Amendment 0006 - Addenda No 3 AHU 20240620.pdf

PDF 898 KB Posted

Attached to
Y1DA--VHA Minor Construction Project 562-184 Consolidate Primary Care - Erie VAMC
Solicitation number
36C77624R0007_1
Issued by

About this file

This document appears to be a technical drawing and schedule set related to a federal contract opportunity for a construction project at the Erie VA Medical Center. The key details are:

The project involves a new addition to the first floor of the existing Main Building (Building 1) at the Erie VAMC, along with renovations to an existing portion of the building that houses the White Clinic, Women's Health, and Cardiology. The proposed construction will expand and consolidate the Primary Care Clinic into one continuous, cohesive unit. The project also includes a partial basement for mechanical equipment and utility closets, as well as site work such as parking lot reconfiguration, sidewalks, and landscaping.

The technical drawings provide detailed schematics and specifications for the mechanical, electrical, and plumbing systems, including air handling units, pumps, ductwork, VAV boxes, mini-split systems, and electrical distribution. The schedules outline equipment capacities, performance data, and other technical requirements for these building systems and components.

View the file

Other files

File Type Posted
S06 - Amend 0007 - 36C77624R0007 0007.pdf PDF
S06 - Amend 0007 - Clause Changes.docx DOCX document
Amendment 0006 - 36C77624R0007 0006.docx DOCX document
Amendment 0006 - Att. 6 - VA.ERI - SSK-1.pdf PDF
Amendment 0006 - AE VA Responses Rev 6.21.2024.xlsx XLSX spreadsheet
Amendment 0005 - 36C77624R0007 0005.docx DOCX document
Amendment 0005 - AE VA Responses Rev 6.19.2024.xlsx XLSX spreadsheet
Amendment 0005 - dg_infrastruc_std_telecom_spaces.pdf PDF
Amendment 0005 - Att 11 - VA ERI - E-011A and E-211A Rev 6.18.11.pdf PDF
Amendment 0004 - Replace Legacy EPSS - Dwgs EP103 and EP104.pdf PDF
Amendment 0004 - AE VA Responses Rev 6.12.2024.xlsx XLSX spreadsheet
Amendment 0004 - 36C77624R0007 0004.docx DOCX document
Amendment 0004 - Drawing NC111c.2.pdf PDF
Amendment 0004 - Drawing NC111b.2.pdf PDF
Amendment 0004 - Nurse Call Riser.pdf PDF
Amendment 0003 - Drawings.zip ZIP file
Amendment 0003 - EXISTING ELEC_COMMS CLOSET PICS.zip ZIP file
Amendment 0003 - AE VA Responses 5.31.24.xlsx XLSX spreadsheet
Amendment 0003 - Pics Questions 86 and 89.zip ZIP file
Amendment 0003 - Specs.zip ZIP file
Amendment 0003 - RM WB-39 EXISTING MAIN TELECOM.zip ZIP file
Amendment 0003 - SQ. D SWITCHBOARD.zip ZIP file
Amendment 0003 - Pics Questions 123 and 124.zip ZIP file
Amendment 0003 - Supporting Attachments.zip ZIP file
Amendment 0003 - EATON LV SWITCHGEAR PICS.zip ZIP file
Amendment 0003 - 36C77624R0007 0003.docx DOCX document
Amendment 0003 - RM NB-59 LOC.zip ZIP file
Amendment 0002 - 36C77624R0007 0002 v2.docx DOCX document
Amendment 0002 - 36C77624R0007 0002.docx DOCX document
014530 Statement_of_Special_Inspections.pdf PDF
014535 SI Schedule.pdf PDF
Site Visit Sign-In Sheet 4-16-2024.pdf PDF
Revised E_S Sheets GK101 and GK102 3.18.2024.pdf PDF
Updated Geotech Report 40.1938r 06.22.2020.pdf PDF
Amendment 0001 36C77624R00007 0001.pdf PDF
Att. 4-Drawings 2-Erie, PA.pdf PDF
Att. 5-Drawings 3-Erie, PA.pdf PDF
Att. 7-Brand Name Justifications_Redacted.pdf PDF
Att. 1-Specifications Volume 1-Erie, PA.pdf PDF
S02 - 36C77624R0007_1.docx DOCX document
Att. 2-Specifications Volume 2-Erie, PA.pdf PDF
Att. 6 - Wage Determination - Pulled 3.26.24.pdf PDF
Att. 3-Drawings 1-Erie, PA.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WATER

GPM

REMARKS

1,2

MOTOR STARTER

-0

TYPESIZE

MOTOR

RPM

153208 3500

GALVOLTS PHPSIG

FLOW

DISCHARGE

PRESSURE

HP

TYPEMARK

CENTRIFUGALSCP-1

RECEIVER

CAPACITY

DUPLEX CONDENSATE PUMP SCHEDULE

REMARKS:

1. DUPLEX CONDENSATE PUMP.

2. PROVIDE WITH ACROSS THE LINE STARTER.

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

MEP ENGINEER:

BOWMAN FOSTER

6353 Center Drive Norfolk, VA 23502 757-466-7400

HEALTHCARE PLANNER:

EYP

811 West Hargett St.

Raleigh, NC 27603 713-852-3610

ARCHITECT:

CB DESIGN GROUP

421 King Street

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

Erie VA Medical Center 135 East 38th Street, Erie, PA 16504

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

STRUCTURAL ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300

Fort Worth, TX 76102

817-335-3000

FP/LS ENGINEER:

STANTON ENGINEERING

10280 Old Columbia Rd.

Ste. 275 Columbia, MD 21046 410-290-9304

CIVIL ENGINEER:

Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456

03/07/2023

VA 562-184

CADPP

ERIE VAMC - CONSOLIDATED

PRIMARY CARE

CDF SUBMISSION

SCHEDULES

M-511

V A

-1

M -5

/1

/2

.p d f

90% OF DUCT PRESSURE CLASS.

(SMACNA) HVAC AIR DUCT LEAKAGE TEST MANUAL.

TEST PER SHEET METAL & AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

DUCT CONSTRUCTION AND LEAK TEST SCHEDULE

REMARKS

LOW PRESSURE DUCTWORK

MARK

NONE OR

DUCT

PRESSURE

OUTSIDE AIR

"WC

DUCT PRESSURE CLASS

RETURN

DUCT

"WC

1/2",1",2"

SUPPLY

DUCT

"WC

EXHAUST

DUCT

A

A

"WC

DUCT CLASS

SEAL

DUCT

12/6

24/12

DUCT

LEAK

CLASS

TEST

1NONE OR2

TYPE

TEST

DUCT

REMARKS

MEDIUM PRESSURE DUCTWORK NONE OR 2 1NONE OR

TS

MAX

FAN

RPM

REMARKS

VOLTSHPCFM

TYPE

ESP

"WC

MARK

EXHAUST FAN SCHEDULE

FPM

DRIVE

MOTOR

EF-1 CENTRIFUGAL 1285 .75 4950 1/3 1448 120 BELT 1

AIR FLOW

PH

ELECTRIC SERVICE

REMARKS:

1. PROVIDE FAN WITH SPEED CONTROLLER.

2. INPUT WATTS = 52.

3. INPUT WATTS = 105.

SQUARE SUPPLY 6"∅ .06 1

MARK TYPE SERVICE REMARKSNECK SIZE

INCHES

APD

"WC

GRILLE, REGISTER & DIFFUSER SCHEDULE

SUPPLY 8"∅ .05 1

SUPPLY 10"∅ .06 1

SUPPLY 12"∅ .06 1

6X6 .06 2

8X8 .12 2

10X10 .12 2

RETURN

REMARKS: 1. BASED ON TITUS SQUARE HIGH PERFORMANCE (TMS) 4 WAY SERIES, MAX APD, NC, THROW BASED ON

MAXED CFM (STEEL OR ALUMINUM AVAILABLE).

2. BASED ON PMR MODULAR RETURN.

AIR HANDLING UNIT SCHEDULE

REMARKS:

1. LEAVING AIR TEMPERATURE IS TO BE PROVIDED AT THE UNIT DISCHARGE, TOTAL & SENSIBLE CAPACITIES ARE "NET" VALUES TO BE PROVIDED DOWNSTREAM OF THE SUPPLY AIR FAN.

2. PROVIDE WITH INVERTER DUTY RATED MOTOR(S) AND VARIABLE FREQUENCY DRIVE(S).

AHU-1 25000

MARK

SUPPLY FAN DATA

S.A. C.F.M.

(MAX./MIN.)

O.A.

C.F.M.

E.S.P.

(IN. WG.)

T.S.P.

(IN. WG.)

H.P.

PREHEAT COIL DATA

ELECTRICAL DATA

VOLTS PHASE

TOTAL

CAPACITY

M.B.H.

E.D.B.

(°F)

L.D.B.

(°F)

G.P.M.

L.W.T

(°F)

MAX.

A.P.D

(IN.

WC.)

MAX.

W.P.D

(FT.

HD.)

CHILLED WATER COOLING COIL DATA

TOTAL

CAPACITY

M.B.H.

SENS.

CAPACITY

M.B.H.

E.D.B.

(°F)

E.W.B.

(°F)

L.D.B.

(°F)

L.W.B.

(°F)

E.W.T

(°F)

L.W.T

(°F)

GPM

MAX.

A.P.D

(IN.

WC.)

MAX.

W.P.D

(FT.

HD.)

REMARKS

MARK SIZE

OUTLET

TOTAL

MBH

EAT

°FDB

LAT

°FDB

UNIT DATA HEATING COIL-DATA

(180F EWT)

SHUT-OFF VARIABLE AIR VOLUME BOX SCHEDULE

VAV-1

(IN X IN)

PRIMARY AIR DATA

UNIT INLET

SIZE

SIZE

MAX

FLOW

(CFM)

MIN

FLOW

(CFM)

STATIC PRESSURE

FLOW

(IN WG)

FLOW

(IN WG)

RAD DIS

NC LEVELS

20X17.5 3131 1100 1 0.068 32 63 51.8 10025

VAV-2

VAV-3

VAV-4

VAV-5

VAV-6

VAV-7

VAV-9

VAV-8

VAV-10

VAV-11

REMARKS

REMARKS

1. CONTROLS SHALL BE FACTORY MOUNTED, NOT FIELD MOUNTED.

2. THE VAV BOX SHALL NOT GO BELOW THE MIN CFM WHEN THE BUILDING IS IN NORMAL

OPERATION.

3. PROVIDE VAV BOXES WITH SCR CONTROLLER.

4. VAV BOX SELECTION BASED ON DAIKIN .

ROOM

SERVED

1N104, 1N104A, 1N104B, 1N104C

1N206, 1N208, 1N210, 1N600

1N001E, 1N106, 1N204

1N209, 1N211, 1N213, 1N215

1N001E, 1N001F, 1N201, 1N203, 1N205, 1N207

1N602

1N300, 1N302, 1N304, 1N306, 1N308, 1N310, 1N312, 1N314, 1N316

1N601, 1N603, 1N605

NOT USED

1N606

1N400, 1N402, 1N404, 1N406, 1N408, 1N410, 1N412, 1N414

1, 2, 3, 4

290 1 0.027 28 1710

430 112

170 1 0.04 25 188

430 112

38X20 1100 1 0.216 44 3518X16

385 1 38 2816

118X16

10.0 100

92.3

7.5 100

94.2

99.1

51.8

51.8

51.8

51.8

51.8

51.8

51.8

51.8

51.8

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

1, 2, 3, 4

VAV-13 1 51.8 97.7

VAV-14

VAV-15

VAV-16

1N007, 1N500, 1N502, 1N504

1N5

1N607, 1N608

1N002, 1N002A

1, 2, 3, 48

118X16 118X16

17.4 99.8

51.8

51.8

51.8

1, 2, 3, 4 1, 2, 3, 4

1, 2, 3, 4

VAV-12 1N506, 1N508 110 10051.8 1, 2, 3, 4

EF-2 1150 1.5 8252 0.81 3022 460 BELT3

15 460 34460 3.50 4.5 1352 94.9 159.5135.0

MOCP

110 135.0

CENTRIFUGAL

0.21 18.80 1138 771 80.0 67.0 52.0 57.9 45.0 55.1 227.0 1.77 10.60

A

B

C

D

M

N

O

25000

RETURN FAN DATA

R.A. C.F.M.

(MAX./MIN.)

E.S.P.

(IN. WG.)

T.S.P.

(IN. WG.)

H.P.

ELECTRICAL DATA

VOLTS PHASE

10 460 32.1 2.1

MOCP

18X16

18X16

18X16

18X16

VAV-17 1N001, 1N000 118X16 96.251.8 1, 2, 3, 418X16

20X17.5

20X17.5

20X17.5

20X17.5

20X17.5

20X17.5

20X17.5

20X17.5

20X17.5

20X17.5

38X20

38X20

38X20

38X20

1064 430

1064 430

290628

170555

1100313

1100313

1100313

1100313

7301514

32 25

32 25

32 25

32 25

28 17

25 18

38 28

44 35

44 35

44 35

44 35

0.068

0.068

0.068

0.068

0.027

0.04

0.178

0.178

0.216

0.216

0.216

0.216

7.7

10.9

17.2

14.7

3.7

7.3

24.9

26.3

34.4

60.9

59.1

16.9

VAV-18 1N001B, 1N001 112 10051.8 1, 2, 3, 412 20X17.5 1064430 32 250.068 9.4

MODEL

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MQFC16

MINI SPLIT SYSYTEM SCHEDULE

REMARKS:

MSI-1 820

MARK

INDOOR UNIT

AIR FLOW

CFM

VOLTS PH MCA MOCP

BASIS OF DESIGN

(MITSUBISHI)

MARK REFRIGERANT REMARKS

20 MSO-1 R-32208 1 2 MSZ-HM24NA/MUZ-GL24NA18.0

OUTDOOR UNIT

COOLING CAPACITY

MIN

PH MCA MOCP

1 26 30208

RATED SEER

42.0 15.8

VOLTS

INDOOR UNIT/OUTDOOR UNIT

RPM REMARKS

VOLTSHP

TYPE

HEAD

FT

MARK

PUMP SCHEDULE

P-1 CENTRIFUGAL 227.0 50 31749 460 1,2,3

WATER

FLOW GPM

PH

ELECTRIC SERVICE

REMARKS:

1. PROVIDE WITH VFD.

2. PROVIDE WITH END SUCTION DIFFUSER.

3. CHILLED WATER PUMPS.

4. HOW WATE PUMPS.

P-2 227.0 50 31749 460 1,2,33CENTRIFUGAL

P-3 CENTRIFUGAL 186.6 25 31800 460 1,2,43

P-4 186.6 25 31800 460 1,2,43CENTRIFUGAL

12X12 .11 2

14X14 .11 2

18X18 .12 2

10X10 .09 3SQUARE

P

Q

R

W

50-100

RANGE

(MIN-MAX)

CFM

105-250

255-400

405-600

50-100

105-250

255-400

405-550

555-750

755-1250

155-350

605-900E

SQUARE

SQUARE

SQUARE

SQUARE SUPPLY 14"∅ .08 1

SQUARE

SQUARE

SQUARE

SQUARE

SQUARE

RETURN

RETURN

RETURN

RETURN

RETURNSQUARE

6X6 .13 3V 0-150 EXHAUSTSQUARE

EXHAUST

24X24

SIZE (IN)

24X24

24X24

24X24

24X24

24X24

24X24

24X24

24X24

24X24

24X24

24X24

24X24

3. BASED ON 12X12 PAR-AA.

INITIAL PRESSURE

PSIG

LEAVING PRESSURE

PSIG

MAX PD

PSI

EWT °FWATER FLOW GPM LWT °F

MARK

STEAM TO HOT WATER EXCHANGER SCHEDULE

CAPACITY

MBH

TRAP CAPACITY

LBS/HR

HX-1 90.2 160 180 6.5 15 9.06 927.95

FLOW

LBS/HR

927.95

SHELL SIDE

HX-2 160 180 6.5 15 9.06 927.95927.9590.2

TUBE SIDE

MSI-2 500 20 MSO-2 R-32208 1 2 MSZ-HM12NA/MUZ-GL12NA18.0 1 26 3020842.0 15.8

EF-3 100 1 - - 1674 120 DIRECT1CENTRIFUGAL 2

1. PROVIDE INTEGRAL CONDENSATE PUMP.

1, 2

REMARKS

AIR FLOW

FREE AREA

MINIMUM INTAKE

"WCCFM

SYSTEMMARK

LOUVER SCHEDULE

SQUARE FEET

APD

L-1 EXHAUST 100 .18 .03 ALUMINUM

REMARKS: 1. INCLUDE WIRE MESH SCREEN

L-2 4460 8.89 .04 ALUMINUMINTAKE

WIDTH

(INCHES)

HEIGHT

(INCHES)

MATERIALS

15 8

74 34

ELEMENT SIZE

(INCHES)

BTUH/FOOTEWT °F GPMMARK

HYDRONIC FIN TUBE BASEBOARD RADIATOR SCHEDULE

TOTAL

LENGTH

(FEET)

PRESURE DROP

(FEET)

BB-1 180 1 800 3/4 .3844

REMARKS

GPM

6.71

2.72

0.77

0.75

1.09

2.49

1.69

2.63

0.37

0.73

3.43

1.74

1.47

5.91

0.94

E.W.T

(°F)

EFFICIENCY

VAV-19 1N001 14 10051.8 1, 2, 3, 414

VAV-20 1N6

138X20 1064580 44 350.216 60.9 MQFC161.74

1N2VAV-21

14 10051.8 1, 2, 3, 414 138X20 1064580 44 350.216 60.9 MQFC161.74

110 10051.8 1, 2, 3, 410 20X17.5 290628 28 170.027 3.7 MQFC161.47

FLA

1.5

90-200F LINEAR SUPPLY 8"∅ .04 4-

4. CONTINUOUS PLENUM WITH 8"∅ NECK - 4' LONG LINEAR DIFFUSER.

EF-4 50 0.75 - - 808 120 DIRECT1INLINE 30.46

BN1, BN100VAV-22 110 10051.8 1, 2, 3, 410 20X17.5 290628 28 170.027 3.7 MQFC161.47

ELEMENT SIZE

(INCHES)

BTUH/FOOTMARK

ELECTRIC UNIT HEATER

TOTAL

LENGTH

(FEET)

EUH-1 800 3/44

REMARKS

S 300-500 ROUND RETURN 14"∅ - .02 5

5. WALL GRILLE. 3/4" ADJUSTABLE DEFLECTION.

18X16 18X16

FLA

52.65

FLA

34.00

ADDENDUM 021

5-20-24

EE

E

E

E

E

E

E

E E

J

E

E

E

E E

E

E

M

E

E M

E

3P

3P

3P60

3P

2P NEMA 3R

X

3P

ELECTRICAL CLOSET

BN110

SMALL IT

BN106

FCC

BN108

FUTURE ELEVATOR

BN104

ELEVATOR EQUIP

BN100

CORRIDOR

BN1

MECHANICAL ROOM

BN114

CRAWL

BN102

TPP1-3,5

TPP1-2,4,6

T

EML3-24

EML1-31,33

EMH1-7

EML3-6

EML3-4

EMH1-13

EMH1-20

EMH1-26

EMH1-25

EMH1-31

P-3

P-4

P-1

P-2

3P

EML3-11

2P NEMA 3R

EML3-7

3P

E

C

B

6 75

A

D

E-18

E-20

E-19

E-20.1

E-OO6.5

E-19a

EML3-20

EML3-23

25 25

EML3-18

MS1-2

MS1-1

EML3-22

2P

MS0-1 MS0-2

EML3-26

TPP1-8

EML3-8

EML1-27,29

3P

WP

TPP1-1

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

MEP ENGINEER:

BOWMAN FOSTER

6353 Center Drive Norfolk, VA 23502 757-466-7400

HEALTHCARE PLANNER:

EYP

811 West Hargett St.

Raleigh, NC 27603 713-852-3610

ARCHITECT:

CB DESIGN GROUP

421 King Street

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

Erie VA Medical Center 135 East 38th Street, Erie, PA 16504

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

STRUCTURAL ENGINEER:

HUITT-ZOLLARS

500 W. 7th St., Ste. 300

Fort Worth, TX 76102

817-335-3000

FP/LS ENGINEER:

STANTON ENGINEERING

10280 Old Columbia Rd.

Ste. 275 Columbia, MD 21046 410-290-9304

CIVIL ENGINEER:

Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456

03/07/2023

VA 562-184

CADRW

ERIE VAMC - CONSOLIDATED

PRIMARY CARE

CDF SUBMISSION

BASEMENT POWER PLAN - NEW

WORK

E-011B

V A

-1

E

-0

B

/1

/2

.p d f

3/16" = 1' - 0" 0 5' 10' 20'

NORTH

NOTE: IF THIS DRAWING IS A REDUCTION

GRAPHIC SCALE MUST BE USED.

CONSTRUCTION NOTES

1. CONNECT AIR HANDLING UNIT AHU-1. SUPPLY 15HP, 21FLA,

460V, 3Ø.

2. CONNECT CHILLED WATER PUMP. 2HP, 460V, 3Ø.

3. CONNECT HOT WATER PUMP. 3HP, 460V, 3Ø.

4. CONNECT SHUT-OFF VALVE BOX VAV-22, 120V, 1Ø.

5. THREE #6 AND ONE #8 GND IN 3/4" C.

6. PROVIDE PANEL "EMH1" 800A, 800A M.C.B., 480Y/277V, 3⌀, 4W.

7. PROVIDE PANEL EMH2, 100A, 480Y/277, 3⌀, 4W.

8. PROVIDE 150 KVA DRY-TYPE 480 - 208Y/120V. 3⌀

TRANSFORMER.

9. PROVIDE PANEL "EML4", 400A, 400A, 208Y/120V, 3⌀, 4W.

10. PROVIDE PANEL "EML5", 225A, 208Y/120V, 3⌀, 4W.

11. PANEL "TPP1".

12. PROVIDE PANEL "EML1", 600A, 600A M.C.B., 208Y/120V, 3⌀, 4W.

13. MOUNT QUADRAPLEX RECEPTACLE TO UNDERSIDE OF CABLE

RUNWAY FOR POWER TO EQUIPMENT RACKS/CABINETS.

14. CONNECT MINISPLIT SYSTEM MSO-1. 17.1MCA, 208V, 1Ø.

SURFACE MOUNT CONDUITS ON WALL FACE.

15. MINISPLIT SYSTEM MSI-1. POWERED BY MSO-1.

16. CONNECT AIR HANDLING UNIT AHU-1, RETURN, 10HP, 14FLA,

460V, 3Ø.

17. THREE #8 AND ONE #10 GND IN 3/4" C.

18. ROUGH-IN FOR ELEVATOR PIT LTG. CIRCUIT, 120V, 1Ø.

19. COORDINATE FUSED DISCONNECT SIZE W/ ELEVATOR

CONTRACTOR.

20. PROVIDE 800A, 480V, 3⌀ AUTOMATIC TRANSFER SWITCH.

21. PROVIDE PANEL "EML2" 200A, 208Y/120V, 3⌀, 4W.

22. PROVIDE PANEL "EML3" 100A, MLO, 208Y/120V, 3⌀, 4W.

23. CONNECT MINISPLIT SYSTEM MSO-2, 7.0 MCA, 208V, 1⌀.

SURFACE MOUNT CONDUITS ON WALL FACE.

24. MINISPLIT SYSTEM MSI-2 POWERED BY MSO-2.

25. PROVIDE 120V, 1⌀ POWER AT LOCATION INDICATED FOR

CONTOL TRANSFORMER FOR DOOR, HARDWARE PER DOOR

SCHEDULES ON ARCHITEXTURAL DRAWINGS.

26. CONNECT SUMP PUMP SP-1, 1/2HP, 115V, 1⌀.

27. CONNECT DUPLEX CONDENSATE PUMP SCP-1, 1HP, 208V, 3⌀.

28. CONNECT EXHAUST FAN EF-3, 1.5 FLA, 115V, 1⌀.

29. CORNELL POWER SUPPLY-12 OR 24 VOLT, 3 AMP, P-512243A

AND TRIPLE STATUS CONTROL MONDULE NC-102D.

KEY PLAN

PLAN

NORTH

TRUE

NORTH

NOT TO SCALE

NIC

BASEMENT

3/16" = 1'-0"

BASEMENT POWER PLAN - NEW WORK

GENERAL NOTES

1. LIGHT LINEWEIGHT SYMBOLS INDICATE EXISTING DEVICES,

EQUIPMENT, CONDUIT, ETC. TO REMAIN. HEAVY LINEWEIGHT

SYMBOLS INDICATES NEW DEVICES, EQUIPMENT TO BE

SUPPLIED AND OR INSTALLED. HEAVY AND DASHED

LINEWEIGHT SYMBOLS INDICATE DEVICES, EQUIPMENT,

CONDUIT, ETC. TO BE REMOVED.

2. SEAL AND FIREPROOF ALL PENETRATIONS CREATED BY THE

REMOVAL OR INSTALLATION OF CONDUITS.

3. REFER TO DRAWINGS GC300, GC301 AND GC401 FOR PHASING

OF WORK.

ADDENDUM 021 5-20-24

Sheets
M-511 - SCHEDULES

2024.06.18.CONSOLIDATE.PRIMARY.CARE.SHT.E-011B.REVISIONS.DWG

File details come from the government source that posted it. Updated .