4-Attachment C - Forestmeadows Tennis Courts 17 18 Design.pdf

PDF 331 KB Posted

Attached to
Forestmeadows Tennis Courts 17 & 18 Conversion Project
Solicitation number
IFB-037-26-KM
Issued by
Leon County, Florida

About this file

This is a design specification attachment for the Forestmeadows Tennis Courts 17 & 18 Conversion Project in Tallahassee, Florida. The project involves comprehensive renovations to courts 17 and 18 at the Forestmeadows Parks and Recreation Center located at 4750 Meridian Road. The scope of work includes installation of three steel posts (4-inch diameter, Schedule 40, 15 feet long) with concrete footers for divider nets between the courts, installation of nylon-coated stainless steel cable with crank-operated divider nets, construction of a 6-inch trench drain system connected to a new 15-inch ADS drainpipe discharging to an existing catch basin, and extension of existing chain link fencing to specified distances from the new courts. Additional work includes adjusting the concrete ramp for ADA compliance, enlarging an existing gate opening on the east side to 12 feet, installation of a walk-through gate with Strong Arm latch, and installation of seven water irrigation heads (Hunter I-25) positioned at corners and between courts.

The specification requires the contractor to provide positive drainage away from the courts along the reconstructed perimeter and implement erosion and sediment control best management practices in accordance with NPDES General Permit requirements and any permits obtained by the City from Growth Management, Northwest Florida Water Management District, FDEP, or the Army Corps of Engineers. The trench drain shall be Zurn Z882 Perma Trench or approved equal, with all pipe constructed per ADS specifications with minimum one-foot cover. The contractor must locate the existing water line for connection to the courts' irrigation system and construct a bordered rectangular area at the inside perimeter using 8-inch solid pavers with a cleanout installed. A concrete curb is to be constructed 3 feet from the fence at the south side with number 57 stone installed between fence and curb atop buried lines.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Court 17 Court 18

Install 3 Steel Posts, 4” Dia. Each, Schedule 40, 15’ Long For Divider Nets outside the courts. Construct 3’X3’X4’ Deep Conc. Footer for Each Post. Provide 3/8” Dia. Nylon-Coated SS Cable atop Posts and Install 2 Divider Nets Per Court Extended to Ground Level. Cable Shall Operate via Crank (Similar to Existing Dividers Onsite). Dividers are to be Installed Between Courts 17 & 18.

Sl op e 0.

e ac h co ur t

Const. 6” Trench Drain & Connect to new 15” ADS pipe and discharge at Exist. Catch Basin @ NW corner.

Discharge from T.D. 8’ to 12’

Install 15” ADS Drainpipe and discharge to exist. Catch basin.

Steel Post

Construct a bordered rectangular area at the inside perimeter of the courts using 8” solid pavers.

Install a cleanout.

Extend South, North & West exist. Chain link Fence to 10 feet from new courts’ elevation.

Extend West exist. Chain link Fence to 10 feet from new courts’ elevation.

Adjust new concrete ramp to maintain ADA entrance and transition at main sidewalk.

Exist. Catch basin.

Sl op e 0.

e ac h co ur t

Increase size of Exist. Gate opening at East side to 12 feet.

Install a walk-through gate W/ Strong Arm latch. Size of gate to remain unchanged.

Install 7 water irrigation heads (Hunter I-25) at each corner and 3 between the courts.

Construct concrete curb 3 feet from fence at South side and install 57 stone between fence and curb atop the buried lines.

1. TRENCH DRAIN SHALL BE Z882 PERMA TRENCH BY ZURN OR APPROVED EQUAL.

2. ALL PIPE SHALL BE CONSTRUCTED IN ACCORDANCE WITH ADS SPECIFICATIONS. (MIN.

COVER = 1ft)

3. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE AWAY FROM THE COURTS ALONG

THE RECONSTRUCTED COURTS' PERIMETER.

4. THE CONTRACTOR WILL PROVIDE EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP) AS NECESSARY TO PREVENT LOSS OF SEDIMENT

FROM THE PROJECT AND INTO EXISTING STORMWATER CONVEYANCES. ALL EROSION AND SEDIMENT CONTROL WILL BE IN ACCORDANCE WITH THE NPDES GENERAL PERMIT OR ANY PERMIT OBTAINED BY THE CITY FOR CONSTRUCTION OF THIS PROJECT FROM ANOTHER AGENCY INCLUDING BUT NOT LIMITED TO GROWTH MANAGEMENT, NORTHWEST FLORIDA WATER MANAGEMENT DISTRICT, FDEP, OR ACOE.

Locate exist. water line onto which to connect courts’ irrigation boxes.

Extend East exist. Chain link Fence to 4 feet from new courts’ elevation.

ATTACHMENT 1

FORESTMEADOWS COURTS 17 & 18