This document is Amendment 0002 to Solicitation 36C77624R0007 for a Department of Veterans Affairs minor construction project to consolidate the primary care clinic at the Erie VAMC. The purpose of this amendment is to extend the proposal due date to June 7, 2024 at 5:00 PM EDT and revise the contract line items (CLINs) to clarify references to the construction drawings.
The amendment includes additional attachments: a Site Visit Attendance Sheet, Statement of Special Inspections, and Schedule of Special Inspections. It states that a signed copy of the amendment must be included with all proposals, and all other terms and conditions remain the same. The solicitation is for a new addition and renovation to the existing main building at the Erie VAMC to expand and integrate the primary care clinic. The principal NAICS code is 236220 - Commercial and Institutional Building Construction and the product/service code is Y1DA - Construction of Hospitals and Infirmaries. The solicitation includes multiple deduct alternates related to items such as commissioning, ceilings, negative pressure rooms, sunshades, lighting, and a shell phase 2.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C77624R0007 0002 Attachments
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
562-184 36C776 Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C776 Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C77624R0007 04-04-2024
X
X
6-7-2024, 5:00PM EDT
See CONTINUATION Page
The purpose of this amendment is to extend the period for accepting proposals as outlined in section 11 of this form.
In addition, the CLINs of this solicitation have been revised to clarify references to construction drawings.
Other changes that have been made: 1) Inclusion of the Site Visit Attendance Sheet. 2) Inclusion of Statement of Special Inspections. 3) Inclusion of the Schedule of Special Inspections.
A signed copy of this amendment must be included with all submitted proposals. All other terms and conditions of the solicitation remain the same.
Samantha Mihaila Contracting Officer
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| jb |
| __________________ |
| __________________ |
General Construction: Provide all personnel, labor, supervision, materials, tools, and equipment necessary to perform the work as described in the Offer Documents, which include stamped and signed Construction Drawings and Specifications.
Contract Period: Base POP Begin:
POP End:
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Y1DA - Construction of Hospitals and Infirmaries
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 01: Remove third party commissioning from contractor scope
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 05: Replace gyp. bd. Ceiling with ACT at several locations in the project per sheet GC-401 and E211C
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 08: Addition - Remove all (2) negative pressure rooms per sheet M-111C
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 09: Renovation - Remove all (3) negative pressure rooms per sheet M-111C
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 06: Replace gyp. bd. Ceiling with ACT at serveral locations in the project sheet GC-401 and E-211C
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 04: Remove horizontal sunshade on east elevation per sheet GC-400
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 03: Remove verticle sunshade on east elevation per sheet GC-400
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 10: Remove exterior façade lighting per sheet ES111A
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 07: Replace PLAM finish with gyp. bd. At lobby waiting area feature wall per sheet GC-400
POP Begin:
POP End:
| 1.00 |
| jb |
| __________________ |
| __________________ |
Deduct alternate 02: Shell Phase 2 per sheet GC-400 and M111D
POP Begin:
POP End:
| GRAND TOTAL |
| __________________ |
See attached document: 014530 Statement_of_Special_Inspections.
See attached document: 014535 SI Schedule.
See attached document: Site Visit Sign-In Sheet 4-16-2024.
End of Document
DESCRIPTION
The purpose of this amendment is to extend the period for accepting proposals to 6/7/2024, 5:00PM EDT.
In addition, the CLINs of this solicitation have been revised to clarify references to construction drawings.
Other changes that have been made:
1) Inclusion of the Site Visit Attendance Sheet.
2) Inclusion of Statement of Special Inspections.
3) Inclusion of the Schedule of Special Inspections.
A signed copy of this amendment must be included with all submitted proposals. All other terms and conditions of the solicitation remain the same.