This document is a fire protection plan drawing for a federal construction project at the Northern Arizona VA Health Care System in Prescott, Arizona. The project involves replacing steam boilers and installing a new fire sprinkler system in multiple areas of the facility, specifically the control room (102), storage area (103), generator room (104), and mezzanine offices (110), with no fire sprinklers to be installed in the boiler room (101).

The fire protection system design includes new 6-inch fire sprinkler risers, upright sprinkler coverage rated for Extra Hazard Group 2 occupancy, piping of various diameters (ranging from 1 inch to 6 inches), and associated components including OS&Y control valves, double check backflow prevention assemblies, pressure gauges, swing check valves, vane type water flow switches, and a 6-inch electric bell. The contractor is responsible for final installation design including hydraulic calculations and must employ a minimum NICET Level III technician or licensed fire protection engineer. All materials must be UL listed or FM approved, and design, fabrication, installation, and testing must comply with NFPA 101, NFPA 13, VA Design Guide, and local VA requirements. Seismic bracing and hangers must be designed per NFPA 13 and ASCE 7-05 standards and stamped by a licensed structural or fire protection engineer. The fire sprinkler system monitoring will be provided by the fire alarm contractor, and coordination with other trades is required prior to fabrication and testing.

View the file

Other files for this federal contract opportunity

Other files attached to Prescott Replace Steam Boilers (Project No. 649-22-104), newest first.
File Type Posted
Award Notice 36C26226C0255.pdf PDF
Amendment 0004 - Solicitation 36C26226B0017.pdf PDF
Attachment 28 - HA101 - BASMENT AND FIRST FLOOR ASBESTOS ABATEMENT PLAN.pdf PDF
Attachment 25 - Maricopa Association of Governments Uniform Standard Details.pdf PDF
Attachment 24 - Section 33 10 00 - Water Utilities_Revised.pdf PDF
Attachment 23 - EE501 - ELECTRICAL DETAILS.pdf PDF
Attachment 21 - ME502 - MECHANICAL DETAILS.pdf PDF
Attachment 14 - Section 01 32 16.13 - Network Analysis Schedules.pdf PDF
Attachment 13 - VAMC Archeological Sensitivity Map.pdf PDF
Attachment 27 - EL202 - MEZZANINE FLOOR PHOTOMETRIC PLAN.pdf PDF
Attachment 20 - MP101 - LEVEL 1 MECHANICAL PIPING PLAN.pdf PDF
Attachment 15 - Section 00 01 10 - Table of Contents_Revised.pdf PDF
Attachment 12 - Revised Design Narrative and Option Descriptions.pdf PDF
RFI Notice 01 - Solicitation No. 36C26226B0017.pdf PDF
Attachment 22 - MP102 - MECHANICAL PIPING PLAN - UPPER LEVEL.pdf PDF
Attachment 19 - MP100 - BASEMENT MECHANICAL PIPING PLAN.pdf PDF
Attachment 18 - ENG Form 4288 - Submittal Register.pdf PDF
Attachment 17 - Utilities Drawing.pdf PDF
Attachment 16 - Section 23 22 13 - Steam and Condensate Heating Piping.pdf PDF
Amendment 0003 - Solicitation 36C26226B0017.pdf PDF
Amendment 0002 - Solicitation 36C26226B0017.pdf PDF
Attachment 11 - Site Visit Sign-in Sheet.pdf PDF
Amendment 0001 - Solicitation 36C26226B0017.pdf PDF
Attachment 06 - Asbestos Survey Report.pdf PDF
Attachment 03 - Drawings.pdf PDF
Attachment 07 - Design Narrative and Option Descriptions.pdf PDF
Attachment 04 - Wage Rate Determination.pdf PDF
Attachment 01 - Statement of Work.pdf PDF
Solicitation 36C26226B0017.pdf PDF
Attachment 09 - VHA Boiler Associated Plant Safety Device Testing Manual.pdf PDF
Attachment 02 - Specifications.pdf PDF
Attachment 10 - Site Visit Map.pdf PDF
Attachment 08 - Structural Calculations.pdf PDF
Attachment 05 - Lead Based Paint Inspection Report.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

C

B

GENERATOR ROOM

BOILER ROOM

STORAGE

CONTROL CENTER

678 5 4 3

D

1"ø

1 1/4"ø

6"ø

6"ø 6"ø

1 1/4"ø 1"ø

2"ø

2"ø

1 1/2"ø

1 1/4"ø 1"ø

1"ø1 1/4"ø

6"ø

1"ø 1"ø 1"ø 1"ø 1"ø 1"ø

1"ø1"ø1"ø1"ø1"ø1"ø

6"ø 6"ø 6"ø 6"ø 6"ø

4 4 4 4

E

C

B

OFFICE

MEZZANINE

TOILET

LOCKER

678 5 4 3

D

1"ø

1"ø

1"ø 1"ø

1"ø

6"ø

1"ø

6"ø

1"ø1"ø

6"ø

6"ø

4 4 4

RISER DETAIL NOTES

NOTE:

PROVIDE 2" ANNULAR SPACE AROUND FLOOR SLAB

PENETRATION AND SEAL WITH WEATHERPROOF

MASTIC.

DUCTILE IRON FLANGE X SPIGOT PIECE THROUGH

FLOOR SLAB

FLEXIBLE GROOVED PIPE COUPLING

OS&Y CONTROL VALVE WITH TAMPER SWITCH

DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY

2" MAIN DRAIN PIPED TO EXTERIOR

PRESSURE GAGE

4" SWING CHECK VALVE FOR FIRE DEPARTMENT

CONNECTION

2" AUTOMATIC BALL DRIP

WALL MOUNTED 2-WAY FIRE DEPARTMENT

CONNECTION

BUTTERFLY CONTROL VALVE FOR FORWARD FLOW

CONNECTION

4" FORWARD FLOW CONNECTION WITH CAP

VANE TYPE WATER FLOW SWITCH

4-WAY EARTHQUAKE BRACE

PIPING TO SYSTEM

INSPECTORS TEST CONNECTION AND PRESSURE15

RELIEF VALVE

16 NOT USED.

17 6" 24V ELECTRIC BELL INSTALLED BY FIRE SPRINKLER

CONTRACTOR, WIRED BY OTHERS.

18 NOT USED.

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT / ENGINEERS SEAL:CONSULTANTS:

321 4 5 6 7 8 9 10

B

IM

/2

R e p la c e S te a m

B o ile rs

/2

-M e c h C e n tr a l.

rv t

/3

/2

:1

:4

P

M

FX101

FIRST FLOOR AND MEZZANINE FIRE

PROTECTION PLAN

REPLACE STEAM BOILERS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 N. STATE HWY 89

PRESCOTT, ARIZONA 86313

649-22-104

08 APR 2026 JDD PSS

1 NO FIRE SPRINKLER PROTECTION IN SHADED AREA.

2 NEW 6" FIRE SPRINKLER RISER. REFER TO DETAIL F8/FX101.

3 NEW 6" FIRE LINE. SEE CIVIL DRAWINGS FOR CONTINUATION.

4 NEW UPRIGHT COVERAGE IN THIS AREA. DESIGNED FOR EXTRA HAZARD GROUP 2

HAZARD.

SHEET KEYNOTES

GENERAL SHEET NOTES

SCALE: 1/4" = 1'-0"F1

LEVEL 1 FIRE PROTECTION PLAN

1 THIS PROJECT INCLUDES THE INSTALLATION OF A NEW FIRE SPRINKLER SYSTEM IN

THE EXISTING CONTROL ROOM, ADJACENT STORAGE AREA, GENERATOR ROOM

AND MEZZANINE OFFICES. NO FIRE SPRINKLERS ARE TO BE INSTALLED IN THE

BOILER ROOM.

2 THESE DOCUMENTS ARE FOR SUBMITTAL REVIEW AND COORDINATION AND MAY BE

USED BY THE CONTRACTOR AS A DESIGN BASIS FOR INSTALLION DRAWINGS. THE

FIRE PROTECTION CONTRACTOR SHALL PROVIDE INSTALLATION DRAWINGS FOR

REVIEW AND APPROVAL PRIOR TO INSTALLATION.

3 CONTRACTOR IS RESPONSIBLE FOR FINAL INSTALLATION DESIGN, INCLUDING

HYDRAULIC CALCULATIONS, AND SHALL BE COORDINATED PRIOR TO FABRICATION.

DESIGNER SHALL BE A MINIMUM NICER LEVEL III TECHNICIAN OR LICENSED FIRE

PROTECTION ENGINEER.

4 THE FIRE SPRINKLER CONTRACTOR SHALL COORDINATE WITH THE FIRE ALARM

CONTRACTOR AND OTHER TRADES FOR PROVISION OF CONNECTIONS BETWEEN

THEIR RESPECTIVE SYSTEMS.

5 ALL MATERIALS ARE TO BE UL LISTED OR FM APPROVED FOR USE IN FIRE

PROTECTION SYSTEMS UNLESS OTHERWISE ALLOWED BY CODE OR AHJ.

6 MONITORING OF THE FIRE SPRINKLER SYSTEM SHALL BE PROVIDED BY THE FIRE

ALARM CONTRACTOR.

7 FITTINGS SHALL BE CAST IRON, MALLEABLE IRON, OR STEEL; ASTM B16.1, ASME

B16.3, ASTM A234, ASME B16.11 THREADED, ROLL- OR GROOVE-CUT.

8 HANGERS AND SEISMIC BRACING SHALL BE DESIGNED AND INSTALLED IN

ACCORDANCE WITH SPECIFICATION 13 05 41, NFPA 13, AND ASCE 7-05. ALL SEISMIC

BRACING IS REQUIRED TO BE STAMPED AND SIGNED BY A LICENSED STRUCTURAL

OR FIRE PROTECTION ENGINEER AND SUBMITTED FOR REVIEW. HANGER TYPES

SHALL BE SHOWN ON SHOP DRAWINGS WITH LOCATIONS INDICATED. SEISMIC

BRACING SHALL BE SHOWN ON SHOP DRAWINGS WITH LOCATIONS AND

AREA-OF-INFLUENCE.

9 DESIGN, FABRICATION, INSTALLATION, AND TESTING SHALL BE IN

ACCORDANCEWITH THE LATEST VERSIONS OF NFPA 101, NFPA 13, VA DESIGN

GUIDE, AND LOCAL VA REQUIREMENTS.

10 COORDINATE TESTING WITH OTHER TRADES AND VA PERSONNEL PRIOR TO

ACTION.

11 PIPE SIZES SHOWN ARE CONCEPTUAL AND ARE ESTIMATED FOR OCCUPANCY

HAZARD. INSTALLING CONTRACTOR SHALL PERFORM A WATER FLOW TEST FOR

USE IN HYDRALIC CALCULATIONS AND CONFIRM OR MODIFY PIPE SIZES.

NORTH

0 2' 4' 8'

SYMBOL LEGEND

SYMBOL DESCRIPTION

FIRE SPRINKLER

1/2" WHITE QUICK RESPONSE, RECESSED PENDANT.

1/2" SSU, K-5.6, BRASS QUICK RESPONSE.

SCALE: 1/4" = 1'-0"C1

LEVEL 2 FIRE PROTECTION PLAN

NORTH

0 2' 4' 8'

SCALE: NTSF8

FIRE RISER DETAIL

Revisions: Date:

ADDENDUM #2 06/29/2026

06/27/2025

Sheets
FX101 - FIRST FLOOR AND MEZZANINE FIRE PROTECTION PLAN