Attachment 22 - MP102 - MECHANICAL PIPING PLAN - UPPER LEVEL.pdf

PDF 1 MB Posted

Attached to
Prescott Replace Steam Boilers (Project No. 649-22-104) Federal contract opportunity
Solicitation number
36C26226B0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This is a mechanical piping plan drawing for a steam boiler replacement project at the Northern Arizona VA Health Care System located at 500 N. State Highway 89, Prescott, Arizona 86313. The drawing is part of the formal construction documentation for Project Number 649-22-104, issued by the Office of Construction and Facilities Management under the U.S. Department of Veterans Affairs.

The mechanical plan details the installation of new steam and boiler feed water piping systems throughout the facility, with key requirements including: phased installation to minimize downtime with new work completed prior to demolition; scheduling of shutdowns and facility switchover with approval required 21 days in advance; fire-rated caulking of all pipe penetrations through exterior walls, roofing, and mechanical room walls; replacement of existing pipe hangers where piping is being replaced; X-ray verification of all new steam and boiler feed water welds; installation of a new deaerator tank in the same location as the existing unit with safety overflow; modification of existing catwalks for boiler access; replacement of high-pressure and installation of low-pressure steam piping throughout the plant to the existing tunnel; installation of new exhaust fans on the roof; installation of outdoor unit OU-1 with an 18-inch housekeeping pad; and extension of the exhaust flue servicing the generator room from the existing duct through the roof. The drawing scale is 1/4" = 1'-0", was approved on January 29, 2026, and includes Addendum #2 dated June 29, 2026, with the document set to expire on June 30, 2027.

View the file

Other files for this federal contract opportunity

Other files attached to Prescott Replace Steam Boilers (Project No. 649-22-104), newest first.
File Type Posted
Award Notice 36C26226C0255.pdf PDF
Amendment 0004 - Solicitation 36C26226B0017.pdf PDF
Attachment 28 - HA101 - BASMENT AND FIRST FLOOR ASBESTOS ABATEMENT PLAN.pdf PDF
Attachment 26 - FX101 - FIRST FLOOR AND MEZZANINE FIRE PROTECTION PLAN.pdf PDF
Attachment 25 - Maricopa Association of Governments Uniform Standard Details.pdf PDF
Attachment 24 - Section 33 10 00 - Water Utilities_Revised.pdf PDF
Attachment 23 - EE501 - ELECTRICAL DETAILS.pdf PDF
Attachment 19 - MP100 - BASEMENT MECHANICAL PIPING PLAN.pdf PDF
Attachment 18 - ENG Form 4288 - Submittal Register.pdf PDF
Attachment 17 - Utilities Drawing.pdf PDF
Attachment 16 - Section 23 22 13 - Steam and Condensate Heating Piping.pdf PDF
Amendment 0003 - Solicitation 36C26226B0017.pdf PDF
Attachment 21 - ME502 - MECHANICAL DETAILS.pdf PDF
Attachment 14 - Section 01 32 16.13 - Network Analysis Schedules.pdf PDF
Attachment 13 - VAMC Archeological Sensitivity Map.pdf PDF
Attachment 27 - EL202 - MEZZANINE FLOOR PHOTOMETRIC PLAN.pdf PDF
Attachment 20 - MP101 - LEVEL 1 MECHANICAL PIPING PLAN.pdf PDF
Attachment 15 - Section 00 01 10 - Table of Contents_Revised.pdf PDF
Attachment 12 - Revised Design Narrative and Option Descriptions.pdf PDF
RFI Notice 01 - Solicitation No. 36C26226B0017.pdf PDF
Amendment 0002 - Solicitation 36C26226B0017.pdf PDF
Attachment 11 - Site Visit Sign-in Sheet.pdf PDF
Amendment 0001 - Solicitation 36C26226B0017.pdf PDF
Attachment 06 - Asbestos Survey Report.pdf PDF
Attachment 03 - Drawings.pdf PDF
Attachment 10 - Site Visit Map.pdf PDF
Attachment 08 - Structural Calculations.pdf PDF
Attachment 05 - Lead Based Paint Inspection Report.pdf PDF
Attachment 07 - Design Narrative and Option Descriptions.pdf PDF
Attachment 04 - Wage Rate Determination.pdf PDF
Attachment 01 - Statement of Work.pdf PDF
Solicitation 36C26226B0017.pdf PDF
Attachment 09 - VHA Boiler Associated Plant Safety Device Testing Manual.pdf PDF
Attachment 02 - Specifications.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

C

B

BOILER ROOM

OFFICE

MEZZANINE

TOILET

LOCKER

STEAM VTR

STEAM VTR

STEAM VTR

8"ø HPS

8"ø HPS

VTR

20"ø EA

20"ø EA

20"ø EA

20"ø EA UP

20"ø EA UP

20"ø EA UP

(E)2"ø V UP

(E)2"ø V UP

1"ø BFR DN

(E)2"ø V UP

2"ø V

2"ø V

8"ø HPS

2"ø V

EF-2

EF-3

EF-1

OU-15

LV-3

LV-2

8"ø EA

678 5 4 3

A

D

REFRIGERANT

PIPING TO IU-1

EF-44

TYP

4"ø HPS UP

4"ø V UP

1 1/2"ø V UP

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT / ENGINEERS SEAL:CONSULTANTS:

321 4 5 6 7 8 9 10

B

IM

/2

R e p la c e S te a m

B o ile rs

/2

-M e c h C e n tr a l.

rv t

/3

/2

:1

:5

P

M

MP102

MECHANICAL PIPING PLAN - UPPER

LEVEL

REPLACE STEAM BOILERS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 N. STATE HWY 89

PRESCOTT, ARIZONA 86313

649-22-104

08 APR 2026 KMK CDN

SCALE: 1/4" = 1'-0"F2

MECHANICAL NEW PLAN - MEZZANINE

SHEET KEYNOTES

GENERAL SHEET NOTES

1 CONTRACTOR TO PHASE NEW WORK WITH DEMOLITION TO MINIMIZE DOWNTIME.

NEW WORK TO BE INSTALLED PRIOR TO FINAL DEMOLITION.

2 SCHEDULE SHUTDOWNS AND SWITCH OVER THE FACILITY. PROVIDE PLAN FOR

APPROVAL 21 DAYS IN ADVANCE.

3 ALL PIPE PENETRATIONS THROUGH EXTERIOR WALLS, ROOFING, STAIRWAY

WALLS AND MECHANICAL ROOM WALLS TO BE SEALED WITH FIRE RATED CAULK.

4 EXISTING BOILER PIPING SUPPORT TO BE MODIFIED TO SUPPORT NEW STEAM

PIPING.

5 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE

HANGERS WHERE PIPE IS BEING REPLACED.

6 ALL NEW STEAM AND BOILER FEED WATER PIPING SHALL BE VERIFIED WITH X-RAY

TO ENSURE THAT WELDING IS PROPERLY SEALED.

1 INSTALL NEW DEAERATOR TANK AT LOCATION SHOWN. CONTRACTOR SHALL

INSTALL IN SAME LOCATION AS EXISTING DEAERATOR TANK. PROVIDE WITH

SAFETY OVERFLOW.

2 MODIFY EXISTING CATWALK AS REQUIRED FOR NEW BOILER ACCESS.

CONTRACTOR TO ENSURE ADEQUATE ACCESS TO ALL BOILER COMPONENTS IS

PROVIDED. REFER TO ARCHITECTURAL PLANS.

3 REPLACE EXISTING HIGH PRESSURE STEAM PIPING THROUGHOUT PLANT TO

EXISTING TUNNEL.

4 INSTALL NEW EXHAUST FANS ON ROOF. TYPICAL.

5 INSTALL OUTDOOR UNIT OU-1 WITH 18" HOUSEKEEPING PAD.

6 INSTALL NEW LOW PRESSURE STEAM PIPING THROUGHOUT PLANT TO EXISTING

TUNNEL.

7 EXTEND EXHAUST FLUE SERVICING GENERATOR ROOM FROM EXISTING DUCT UP

THROUGH ROOF.

8 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE

HANGERS WHERE PIPE IS BEING REPLACED.

9 INSTALL PIPE HANGER AT LOCATION SHOWN. CONTRACTOR SHALL BE

RESPONSIBLE FOR FINAL SHOP DRAWING LAYOUT.

EXPIRES 06/30/27

Da t e S i gned

KOSOR

44759

KEVIN M.R

e g i s t e r e d

Pr o f es s i o na l Eng i nee r (M echan i c a l )

C E

R T

I F I C A T E N

O

AR IZONA , U . S .A .

01/29/26

Revisions: Date:

ADDENDUM #2 06/29/2026

N O

R

TH

Sheets
MP102 - MECHANICAL PIPING PLAN - UPPER LEVEL

File details come from the government source that posted it. Updated .