Amendment 0003 - Solicitation 36C26226B0017.pdf
PDF 237 KB Posted
- Attached to
- Prescott Replace Steam Boilers (Project No. 649-22-104) Federal contract opportunity
- Solicitation number
- 36C26226B0017
About this file
This is an Amendment 0003 to a solicitation for construction services issued by the Department of Veterans Affairs Network Contracting Office 22 in Long Beach, California. The amendment modifies Solicitation No. 36C26226B0017 for the Prescott Replace Steam Boilers project (Project No. 649-22-104), with an effective date of July 2, 2026. The amendment is not extended, meaning the original offer receipt deadline remains in effect. Offerors must acknowledge receipt of this amendment prior to the specified hour and date by completing the required items and returning copies of the amendment, acknowledging receipt on each copy of their offer, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer.
Amendment 0003 serves two primary purposes: it provides an RFI (Request for Information) Notice 01 and incorporates seventeen additional document attachments as part of the solicitation and resulting contract. These attachments include a revised design narrative and option descriptions, an archeological sensitivity map, network analysis schedules, mechanical and electrical piping plans, utilities drawings, fire protection plans, asbestos abatement plans, water utilities specifications, and standard details. All other terms and conditions of the solicitation remain unchanged and in full force and effect.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0003 07-02-2026
649-22-104
00262
Department of Veterans Affairs
Network Contracting Office 22
4811 Airport Plaza Drive
Suite 600
Long Beach CA 90815
00262
Department of Veterans Affairs
Network Contracting Office 22
4811 Airport Plaza Drive
Suite 600
Long Beach CA 90815
To all Offerors/Bidders
36C26226B0017
06-01-2026
X
X X
X 1
See SF30 Continuation Page
Amendment 0003 (SF30 Continuation of Block 14)
Solicitation No. 36C26226B0017, Prescott Replace Steam Boilers, Project No.: 649-22-104
The purpose of this Amendment 0003 is to:
1. Provide the attached RFI Notice 01.
2. Incorporate the following additional document attachments as part of this solicitation and the resulting contract:
Attachment 12 – Revised Design Narrative and Option Descriptions
Attachment 13 – VAMC Archeological Sensitivity Map
Attachment 14 – Section 01 32 16.13 – Network Analysis Schedules
Attachment 15 – Section 00 01 10 – Table of Contents - Revised
Attachment 16 – Section 23 22 13 – Steam and Condensate Heating Piping
Attachment 17 – Utilities Drawing
Attachment 18 – ENG Form 4288 – Submittal Register
Attachment 19 – MP100 – Basement Mechanical Piping Plan
Attachment 20 – MP101 – Level 1 Mechanical Piping Plan
Attachment 21 – ME502 – Mechanical Details
Attachment 22 – MP102 – Mechanical Piping Plan – Upper Level
Attachment 23 – EE501 – Electrical Details
Attachment 24 – Section 33 10 00 – Water Utilities – Revised
Attachment 25 – Maricopa Association of Governments Uniform Standard Details
Attachment 26 – FX101 – First Floor and Mezzanine Fire Protection Plan
Attachment 27 – EL202 – Mezzanine Floor Photometric Plan
Attachment 28 – HA101 – Basement and First Floor Asbestos Abatement Plan
3. All other terms and conditions remain unchanged.