STANDARD BAR HEIGHT
CONTROLS
AREA
ENTRANCE
SIDE
SEAT WALLBACK WALL
TO
GB
" A
FF
5" 18 " M
IN
ENTRANCE
SIDE
" A
FF
FOLDING
SHOWER
SEAT
3" MIN
" A
FF
" M
AX
A
FF
T O
G B
" A
FF
6" MAX 6" MAX
HEAD WALL
A C C E S S I B L E T R A N S F E R S H O W E R ( W I T H F O L D I N G S E A T )
SHOWER
CURTAIN ROD
M
IN
3' -6
TOWEL BAR AT ACCESSIBLE
LOCATIONS
GB EXTENT
1'-6 1/4"
MAX
4"
F.F.E.
SEE ELEVATIONS FOR
STANDARD BAR HEIGHT
TOILET
ACCESSORY
TYPE
DRAWING
DESIGNATION
PAPER TOWEL
DISPENSER
TOILET TISSUE
HOLDER
TOILET TISSUE
DISPENSER
WASTE
RECEPTACLE
SURFACE
MOUNTED
WASTE
RECEPTACLE
RECESSED
CL
TA03TA03
TA04TA04
TA05TA05
TA06TA06
TA07TA07
TA08TA08
TA01TA01
TA50TA50
CL
CL
" M
AX
TA02TA02 TA12TA12
TA13TA13
TA11TA11
" M
AX
" M
AX
" M
AX
WASTE
RECEPTACLE
TA14TA14
TA15TA15
TA16TA16
" M
AX
SOAP
DISPENSER
RECESSED
TA17TA17
TA18TA18
" M
IN
1- 1/
2" M
IN
GR
AB
B
AR
BO
GB
WC
8" FO
CL
WC
8" FO
AF
F
" M
AX
TO
GB
" M
IN
" M
IN
GR
AB
B
AR
BO
GB
1- 1/
2" M
IN
" M
AX
AF
F
TO
B O
TT
M
F
SP
O
O L
WC
8" FO
" M
IN
TO
GB
WC
8" FO HE
IG
HT
O F
O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
VERIFY EXACT MOUNTING
HEIGHT OF SUBMITTED
DEVICE WITH ARCHITECT
T Y P I C A L A C C E S S I B L E M O U N T I N G H E I G H T S
REFER TO PLAN &
SPEC FOR LENGTH
AND CONFIGURATION
GRAB BAR
HORIZONTAL
" M
AX
TA85TA85
BABY CHANGING
STATION
BO
TT
O F
RE
FL
EC
TI
VE
SU
RF
AC
E
MIRROR
ADA
" M
AX
T
O
TA30TA30
TA31TA31
TA77TA77
TA38TA38
TOILET SEAT
COVER
DISPENSER
" M
AX
ROBE HOOK AT
ACCESSIBLE
LOCATIONS (SEE
ELEVATIONS FOR
STANDARD HOOK HT)
TA33TA33
" M
AX
" M
IN
TA53TA53
TOWEL BAR
OR
TOILETRY SHELF
/3 2"
TA95TA95
MOP AND BROOM
HOLDER
TA23TA23
TA24TA24
TA25TA25
HT
. O
F O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
HE
IG
HT
O
F O
PE
RA
BL
E
DE
VI
CE
" M
AX
FIRE
EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FEFE FECFEC
18"
36"
42"
F.F.E.
E.W.C.
(ACCESSIBLE)
SP
O
UT
O
UT
LE
T
" M
AX
T
O
E.W.C.
(STANDARD)
SP
O
UT
O
UT
LE
T
3"
T O
" M
IN
" M
AX
HE
IG
HT
O F
O
PE
RA
BL
E
DE
VI
CE
HAND DRYER
TA80TA80
T.B.
TA54TA54 T.S.
" M
AX
SPECIMEN
PASS-THRU
CABINET
TA60TA60
TA65TA65
TA66TA66
TA74TA74
TA75TA75
TA76TA76
TA32TA32
TOILET
ACCESSORY
TYPE
DRAWING
DESIGNATION
F.F.E.16
MIRROR
FULL LENGTH
TA09TA09
TA10TA10 TA26TA2648"
" M
AX
M
AX
TA36TA36
SANITARY
NAPKIN
DISPOSAL
GRAB BAR
VERTICAL
TA23TA2318"
5" or or or or orTA74TA74or
NOTE: TOP OF GRAB BAR MAY BE 36"
WHERE USED WITH TANK TOILETS
A B B R E V I A T I O N S A N D A C R O N Y M S
AFF . . . . . . . . . . . . . . . . . . . . . . . ABOVE FINISHED FLOOR
BOGB . . . . . . . . . . . . . . . . . . . . . . BOTTOM OF GRAB BAR
FFE . . . . . . . . . . . . . . . . . . . . . . FINISHED FLOOR ELEVATION
FFW . . . . . . . . . . . . . . . . . . . . . . . . .FINISH FACE OF WALL
GB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GRAB BAR
HOD . . . . . . . . . . . . . . . . . . . . . HIGHEST OPERABLE DEVICE
MAX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAXIMUM
MIN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MINIMUM
TOGB . . . . . . . . . . . . . . . . . . . . . . . . . TOP OF GRAB BAR
WC . . . . . . . . . . . . . . . . . . . . . . . . . . . WATER CLOSET
W/ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITH
W/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHOUT
FO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FACE OF
(A)
FRONT APPROACH,
PULL SIDE
(B)
FRONT APPROACH,
PUSH SIDE
M
IN
(C)
FRONT APPROACH, PUSH
SIDE, DOOR PROVIDED W/
BOTH CLOSER AND LATCH
M
IN
" M
IN
(D)
HINGE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .