This is a contractor cost estimate worksheet template designed for construction projects submitted in response to Invitations for Bid (IFB). The worksheet requires bidders to provide lump sum pricing for each applicable construction division based on the NCA Master Construction Specifications, organized by 27 standard divisions including General Requirements, Concrete, Masonry, Metals, Thermal and Moisture Protection, Openings, Finishes, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. The template includes columns for Base Bid and three Contract Line Item Numbers (CLINs), with separate line items for Bonds, Overhead, and Profit, culminating in Grand Totals for each pricing category.

This cost estimate worksheet is specifically applicable to IFB Solicitation Number 36C78626B0030 for the Fort Sill National Cemetery Gravesite Expansion and FCA Deficiencies project under the Department of Veterans Affairs National Cemetery Administration. Bidders are required to populate applicable divisions with pricing or mark divisions as "N/A" if not utilized, with provisions to add supplemental line items as deemed appropriate. The worksheet functions as a standardized pricing template to ensure consistent cost breakdowns across competing bids for this federal construction project.

View the file

Other files

File Type Posted
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_11 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Combined Specifications_Rev 01.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_10 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_4 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_6 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_8 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_1 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_5 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_3 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_7 of 11.pdf PDF
P07_WD_OK20260043.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_9 of 11.pdf PDF
S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_2 of 11.pdf PDF
S05_Prebid RFI_26B0030 Fort Sill_Gravesite Expansion and FCA.pdf PDF
S06_36C78626B0030 0002.pdf PDF
S06_36C78626B0030 0001.pdf PDF
S04_Ft Sill_Site Visit Attendance.pdf PDF
P07_WD_OK20260023.pdf PDF
S02_Att 4_Fort Sill NC 920CM3006 Plan Set Reduced 2 of 11.pdf PDF
S02_Att 5_Fort Sill NC 920CM3006 Plan Set Reduced 3 of 11.pdf PDF
S02_36C78626B0030_Final.pdf PDF
S02_Att 12_Fort Sill NC 920CM3006 Plan Set Reduced 10 of 11.pdf PDF
S02_Att 2_Fort Sill NC 920CM3006 Combined Specifications.pdf PDF
S02_Att 3_Fort Sill NC 920CM3006 Plan Set Reduced 1 of 11.pdf PDF
S02_Att 9_Fort Sill NC 920CM3006 Plan Set Reduced 7 of 11.pdf PDF
S02_Att 1_920CM3006 Fort Sill NC IFB SOW_Final.pdf PDF
S02_Att 8_Fort Sill NC 920CM3006 Plan Set Reduced 6 of 11.pdf PDF
S02_Att 7_Fort Sill NC 920CM3006 Plan Set Reduced 5 of 11.pdf PDF
S02_Att 13_Fort Sill NC 920CM3006 Plan Set Reduced 11 of 11.pdf PDF
S02_Att 6_Fort Sill NC 920CM3006 Plan Set Reduced 4 of 11.pdf PDF
S02_Att 11_Fort Sill NC 920CM3006 Plan Set Reduced 9 of 11.pdf PDF
S02_Att 10_Fort Sill NC 920CM3006 Plan Set Reduced 8 of 11.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

IFB Number
Project Name
DivisionBase BidCLIN1CLIN 2CLIN3Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $ $ $ $