S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_11 of 11.pdf

PDF 8 MB Posted

Attached to
Y1PZ--Fort Sill NC Gravesite Expansion and FCA Deficiencies 920CM3006
Solicitation number
36C78626B0030
Issued by

About this file

This is a comprehensive set of electrical and Information Technology (IT) bid documents and design specifications for the Fort Sill Gravesite Expansion and Cemetery FCA Improvements project located in Elgin, Oklahoma, issued by the National Cemetery Administration under the U.S. Department of Veterans Affairs. The project number is 920CM3006, with an issue date of October 12, 2026 (or July 1, 2026 for certain sheets), and the Architect/Engineer of Record is JD Engineering, PC, located in Hamilton, Montana, with Sean Fitzpatrick as the key contact (720.491.7559). The Department of Veterans Affairs project manager and Contracting Officer's Representative (COR) is Homayoun Kazemipour.

The documents contain detailed electrical installation plans, fire alarm system installation plans for multiple buildings (Administration Building, Maintenance Building, and Public Information Building), panel schedules, security system specifications, and comprehensive IT infrastructure requirements. Key electrical work includes irrigation controller installations with conduit routing specifications (1-inch conduits with #8 AWG copper conductors), pull boxes, and underground/aboveground conduit systems complying with NEC, NFPA, and OSHA standards. Fire alarm systems include addressable fire alarm control panels, smoke alarms, pull stations, and audio-visual notification devices. IT infrastructure requires a new telecommunications room with cable trays, network racks, grounding systems, Cat6A cabling, fiber optic connections, access control systems, and various network equipment including UPS systems, patch panels, and PDUs. All work must be performed in coordination with other trades, use UL-approved/listed materials, follow manufacturer specifications, and comply with applicable codes and local utility company requirements. The contractor must provide all necessary materials for complete and operational systems at no additional cost, with specific attention to grounding per Specification 260526 and proper bonding of equipment.

View the file

Other files

File Type Posted
S06_36C78626B0030 0005.pdf PDF
S06_36C78626B0030 0004.pdf PDF
S06_36C78626B0030 0003.pdf PDF
S02_Attachment-14_IFB Contractor Cost Estimate Worksheet.xlsx XLSX spreadsheet
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_6 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_1 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_2 of 11.pdf PDF
S05_Prebid RFI_26B0030 Fort Sill_Gravesite Expansion and FCA.pdf PDF
S02_Attachment-14_IFB Contractor Cost Estimate Worksheet.xlsx XLSX spreadsheet
S06_Fort Sill NC_920CM3006_Combined Specifications_Rev 01.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_8 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_10 of 11.pdf PDF
S06_36C78626B0030 0002.pdf PDF
P07_WD_OK20260043.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_9 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_4 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_5 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_7 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_3 of 11.pdf PDF
S06_36C78626B0030 0001.pdf PDF
S04_Ft Sill_Site Visit Attendance.pdf PDF
S02_Att 4_Fort Sill NC 920CM3006 Plan Set Reduced 2 of 11.pdf PDF
S02_Att 1_920CM3006 Fort Sill NC IFB SOW_Final.pdf PDF
P07_WD_OK20260023.pdf PDF
S02_Att 6_Fort Sill NC 920CM3006 Plan Set Reduced 4 of 11.pdf PDF
S02_Att 2_Fort Sill NC 920CM3006 Combined Specifications.pdf PDF
S02_Att 5_Fort Sill NC 920CM3006 Plan Set Reduced 3 of 11.pdf PDF
S02_Att 3_Fort Sill NC 920CM3006 Plan Set Reduced 1 of 11.pdf PDF
S02_36C78626B0030_Final.pdf PDF
S02_Att 11_Fort Sill NC 920CM3006 Plan Set Reduced 9 of 11.pdf PDF
S02_Att 10_Fort Sill NC 920CM3006 Plan Set Reduced 8 of 11.pdf PDF
S02_Att 9_Fort Sill NC 920CM3006 Plan Set Reduced 7 of 11.pdf PDF
S02_Att 12_Fort Sill NC 920CM3006 Plan Set Reduced 10 of 11.pdf PDF
S02_Att 13_Fort Sill NC 920CM3006 Plan Set Reduced 11 of 11.pdf PDF
S02_Att 7_Fort Sill NC 920CM3006 Plan Set Reduced 5 of 11.pdf PDF
S02_Att 8_Fort Sill NC 920CM3006 Plan Set Reduced 6 of 11.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

ELECTRICAL SITE PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

10/12/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

13. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS

AND A SEPARATE GREEN INSULATED EQUIPMENT GROUND CONDUCTOR TO

ENSURE SAFETY AND COMPLIANCE.

KEYED NOTES

1. EXISTING 208/120V ELECTRICAL PANEL LPP. USE EXISTING SINGLE PHASE 20A

CIRCUIT BREAKER #16 BREAKER POSITION TO PROVIDE 120V SOURCE TO

IRRIGATION CONTROLLER H.

2. INSTALL NEW (2) 1'' CONDUITS ((1) FOR POWER AND (1) SPARE) FROM ELECTRICAL

PANEL LPP TO PULLBOX #1. HORIZONTAL DIRECTIONAL BORE ROAD CROSSING TO

INSTALL CONDUITS. INSTALL SEPARATE (1) #8 AWG CU CONDUCTORS FOR PHASE,

NEUTRAL, AND GROUND CONDUCTORS WITHIN SAME CONDUIT FOR IRRIGATION

CONTROLLER H.

3. INSTALL PULLBOX #1 (PB1) TO FACILITATE ROAD CROSSING AND CONDUIT

DIRECTION CHANGE. INSTALL PULL STRING AND CAP ENDS OF SPARE 1" CONDUIT.

PULLBOX TO BE INSTALLED 6' FROM CURB EDGE TO AVOID FUTURE SIDEWALK.

4. INSTALL NEW (2) 1" CONDUITS ((1) FOR POWER AND (1) SPARE) FROM PULLBOX #1

TO PULLBOX #2. INSTALL SEPARATE (1) #8 AWG CU CONDUCTORS FOR PHASE,

NEUTRAL, AND GROUND CONDUCTORS WITHIN SAME CONDUIT FOR IRRIGATION

CONTROLLER H. PULLBOX TO BE INSTALLED 6' FROM CURB EDGE TO AVOID

FUTURE SIDEWALK.

5. INSTALL PULLBOX #2 (PB2) TO FACILITATE CONDUIT INSTALLATION. INSTALL PULL

STRING AND CAP ENDS OF SPARE 1" CONDUIT. SPARE CONDUIT ENDS HERE.

PULLBOX TO BE INSTALLED 6' FROM CURB EDGE TO AVOID FUTURE SIDEWALK.

6. INSTALL NEW (1) 1'' CONDUIT FROM PULLBOX #2 TO IRRIGATION CONTROLLER H.

INSTALL SEPARATE (1) #8 AWG CU CONDUCTORS FOR PHASE, NEUTRAL, AND

GROUND CONDUCTORS WITHIN CONDUIT. CONDUIT TO BE INSTALLED 6' FROM

CURB EDGE TO AVOID FUTURE SIDEWALK.

7. IRRIGATION CONTROLLER H APPROXIMATE LOCATION. REFER TO "L" SHEETS FOR

INSTALLATION REQUIREMENTS.

N

0 4 8

1 INCH = 4 FEET

SCALE: 1'' = 100'-0''

ELECTRICAL SITE PLANF3

EP103

AMENDMENT 001 10/12/20261

BACKFILL TRENCHES

TO SUB-GRADE

WARNING TAPE

POWER CONDUIT (REFER TO DETAIL

C6), SIZE INDICATED ON SITE PLAN

(TYP), CONDUIT SIZE VARIES.

SAND BED

TRENCH

FINAL GRADE ±3''

12''

GENERAL BACKFILL

12''MINIMUM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

10/12/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

SCALE: NTS

UNDERGROUND CONCRETE PULLBOX-TURF AREA DETAILC1

SCALE: NTS

2-WAY DUCT LINEC6

SCALE: NTS

IRRIGATION CONTROLLER TRENCH AND CONDUIT DETAILSE5

KEYED NOTES

1. DUCT BANK SITS 24'' BELOW THE SURFACE.

2.

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, LOCAL CODES, AND OSHA. THE

CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL

EQUIPMENT AND CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM

TO OTHER DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A

COMPLETE, FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. MAINTAIN 10' SEPARATION FROM EACH DRIVER GROUND ROD.

13. 20A CIRCUITS ARE TO CONSIST OF (1) #12 AWG CU CONDUCTOR AND (1) #12 AWG

CU NEUTRAL AND (1) #12 CU GROUND PER CONDUIT. NO MORE THAN THREE

CIRCUITS IN A SINGLE CONDUIT.

14. 30A CIRCUITS ARE TO CONSIST OF (1) #10 AWG CU CONDUCTOR AND (1) #10

AWG CU NEUTRAL AND (1) #12 CU GROUND PER CONDUIT. NO MORE THAN

THREE CIRCUITS IN A SINGLE CONDUIT.

EP601

IRRIGATION CONTROLLER

ELECTRICAL INSTALLATION PLAN

AMENDMENT 001 10/12/20261

225A RATED MAINLUG PANELBOARD

SQUARD D, NQOD, 42 POSITION

208/120V, 3 PHASE

4 WIRE, SURFACE MOUNTED

A

PANEL LPA

FUSEBOX 1

RECPT. HONOR GUARD

RECPT. FOREMAN OFFICERECPT. HONOR GUARD

CU-01

NEW TOTAL

RECPT. VESTIBULE RECPT. FOREMAN OFFICE

GFCI T-SIDEEWC

ICE MACHINE HEATER

HEATERHEATER

HEATER UNDERCOUNTER

RECPT. COPIEROUTSIDE RECPT.

EMERGENCY LIGHTS/ MECH. ROOM

CARETAKER OFFICE

WATER HEATER

WATER HEATER

WATER HEATER

IT RACK (PSU)

SPARE

HW HEATER

LOAD SERVED

TOTAL NEW CONNECTED AMPS PER PHASE

LOAD SERVEDB C A B C

7.1

7.1

12.0

31.1 31.1 24.0

A: 31.1 B: 32.6 C: 24.0

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

PHASE

0.0

A

41 42

PANEL LPA

FUSEBOX 2

HONOR GUARD LIGHTS

BATH LIGHTS

NEW TOTAL

LOAD SERVED

TOTAL NEW CONNECTED AMPS PER PHASE

20 20

LOAD SERVEDB C A B C

A: 0.0 B: 16.0 C: 0.0

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

PHASE

RECPT MULTI PURPOSE ROOM

100A RATED EXTERIOR PANEL

100A MAIN BREAKER, 36 POSITION

208/120V, 3 PHASE

4 WIRE, SURFACE MOUNTED

A

PANEL LPP

COMMITTAL SHELTER NO LABEL

NEW TOTAL

UNIT HEATER

RECPT. ELECTRIC ROOM

IRR CENTRAL NORTH PANEL

SPARELIGHTS BATHROOM

TIME CLOCK OUTDOOR LIGHTS

SECURITY CAMERALIGHTING ELECTRIC ROOM

WATER COOLER

WATER HEATER

IRR CENTRAL, SOUTH PANEL, PIC

RECPT. MEN BATH, STORAGE

IRR, SEC 2 & 3

LIGHTS OFFICE IRRIGATION CONTROLLER H

MAIN

LOAD SERVED

TOTAL NEW CONNECTED AMPS PER PHASE

20 20

LOAD SERVEDB C A B C

3.0

A: 0.0 B: 0.0 C: 3.0

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

PHASE

0.0 0.0

RECPT. OFFICE

EXHAUST FAN

GFI BATHROOMS

QUAD RECPT. ELECTRIC RM

0.00.0 0.0

225A RATED MAINLUG PANELBOARD

SQUARD D, NQOD, 42 POSITION

208/120V, 3 PHASE

4 WIRE, SURFACE MOUNTED

RECPT MULTI PURPOSE ROOM

RECPT DIRECTORS OFFICE

RECPT DIRECTORS OFFICE

RECPT

RECPT

RECPT FRONT OFFICE

RECPT FRONT OFFICE

RECPT FRONT OFFICE

RECPT FRONT OFFICE

RECPT FRONT OFFICE

RECPT FRONT OFFICE

RECPT

RECPT

RECPT

RECPT

RECPT

RECPT

RECPT MAIN OFFICE

TIME CLOCK

BREAK ROOM LIGHTS

OPERATIONAL LIGHTS

LOBBY LIGHTS

CONFERENCE ROOM LIGHTS

DIRECTOR OFFICE LIGHTS

REFRIGERATOR

RECPT BREAKROOM GFCI

RECPT BREAKROOM GFCI

RECPT BREAKROOM

RECPT BREAKROOM

RECPT BREAKROOM

HALL LIGHTS

RECPT MENS ROOM GFCI

RECPT BREAKROOM

FIRE ALARM PANEL

SECURITY PANEL

RECPT ELECTRICAL ROOM

RECPT MAINT. OFFICE

RECPT TR ROOM16.0

EXTERIOR RECEPTACLE

BLANK

SPARE

12.0

SPARE

1.5 0.0

OUTSIDE GFI

60 35

60 35

60 35

3.0

RECEPTACLE OUTDOORE

1.5

12.0

12.0

12.0

12.0

IT RACK (PSU)

PANEL SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

SCALE: NTS

ADMIN BLDG PANEL LPA - FUSEBOX 1 SCHEDULEC1

EP60

SCALE: NTS

ADMIN BLDG PANEL LPA - FUSEBOX 2 SCHEDULEC5

SCALE: NTS

P.I.C. BUILDING PANEL LPP SCHEDULEF1

KEYED NOTES

1. NO NEW CIRCUITS ARE BEING ADDED, FACP CIRCUIT NUMBER COULD NOT BE

DETERMINED BASED OF PANEL SCHEDULE. CONTRACTOR TO CONFIRM CIRCUIT

NUMBER FOR FACP AND REWIRE TO NEW FACP.

MULTI-PURPOSE RM

O

PER

ATIO

N

AL C

EN

TER

OFF. STOR.

H.A.C.

LOBBY

VESTIBU

LE

VESTIBULE

M

EN

'S LO

C

KER

R

O O

M

W O

M

EN

'S LO

C

KER

R

O O

M

BOOT WASH

VESTIBULE

MAINT. OFF.

MECHANICAL

CORRIDOR

FOREMAN

HONOR GUARD

ELEC. RM.

RESTROOM

LUNCHROOM

DIRECTOR

RESTROOM

GENERAL OFFICE

ADMINISTRATION BLDG

FIRE ALARM INSTALLATION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.

EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

13. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

14. SMOKE ALARMS MUST BE INSTALLED IN LOCATIONS THAT DO NOT OBSTRUCT OR

INTERFERE WITH THE OPERATION OR PLACEMENT OF ANY EQUIPMENT.

15. REUSE EXISTING CONDUIT WITH FIRE ALARM WIRING FOR INTERCONNECTION OF

AUDIO VISUAL ALARMS TO ADDRESSABLE FIRE ALARM CONTROL PANEL.

16. REUSE EXISTING CONDUIT WITH FIRE ALARM WIRING FOR INTERCONNECTION OF

PULL STATION TO THE ADDRESSABLE FIRE ALARM CONTROL PANEL.

N

0 8 16

1 INCH = 8 FEET

SCALE: 1'' = 8'-0''

ADMIINISTRATION BUILDING FIRE ALARM INSTALLATION PLANE3

FIRE DETECTION AND ALARM SCHEDULE

SYMBOLS ITEM DESCRIPTION MANUFACTURER CATALOG

NUMBER

FIRE/SMOKE ALARM SIMPLEX 4098-9601

PULLSTATION SIMPLEX 2099-975

FIRE ALARM ADDRESSABLE SYSTEM SIMPLEX 4010-6401

AUDIO AND VISUAL NOTIFICATION

NODE SIMPLEX S59AV-0001

FIRE ALARM HEAT DETECTOR SIMPLEX 4098-9734

A

B

C

D

E

A

A A

E-101

A

A

A

A

A

A

A

A

A

E

D

B

E

E

D

D

B

D

D

D

E D

E

B

D

D

D D

D

E

D

B

D

B

D

E

D

B

D

D

E

D

D

D

A

A

OUTSIDE ROOM

STORAGE

FLAMMABLE

STORAGE

HEAVY & ROUTINE

MAINTENANCE BAYS

PARTS AND TOOLS

ROOM

MAINTENANCE BLDG

FIRE ALARM INSTALLATION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

0 4 8

1 INCH = 4 FEET

N

SCALE: 1'' = 4'0''

MAINTENANCE BUILDING FIRE ALARM INSTALLATION PLANE3

D

E-102

FIRE DETECTION AND ALARM SCHEDULE

SYMBOLS ITEM DESCRIPTION MANUFACTURER CATALOG

NUMBER

FIRE/SMOKE ALARM SIMPLEX 4098-9601

PULLSTATION SIMPLEX 2099-975

FIRE ALARM ADDRESSABLE SYSTEM SIMPLEX 4010-6401

AUDIO AND VISUAL NOTIFICATION

NODE SIMPLEX S59AV-0001

FIRE ALARM HEAT DETECTOR SIMPLEX 4098-9734

A

B

C

D

E

B

A

A

A

A A

A

B

B B

D

D D

D

D

D D

D

D

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.

EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

13. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

14. SMOKE ALARMS MUST BE INSTALLED IN LOCATIONS THAT DO NOT OBSTRUCT OR

INTERFERE WITH THE OPERATION OR PLACEMENT OF ANY EQUIPMENT.

15. REUSE EXISTING CONDUIT WITH FIRE ALARM WIRING FOR INTERCONNECTION OF

AUDIO VISUAL ALARMS TO ADDRESSABLE FIRE ALARM CONTROL PANEL.

16. REUSE EXISTING CONDUIT WITH FIRE ALARM WIRING FOR INTERCONNECTION OF

PULL STATION TO THE ADDRESSABLE FIRE ALARM CONTROL PANEL.

PUBLIC INFORMATION BLDG (PIC)

FIRE ALARM INSTALLATION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

N

0 8 16

1 INCH = 8 FEET

SCALE: 1'' = 8'-0''

PUBLIC INFORMATION BUILDING (PIC) FIRE ALARM INSTALLATION PLANE3

B

E-103

FIRE DETECTION AND ALARM SCHEDULE

SYMBOLS ITEM DESCRIPTION MANUFACTURER CATALOG

NUMBER

FIRE/SMOKE ALARM SIMPLEX 4098-9601

PULLSTATION SIMPLEX 2099-975

FIRE ALARM ADDRESSABLE SYSTEM SIMPLEX 4010-6401

AUDIO AND VISUAL NOTIFICATION

NODE SIMPLEX S59AV-0001

FIRE ALARM HEAT DETECTOR SIMPLEX 4098-9734

A

B

C

D

E

D

D

D

D

D

D

B

B

BD

A

E

E

B

A

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.

EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

13. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

14. SMOKE ALARMS MUST BE INSTALLED IN LOCATIONS THAT DO NOT OBSTRUCT OR

INTERFERE WITH THE OPERATION OR PLACEMENT OF ANY EQUIPMENT.

15. REUSE EXISTING CONDUIT WITH FIRE ALARM WIRING FOR INTERCONNECTION OF

AUDIO VISUAL ALARMS TO ADDRESSABLE FIRE ALARM CONTROL PANEL.

16. REUSE EXISTING CONDUIT WITH FIRE ALARM WIRING FOR INTERCONNECTION OF

PULL STATION TO THE ADDRESSABLE FIRE ALARM CONTROL PANEL.

1.

2.

3.

4.

5.

6.

KEYNOTES:

PROVIDE JUNCTION BOXES IN THE DOOR FRAME WHERE SHOWN ON THIS DETAIL. ROUGH-IN SHALL BE PROVIDED WHETHER THE CURRENT SECURITY SCHEME UTILIZES THEM OR NOT. ALL CONDUITS SHALL BE EMT CONDUIT UNLESS OTHERWISE NOTED. FLEXIBLE CONDUIT OF ANY TYPE WILL NOT BE ACCEPTED. COORDINATE INSTALLATION WITH ON-SITE DOOR FRAME INSTALLATION CONTRACTOR.

ALL DOOR POSITION SWITCHES ARE REQUIRED TO BE RECESSED UNLESS OTHERWISE NOTED. ELECTRIC HINGE MONITORS ARE NOT AN

ACCEPTABLE REPLACEMENT FOR THE RECESSED DOOR POSITION SWITCH.

4" SQUARE BACKBOX WITH SINGLE GANG PLASTER RING. PROVIDE 2 1/2" DEEP MASONRY BOX WHERE APPLICABLE. REFER TO FLOOR PLAN(S) FOR

ACTUAL CREDENTIAL READER TYPE AND ROUGH-IN LOCATIONS.

CONDUIT SHALL ROUTE FROM THE CREDENTIAL READER TO THE SECURED SIDE OF THE DOOR. CONDUIT SHALL ROUTE TO THE NEAREST SECURITY

PANEL.

MOUNT A MINIMUM 4" SQUARE 2-1/8" DEEP JUNCTION BOX WITH BLANK COVER PLATE ON THE SECURED SIDE OF THE DOOR ABOVE ACCESSIBLE CEILING. INSTALLING CONTRACTOR SHALL SIZE THE JUNCTION BOXES PER SYSTEM INSTALLATION REQUIREMENTS AND APPLICABLE CODES.

MAINTAIN ACCESS TO THE JUNCTION BOX.

CONDUIT SHALL ROUTE TO THE NEAREST ACCESSIBLE CEILING. PROVIDE A NYLON BUSHING ON CONDUIT END.

DOOR FRAME ROUGH-IN DIAGRAM

(ALL SINGLE DOORS)

FINISHED ACCESSIBLE

CEILING

FINISHED FLOOR

1/2" EMT CONDUIT

MINIMUM (TYP.)

3/4" EMT CONDUIT

MINIMUM TO ABOVE THE

ACCESSIBLE CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.

EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

13. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

SCALE: NTS

MOUNTING HEIGHTS FOR WALL MOUNTED DEVICESC1

MOUNTING HEIGHT AND

IT ROOM DOOR FRAME

E-501

SCALE: NTS

TR DOOR FRAMEE2

KEYED NOTES

1. PROVIDE JUNCTION BOXES IN THE DOOR FRAME WHERE SHOWN ON THIS DETAIL.

ROUGH-IN SHALL BE PROVIDED WHETHER THE CURRENT SECURITY SCHEME

UTILIZES THEM OR NOT. ALL CONDUITS SHALL BE EMT CONDUIT UNLESS

OTHERWISE NOTED. FLEXIBLE CONDUIT OF ANY TYPE WILL NOT BE ACCEPTED.

COORDINATE WITH ON-SITE FRAME INSTALLATION CONTRACTOR.

2. ALL DOOR POSITION SWITCHES ARE REQUIRED TO BE RECESSED UNLESS

OTHERWISE NOTED. ELECTRIC HINGE MONITORS ARE NOT AN ACCEPTABLE

REPLACEMENT FOR THE RECESSED DOOR POSITION SWITCH.

3. 4'' SQUARE BACK BOX WITH SINGLE GANG PLASTER RING. PROVIDE 2 1/2'' DEEP

MASONRY BOX WHERE APPLICABLE. REFER TO FLOOR PLAN(S) FOR ACTUAL

CREDENTIAL READER TYPE AND ROUGH-IN LOCATIONS.

4. CONDUIT SHALL ROUTE FROM THE CREDENTIAL READER TO THE SECURED SIDE

OF THE DOOR. CONDUIT SHALL ROUTE A MINIMUM OF 12'' FROM THE JUNCTION

BOX, TO THE NEAREST SERVING SECURITY PANEL. PROVIDE A NYLON BUSHING ON

CONDUIT END.

5. MOUNT A MINIMUM 4'' SQUARE 2-1/8'' DEEP JUNCTION BOX WITH BLANK COVER

PLAT ON THE SECURED SIDE OF THE DOOR ABOVE ACCESSIBLE CEILING.

INSTALLING CONTRACTOR SHALL SIZE THE JUNCTION BOXES PER INSTALLATION

REQUIREMENTS AND APPLICABLE CODES, MAINTAIN ACCESS TO THE JUNCTION

BOX.

6. PROVIDE A HORIZONTALLY MOUNTED SINGLE GANG BACK BOX FOR THE REQUEST

TO EXIT SENSOR. REFER TO THE CONTROLLED SECURITY SCHEME SCHEDULE FOR

DOORS THAT REQUIRE THIS ROUGH-IN.

7. CONDUIT SHALL ROUTE A MINIMUM OF 12'' FROM THE JUNCTION BOX TO THE

NEAREST SECURITY PANEL. PROVIDE A NYLON BUSHING ON CONDUIT END.

TELECOMMUNICATION OUTLET, FLUSH MOUNTED, 4" SQUARE OUTLET BOX WITH PLASTER

RING. NUMBER WHERE SHOWN INDICATES THE NUMBER OF CATEGORY 6 JACKS IN THE

OUTLET BOX. WHERE NUMBER IS NOT SHOWN, PROVIDE TWO DATA JACKS, ONE VOICE

JACK, ALL CATEGORY 6, AND ONE BLANK IN THE OUTLET BOX WITH STAINLESS STEEL

COVER PLATE. ARRANGE SO THAT DATA JACKS ARE ON TOP.

SAME AS ABOVE EXCEPT OUTLET BOX MOUNTED AT 42" ABOVE FINISHED FLOOR OR 3"

ABOVE COUNTER. COORDINATE WITH ARCHITECTURAL DRAWINGS.

SAME AS ABOVE EXCEPT OUTLET BOX MOUNTED 60" ABOVE FINISHED FLOOR.

TELECOMMUNICATIONS BACKBOARD, 4'x8'x3/4", FIRE-RETARDANT PLYWOOD, PAINT

ALL SIDES AND EDGES WITH GRAY PAINT. ALIGN EIGHT FOOT SIDE VERTICALLY.

TELECOMMUNICATION FLOOR RACK, STEEL, 72"Hx19"W, WITH CABLING MANAGEMENT

SYSTEM.

1. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND REMOVE WIRING

COMPLETELY FROM THE ABANDONED CONDUITS.

2. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT PROTECTIVE DEVICE. COMPLETELY REMOVE ALL ABANDONED WIRING - IF ANY.

DEMOLITION

ELECTRICAL

GENERAL NOTES

INFORMATION TECHNOLOGY/DATA SYSTEM LEGEND ABBREVIATIONS

L21-20 RECEPTACLE

RACK PDU (rPDU)

DUAL-POWERED IT/NETWORKING

EQUIPMENT

SERVER CABINET WITH rPDUs

AND EQUIPMENT

UPS (RACK-MOUNTED)

DISTRIBUTION PANEL

1. LED LIGHTING PLACED IN AISLES DIRECTLY IN FRONT OF AND BEHIND CABINET ROWS.

2. LIGHTING OPERATED BY MOTION SENSOR PER CABINET ROW OR SECTION.

3. 500 LUMENS IN THE HORIZONTAL PLANE AND 200 LUMENS IN THE VERTICAL PLANE REQUIRED MEASURED AT 3FT AFF IN FRONT OF AND BEHIND EQUIPMENT CABINETS.

LIGHTING

1. MINIMUM QTY TWO 120V 20A CONVENIENCE POWER OUTLETS PER WALL; PLACEMENT DETERMINED BY OTHERS.

2. PRIMARY BONDING BUSBAR; PLACEMENT DETERMINED BY OTHERS.

3. SECONDARY BONDING BUSBAR; PLACEMENT DETERMINED BY OTHERS.

4. SERVICE PANEL FOR A-SIDE POWER, GENERATOR BACK IF THE FACILITY HAS GENERATION CAPABILITIES. SHALL BE EQUIPPED WITH POWER METER; PLACEMENT PER

OTHERS.

5. SERVICE PANEL B-SIDE POWER, GENERATOR BACKED IF POSSIBLE. SHALL BE EQUIPPED WITH POWER METER; PLACEMENT PER OTHERS.

6. 20A 208V THREE- PHASE TWIST LOCK RECEPTACLE (L21-20R); 8.5FT AFF {WYE(5-WIRE)} COORDINATE INSTALLATION LOCATION WITH TELECOMMUNICATIONS CONTRACTOR.

7. 30A 208V THREE-PHASE TWIST LOCK RECEPTACLE (L21-20R); 8.5FT AFF {WYE(5-WIRE)} COORDINATE INSTALLATION LOCATION WITH TELECOMMUNICATIONS CONTRACTOR.

8. POWER BUSWAY (VOLTAGE AND AMPERAGE TO SUPPORT ADEQUATE SINGLE & DOUBLE BREAKER 208V, 20A, L21-20R BUSWAY TAPS PER SERVER ROW) FED FROM A-SIDE

SOURCE.

9. POWER BUSWAY (VOLTAGE AND AMPERAGE TO SUPPORT ADEQUATE SINGLE & DOUBLE BREAKER 208V, 20A, L21-20R BUSWAY TAPS PER SERVER ROW) FED FROM B-SIDE

SOURCE.

10. POWER BUSWAY (VOLTAGE AND AMPERAGE TO SUPPORT ADEQUATE SINGLE BREAKER 208V, 20A, L21-20R BUSWAY TAPS PER SERVER ROW) FED FROM A-SIDE SOURCE.

11. POWER BUSWAY (VOLTAGE AND AMPERAGE TO SUPPORT ADEQUATE SINGLE BREAKER 208V, 20A, L21-20R BUSWAY TAPS PER SERVER ROW) FED FROM B-SIDE SOURCE.

12. BLUE CABLE PATCH FOR A-SIDE UPS.

13. YELLOW CABLE PATH FOR B-SIDE UPS.

DATA TELECOM OUTLET

TELECOM OUTLET FLOOR

MOUNTED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

INFORMATION TECHNOLOGY (IT)

SYMBOLS & NOTES

T-001

IT DEMOLITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.

EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

13. UNDERGROUND FACILITIES AND CABLE LOCATIONS ARE ESTIMATED.

UNDERGROUND LOCATES OF EXISTING UNDERGROUND FACILITIES IS REQUIRED

TO CONFIRM ROUTE.

14. COORDINATE WITH VA OIT AND INCORPORATE A PHASING PLAN FOR THE

RELOCATION OF THE EQUIPMENT IN THIS CABINET TO THE NEW TR RACK. ALL

SYSTEM MUST REMAIN OPERATIONAL UNTIL CUT OVER TO THE NEW TR RACK.

15. ALL EXISTING WAO MUST REMAIN OPERATIONAL UNTIL CUT OVER TO NEW PATCH

PANELS INSTALLED IN THE NEW TR RACK.

SCALE: NTS

ADMIN BLDG SERVER RACKD2 SCALE: NTS

ADMIN BLDG PATCH PANELD6

TD101

ROUTER

SWITCH

DELL STORAGE

DELL VOICE GATEWAY

(ANALOG TELEPHONE TO VOIP)

TELECOMMUNICATION

SINGLE LINE DIAGRAM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, LOCAL CODES, AND OSHA. THE

CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL

EQUIPMENT AND CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM

TO OTHER DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A

COMPLETE, FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES.

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE MOUNTING HARDWARE AS REQUIRED AT NO

ADDITIONAL COST.

7. COMPLY WITH NFPAs, UFAS, OTHER APPLICABLE CODES, AND AUTHORITY HAVING

JURISDICTION OR AS SHOWN ON DRAWINGS FOR MOUNTING HEIGHTS OF ALL

ELECTRICAL EQUIPMENT AND DEVICES. MAINTAIN MINIMUM WORKING

CLEARANCES REQUIRED BY NEC AND LOCAL UTILITY COMPANY.

8. FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATIONS, UNLESS

INDICATED OR SPECIFIED OTHERWISE. INFORM VA AND OBTAIN WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER REPRESENTATIVE IF CONFLICTS

EXIST BETWEEN MANUFACTURERS REQUIREMENTS AND CONTRACT DOCUMENTS

PRIOR TO THE START OF THE AFFECTED WORK.

9. ALL MATERIALS AND EQUIPMENT SHALL BE HEAVY DUTY, UL APPROVED/LISTED

AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

10. PROVIDE ALL GROUNDING AS PER SPECIFICATION 260526.

11. ITEMS OMITTED FROM EITHER THE SPECIFICATIONS OR THE DRAWINGS, BUT ARE

SHOWN OR DESCRIBED IN THE OTHER TRADES, AND ALL ITEMS NECESSARY TO

MAKE THE ELECTRICAL SYSTEM COMPLETE AND OPERATIONAL, SHALL FORM A

PART OF THE WORK.

12. MAINTAIN 10' SEPARATION FROM EACH DRIVEN GROUND ROD

UTILITY DISTRIBUTION

SYSTEM

ADMINISTRATION

BUILDING

TR ROOM

UTILITY

SCALE: NTS

TELECOMMUNICATION SINGLE LINE DIAGRAMF4

UTILITY

TRANSFORMER

UTILITY

METER

SUBSTATION

T-101

SEPARATELY ENCLOSED

CIRCUIT BREAKER

1000A

MDP-1000A BUS,

208Y/120V

3-PHASE, 4-WIRE

225A

PANEL LPA FUSEBOX 2

225A MAINLUG

PANELBOARD, 208/120V

3-PHASE, 4-WIRE

PANEL LPA FUSEBOX 1

225A MAINLUG

PANELBOARD, 208/120V

3-PHASE, 4-WIRE

20A 20A

L21-20

RECEPTACLE

L21-20

RECEPTACLE

MULTI-PURPOSE RM

O

PER

ATIO

N

AL C

EN

TER

OFF. STOR.

H.A.C.

LOBBY

VESTIBU

LE

VESTIBULE

M

EN

'S LO

C

KER

R

O O

M

W O

M

EN

'S LO

C

KER

R

O O

M

BOOT WASH

VESTIBULE

MAINT. OFF.

MECHANICAL

CORRIDOR

FOREMAN

HONOR GUARD

ELEC. RM.

RESTROOM

LUNCHROOM

DIRECTOR

RESTROOM

GENERAL OFFICE

TR

TR

INFORMATION TECHNOLOGY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

BID DOCUMENTS

N/A

National Cemetery Administration

Design and Construction Service

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

56 Louis Prima Drive, Suite B, Covington, LA 70433 720.491.7559; Sean Fitzpatrick

FORT SILL

GRAVESITE EXPANSION AND

CEMETERY FCA IMPROVEMENTS

Elgin, OK

920CM3006

N/A

07/01/2026Revisions: Date: ZTNT

JD Engineering, PC 371 Zimmerman Lane Hamilton, MT 59840 Phone: (406) 218 - 9980

Approved: Project Manager/COR Department of Veteran Affairs, NCA POC: Homayoun Kazemipour Email: homayoun.kazemipour@va.gov

N

0 4 8

1 INCH = 4 FEET

GENERAL NOTES

1. ALL ELECTRICAL WORK IS NEW, AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE LATEST EDITION OF THE NEC, NFPA, AND OSHA. THE CONTRACTOR SHALL

PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL EQUIPMENT AND

CONNECTIONS INCLUDING CONTROL WIRING IN CONDUIT SYSTEM TO OTHER

DISCIPLINES' EQUIPMENT AS INDICATED/AS REQUIRED FOR A COMPLETE,

FUNCTIONAL ELECTRICAL SYSTEM.

2. CONDUCTORS SHALL BE COPPER MINIMUM #12 THW OR THWN, INSTALLED IN RIGID

STEEL CONDUITS FOR ABOVEGROUND AND PVC FOR UNDERGROUND RUNS.

PROVIDE 90° ELBOW AND CONDUIT TRANSITION FROM PVC TO RIGID STEEL

CONDUIT (RGS) FOR UNDERGROUND ROUTING BEFORE TURNING UP TO ABOVE

GROUND SURFACE.

3. ALL BRANCH CIRCUITS SHALL CONTAIN WIRING INCLUDING AN INSULATED (GREEN)

GROUNDING CONDUCTOR IN A CONDUIT, EACH SIZED PER NEC. ALL CONDUCTOR

SIZES ARE BASED ON THE USE OF "THW/THWN" INSULATION.

4. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, BENDS,

ELBOWS, JB'S, WIRE TROUGHS, PULL BOXES, HANDHOLES OR OTHER REQUIRED

ELEMENTS FOR PROPER INSTALLATION OF THE WORK. ALL NECESSARY

MATERIALS NEEDED TO FULFILL THE PROJECT REQUIREMENTS SHALL BE

PROVIDED AT NO ADDITIONAL COST.

5. WORK SHALL BE CARRIED OUT IN COORDINATION WITH OTHER DISCIPLINES

COORDINATE WITH CIVIL CONTRACT DOCUMENTS IN TERMS OF ROUTING PATHS,

EQUIPMENT COMPATIBILITY AND MOUNTING ARRANGEMENT PRIOR TO

INSTALLATION.

6. THE LOCATIONS OF ALL ELECTRICAL EQUIPMENT AND CONDUIT ROUTING ARE

APPROXIMATE. COORDINATE AND INSTALL THESE ITEMS SO AS TO ELIMINATE

INTERFERENCE WITH PIPING AND ALL OTHER EQUIPMENT. ADJUST THE LOCATION,

MHT's AND PROVIDE APPROPRIATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .