Amendment 0005 - Att 11 - VA ERI - E-011A and E-211A Rev 6.18.11.pdf
PDF 1 MB Posted
- Solicitation number
- 36C77624R0007_1
About this file
This document contains two technical drawings, E-011A and E-211A, which provide detailed lighting plans for the basement and first floor of a new addition to the Erie VA Medical Center as part of a consolidation of the primary care clinic.
The drawings show the layout and placement of new lighting fixtures, room status lights, and other electrical infrastructure for the expanded and renovated spaces. Key details include the room names and numbers, lighting fixture types and quantities, and notes on construction phasing and coordination. This appears to be part of a broader VA minor construction project, Solicitation #36C77624R0007_1, to build a new addition to the existing main building and renovate the existing primary care clinic space. The project aims to expand and integrate the primary care services into a cohesive unit.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
C
B
A
D
E-18
E-20
E-19
E-20.1
6.5
6.5
E-19a
N
O
H N
N
N
H
N
N
N
N
N
N
N
N
N
N
N
N
EMH2-5
EMH2-3
EMH2-1
TPP1-7
MECHANICAL ROOM
BN114
FUTURE ELEVATOR
BN104
ELEVATOR EQUIP
BN100
SMALL IT
BN106
ELECTRICAL CLOSET
BN110
FCC
BN108
CORRIDOR
BN1
STAIRS
BN001
AREAWELL
BN116
N
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
BOWMAN FOSTER
6353 Center Drive Norfolk, VA 23502 757-466-7400
HEALTHCARE PLANNER:
EYP
811 West Hargett St.
Raleigh, NC 27603 713-852-3610
ARCHITECT:
CB DESIGN GROUP
421 King Street
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
Erie VA Medical Center 135 East 38th Street, Erie, PA 16504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
STRUCTURAL ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300
Fort Worth, TX 76102
817-335-3000
FP/LS ENGINEER:
STANTON ENGINEERING
10280 Old Columbia Rd.
Ste. 275 Columbia, MD 21046 410-290-9304
CIVIL ENGINEER:
Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456
03/07/2023
VA 562-184
CADRW
ERIE VAMC - CONSOLIDATED
PRIMARY CARE
CDF SUBMISSION
BASEMENT LIGHTING PLAN - NEW
WORK
E-011A
V A
-1
E -0
A
/0
/2
.p d f
3/16" = 1'-0"
BASEMENT LIGHTING PLAN - NEW WORK
3/16" = 1' - 0"
0 5' 10' 20'
NORTH
NOTE: IF THIS DRAWING IS A REDUCTION
GRAPHIC SCALE MUST BE USED.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
NOT TO SCALE
NIC
BASEMENT
CONSTRUCTION NOTES
1. SEE SHEET E-211B FOR CONTINUATION OF CIRCUIT.
GENERAL NOTES
1. LIGHT LINEWEIGHT SYMBOLS INDICATE EXISTING DEVICES,
EQUIPMENT, CONDUIT, ETC. TO REMAIN. HEAVY LINEWEIGHT
SYMBOLS INDICATES NEW DEVICES, EQUIPMENT TO BE
SUPPLIED AND OR INSTALLED. HEAVY AND DASHED
LINEWEIGHT SYMBOLS INDICATE DEVICES, EQUIPMENT,
CONDUIT, ETC. TO BE REMOVED.
2. SEAL AND FIREPROOF ALL PENETRATIONS CREATED BY THE
REMOVAL OR INSTALLATION OF CONDUITS.
3. REFER TO DRAWINGS GC300, GC301 AND GC401 FOR PHASING
OF WORK.
ADDENDUM 021 5-20-24
2 3 4 6 75
E-18
E-17
E-16
E-20
E-19
E-X3E-X1
E-12.1
E-X4
E-14
E-20.1
E-15
E-X6E-X5 E-LL E-MM E-NN E-OO E-2.1 E-2.5 E-3.1 E-3.8
E-J.2
E-13.8
E-10.2
E-11
6.5
E-19a
X-01
X-02
X-03
X-04
X-05
X-06
R-02
R-03
CONSULT/ EXAM
1N215
CONSULT/ EXAM
1N213
CONSULT/ EXAM
1N211
CONSULT/ EXAM
1N209
CONSULT/ EXAM
1N207
CONSULT
1N205
CONSULT
1N203
PATIENT TOILET
1N201A PROCEDURE
1N201
TEAMWORK ZONE
1N2.1
CONSULT/ EXAM
1N316
CONSULT/ EXAM
1N314
CONSULT/ EXAM
1N312
CONSULT/ EXAM
1N310
CONSULT/ EXAM
1N308
A
A
A
A
A
E F
E
A
A
A
H
A
D
EH
A A A A A A A
H
A A A A A A A A A
D
A
A A A A A A A A A
D
F
F
F
A A A A A
A A A A A A
E
E
E
E F
E
E
E
E
E
F F F
F
F
J
C
E
F
F
G
E
K
K
K
K
H H
HH
H
H
H
F
J
J J
J
J
G
P
A
A AA A
A A A
B
BEMH2-6
EMH1-2
EMH2-4
EMH2-12
O3 O3 O3 O3 O3 O3 O3 O3 O3
O3O3O3O3O3O3O3O3O3
O3 O3 O3 O3
O3 O3 O3 O3
O
O3
O3
O3 O3 O3 O3 O3 O3 O3
O3 O3 O3 O3 O3 O3 O3
O O
O
O
(TYP.)
(TYP.)
(TYP.)
O
O O
B
PC ASST. MANAGER
1N104APC MED. DIRECTOR
1N104C
PC MANAGER
1N104B
ADMIN. OFFICE
1N104
STAFF TOILET
1N102
CORRIDOR
1N1
TEAMWORK ZONE
1N1.1
CONSULT/ EXAM
1N210
CONSULT/ EXAM
1N208
CONSULT/ EXAM
1N206
CONSULT/ EXAM
1N204
BREAKROOM
1N106
PATIENT TOILET
1N200
WHEEL CHAIRS
1N001C
LOBBY
1N001
PATIENT CORRIDOR
1N2
CONSULT/ EXAM
1N306
CONSULT/ EXAM (NEG)
1N304
CONSULT/ EXAM (NEG)
1N302
CONSULT/ EXAM (NEG)
1N300
WAITING
1N002A
LOBBY
1N001
VESTIBULE
1N000
LOBBY
1N001
WAITING
1N001A
F
F
F
F
F
F
F
E
F
P
H
H
H
EMH2-8,10
E
E
PHONE BOOTH
1N001E
COFFEE
1N001F
J J
J J
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
BOWMAN FOSTER
6353 Center Drive Norfolk, VA 23502 757-466-7400
HEALTHCARE PLANNER:
EYP
811 West Hargett St.
Raleigh, NC 27603 713-852-3610
ARCHITECT:
CB DESIGN GROUP
421 King Street
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
Erie VA Medical Center 135 East 38th Street, Erie, PA 16504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
STRUCTURAL ENGINEER:
HUITT-ZOLLARS
500 W. 7th St., Ste. 300
Fort Worth, TX 76102
817-335-3000
FP/LS ENGINEER:
STANTON ENGINEERING
10280 Old Columbia Rd.
Ste. 275 Columbia, MD 21046 410-290-9304
CIVIL ENGINEER:
Integrity Federal Services 148 S. Queen Street Suite 201 Martinsburg, WV 25401 304-725-8456
03/07/2023
VA 562-184
CADRW
ERIE VAMC - CONSOLIDATED
PRIMARY CARE
CDF SUBMISSION
LIGHTING PLAN AREA 'A' - NEW WORK
E-211A
V A
-1
E -2
A
/1
/2
.p d f
3/16" = 1' - 0" 0 5' 10' 20'
NORTH
NOTE: IF THIS DRAWING IS A REDUCTION
GRAPHIC SCALE MUST BE USED.
KEY PLAN
PLAN
NORTH
TRUE
NORTH
NOT TO SCALE
A
NIC
CONSTRUCTION NOTES
1. PROVIDE ROOM STATUS LIGHT MOUNTED 6" ABOVE DOOR
FRAME TO BOTTOM OF FIXTURE. SEE "ROOM STATUS LIGHT
FIXTURE & SWITCH IN ROOM" PHOTO AND DETAILS ON SHEET
E-522. MATCH THE COLOR SCHEME CURRENTLY BEING USED AT
VAMC EERIE. "RED" FOR PROVIDER, "GREEN" FOR NURSE AND
"YELLOW" FOR PATIENT.
2. SEE SHEET E-211B FOR CONTINUATION.
3. EXISTING EXTERIOR LIGHTING TO REMAIN.
4. PROVIDE (5) DOWNLIGHTS AS INDICATED IN VESTIBULE CEILING.
5. LIGHTING FIXTURE MOUNTED HIGH ABOVE VESTIBULE 1N000.
3/16" = 1'-0"
LIGHTING PLAN AREA 'A' - NEW WORK
GENERAL NOTES
1. LIGHT LINEWEIGHT SYMBOLS INDICATE EXISTING DEVICES,
EQUIPMENT, CONDUIT, ETC. TO REMAIN. HEAVY LINEWEIGHT
SYMBOLS INDICATES NEW DEVICES, EQUIPMENT TO BE
SUPPLIED AND OR INSTALLED. HEAVY AND DASHED
LINEWEIGHT SYMBOLS INDICATE DEVICES, EQUIPMENT,
CONDUIT, ETC. TO BE REMOVED.
2. SEAL AND FIREPROOF ALL PENETRATIONS CREATED BY THE
REMOVAL OR INSTALLATION OF CONDUITS.
3. REFER TO DRAWINGS GC300, GC301 AND GC401 FOR PHASING
OF WORK.
ADDENDUM 021 5-20-24
111111
1 1 1 1 1 1
| Sheets |
| E-011A - BASEMENT LIGHTING PLAN - NEW WORK |
| E-211A - LIGHTING PLAN AREA 'A' - NEW WORK |
File details come from the government source that posted it. Updated .