This is a mechanical piping plan drawing for a steam boiler replacement project at the Northern Arizona VA Health Care System located at 500 N. State Highway 89, Prescott, Arizona 86313. The drawing is part of the formal construction documentation for Project Number 649-22-104, issued by the Office of Construction and Facilities Management under the U.S. Department of Veterans Affairs.
The mechanical plan details the installation of new steam and boiler feed water piping systems throughout the facility, with key requirements including: phased installation to minimize downtime with new work completed prior to demolition; scheduling of shutdowns and facility switchover with approval required 21 days in advance; fire-rated caulking of all pipe penetrations through exterior walls, roofing, and mechanical room walls; replacement of existing pipe hangers where piping is being replaced; X-ray verification of all new steam and boiler feed water welds; installation of a new deaerator tank in the same location as the existing unit with safety overflow; modification of existing catwalks for boiler access; replacement of high-pressure and installation of low-pressure steam piping throughout the plant to the existing tunnel; installation of new exhaust fans on the roof; installation of outdoor unit OU-1 with an 18-inch housekeeping pad; and extension of the exhaust flue servicing the generator room from the existing duct through the roof. The drawing scale is 1/4" = 1'-0", was approved on January 29, 2026, and includes Addendum #2 dated June 29, 2026, with the document set to expire on June 30, 2027.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
C
B
BOILER ROOM
OFFICE
MEZZANINE
TOILET
LOCKER
STEAM VTR
STEAM VTR
STEAM VTR
8"ø HPS
8"ø HPS
VTR
20"ø EA
20"ø EA
20"ø EA
20"ø EA UP
20"ø EA UP
20"ø EA UP
(E)2"ø V UP
(E)2"ø V UP
1"ø BFR DN
(E)2"ø V UP
2"ø V
2"ø V
8"ø HPS
2"ø V
EF-2
EF-3
EF-1
OU-15
LV-3
LV-2
8"ø EA
678 5 4 3
A
D
REFRIGERANT
PIPING TO IU-1
EF-44
TYP
4"ø HPS UP
4"ø V UP
1 1/2"ø V UP
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT / ENGINEERS SEAL:CONSULTANTS:
321 4 5 6 7 8 9 10
B
IM
/2
R e p la c e S te a m
B o ile rs
/2
-M e c h C e n tr a l.
rv t
/3
/2
:1
:5
P
M
MP102
MECHANICAL PIPING PLAN - UPPER
LEVEL
REPLACE STEAM BOILERS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 N. STATE HWY 89
PRESCOTT, ARIZONA 86313
649-22-104
08 APR 2026 KMK CDN
SCALE: 1/4" = 1'-0"F2
MECHANICAL NEW PLAN - MEZZANINE
SHEET KEYNOTES
GENERAL SHEET NOTES
1 CONTRACTOR TO PHASE NEW WORK WITH DEMOLITION TO MINIMIZE DOWNTIME.
NEW WORK TO BE INSTALLED PRIOR TO FINAL DEMOLITION.
2 SCHEDULE SHUTDOWNS AND SWITCH OVER THE FACILITY. PROVIDE PLAN FOR
APPROVAL 21 DAYS IN ADVANCE.
3 ALL PIPE PENETRATIONS THROUGH EXTERIOR WALLS, ROOFING, STAIRWAY
WALLS AND MECHANICAL ROOM WALLS TO BE SEALED WITH FIRE RATED CAULK.
4 EXISTING BOILER PIPING SUPPORT TO BE MODIFIED TO SUPPORT NEW STEAM
PIPING.
5 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE
HANGERS WHERE PIPE IS BEING REPLACED.
6 ALL NEW STEAM AND BOILER FEED WATER PIPING SHALL BE VERIFIED WITH X-RAY
TO ENSURE THAT WELDING IS PROPERLY SEALED.
1 INSTALL NEW DEAERATOR TANK AT LOCATION SHOWN. CONTRACTOR SHALL
INSTALL IN SAME LOCATION AS EXISTING DEAERATOR TANK. PROVIDE WITH
SAFETY OVERFLOW.
2 MODIFY EXISTING CATWALK AS REQUIRED FOR NEW BOILER ACCESS.
CONTRACTOR TO ENSURE ADEQUATE ACCESS TO ALL BOILER COMPONENTS IS
PROVIDED. REFER TO ARCHITECTURAL PLANS.
3 REPLACE EXISTING HIGH PRESSURE STEAM PIPING THROUGHOUT PLANT TO
EXISTING TUNNEL.
4 INSTALL NEW EXHAUST FANS ON ROOF. TYPICAL.
5 INSTALL OUTDOOR UNIT OU-1 WITH 18" HOUSEKEEPING PAD.
6 INSTALL NEW LOW PRESSURE STEAM PIPING THROUGHOUT PLANT TO EXISTING
TUNNEL.
7 EXTEND EXHAUST FLUE SERVICING GENERATOR ROOM FROM EXISTING DUCT UP
THROUGH ROOF.
8 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE
HANGERS WHERE PIPE IS BEING REPLACED.
9 INSTALL PIPE HANGER AT LOCATION SHOWN. CONTRACTOR SHALL BE
RESPONSIBLE FOR FINAL SHOP DRAWING LAYOUT.
EXPIRES 06/30/27
Da t e S i gned
KOSOR
44759
KEVIN M.R
e g i s t e r e d
Pr o f es s i o na l Eng i nee r (M echan i c a l )
C E
R T
I F I C A T E N
O
AR IZONA , U . S .A .
01/29/26
Revisions: Date:
ADDENDUM #2 06/29/2026
N O
R
TH
| Sheets |
| MP102 - MECHANICAL PIPING PLAN - UPPER LEVEL |
File details come from the government source that posted it. Updated .