Attachment 20 - MP101 - LEVEL 1 MECHANICAL PIPING PLAN.pdf

PDF 1 MB Posted

Attached to
Prescott Replace Steam Boilers (Project No. 649-22-104) Federal contract opportunity
Solicitation number
36C26226B0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This is a mechanical piping plan drawing for a steam boiler replacement project at the Northern Arizona VA Health Care System in Prescott, Arizona. The drawing, dated 08 APR 2026 with Addendum #2 issued 06/29/2026, depicts Level 1 mechanical systems including three new water tube steam boilers (SB-1, SB-2, SB-3) to be installed on existing concrete pads in the boiler room. The project requires comprehensive piping modifications including new boiler feed water supply lines throughout the facility, new steam headers with pressure sensors, new blowoff tanks, replacement of the condensate storage tank, and installation of fuel oil piping connections. All new steam and boiler feed water piping must be verified with X-ray to ensure proper welding seals.

Key work items include replacing existing pipe hangers where pipe is being replaced, installing new chemical feed systems with dissolved solids sensors, modifying the existing gas detection system, providing new exhaust gas analyzers integrated into the control system, installing a new packaged heat pump with refrigerant piping to a rooftop condensing unit, adding make-up air louvers with steam radiators, and installing temporary boiler connections for emergency use. The contractor must phase new work with demolition to minimize downtime, schedule facility shutdowns 21 days in advance, seal all pipe penetrations through exterior walls and mechanical room walls with fire-rated caulk, and coordinate pipe hanger locations with structural elements. The drawing includes detailed keynotes addressing specific installation requirements and modifications to accommodate the new boiler system infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to Prescott Replace Steam Boilers (Project No. 649-22-104), newest first.
File Type Posted
Award Notice 36C26226C0255.pdf PDF
Amendment 0004 - Solicitation 36C26226B0017.pdf PDF
Attachment 28 - HA101 - BASMENT AND FIRST FLOOR ASBESTOS ABATEMENT PLAN.pdf PDF
Attachment 26 - FX101 - FIRST FLOOR AND MEZZANINE FIRE PROTECTION PLAN.pdf PDF
Attachment 25 - Maricopa Association of Governments Uniform Standard Details.pdf PDF
Attachment 24 - Section 33 10 00 - Water Utilities_Revised.pdf PDF
Attachment 23 - EE501 - ELECTRICAL DETAILS.pdf PDF
Attachment 21 - ME502 - MECHANICAL DETAILS.pdf PDF
Attachment 14 - Section 01 32 16.13 - Network Analysis Schedules.pdf PDF
Attachment 13 - VAMC Archeological Sensitivity Map.pdf PDF
Attachment 22 - MP102 - MECHANICAL PIPING PLAN - UPPER LEVEL.pdf PDF
Attachment 19 - MP100 - BASEMENT MECHANICAL PIPING PLAN.pdf PDF
Attachment 18 - ENG Form 4288 - Submittal Register.pdf PDF
Attachment 17 - Utilities Drawing.pdf PDF
Attachment 16 - Section 23 22 13 - Steam and Condensate Heating Piping.pdf PDF
Amendment 0003 - Solicitation 36C26226B0017.pdf PDF
Attachment 27 - EL202 - MEZZANINE FLOOR PHOTOMETRIC PLAN.pdf PDF
Attachment 15 - Section 00 01 10 - Table of Contents_Revised.pdf PDF
Attachment 12 - Revised Design Narrative and Option Descriptions.pdf PDF
RFI Notice 01 - Solicitation No. 36C26226B0017.pdf PDF
Amendment 0002 - Solicitation 36C26226B0017.pdf PDF
Attachment 11 - Site Visit Sign-in Sheet.pdf PDF
Amendment 0001 - Solicitation 36C26226B0017.pdf PDF
Attachment 06 - Asbestos Survey Report.pdf PDF
Attachment 03 - Drawings.pdf PDF
Attachment 07 - Design Narrative and Option Descriptions.pdf PDF
Attachment 04 - Wage Rate Determination.pdf PDF
Attachment 01 - Statement of Work.pdf PDF
Solicitation 36C26226B0017.pdf PDF
Attachment 10 - Site Visit Map.pdf PDF
Attachment 08 - Structural Calculations.pdf PDF
Attachment 05 - Lead Based Paint Inspection Report.pdf PDF
Attachment 09 - VHA Boiler Associated Plant Safety Device Testing Manual.pdf PDF
Attachment 02 - Specifications.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

E

C

B

GENERATOR ROOM

BOILER ROOM

STORAGE

SB-3

SB-2

SB-1

BOILER 1

BOILER 2

BOILER 3

8 9

FM-1

TO TEMPORARY SKID BOILERS

(SEE SHEET PHASING PLAN)

13 14

13 14

13 14

6 10 15

56 10 15

8"ø HPS UP

(TYP. 3)

(TYP. 3)

(TYP. 3)

(TYP. 3)

(TYP. 3)

(TYP. 3)

(TYP. 3)

(TYP. 3)

3"ø BFS UP

8"ø HPS UP

8"ø HPS UP

2"ø V UP 1 1/2"ø BO

(TYP. 2)

2"ø V UP 1 1/2"ø BO

(TYP. 2)

1 1/2"ø BO

(TYP. 2)

IU-122

1 1/2"ø BO

1 1/2"ø BO

2"ø V UP

14"/14"FO SA18"/18"FO SA

SD-1

(TYP. 4)

LV-1 24

BT-1

67 5 4 3

A

D

REFRIGERANT

PIPING TO OU-1

(E)8"ø EA

CONDENSATE DRAIN

PIPING

8"ø HPS 1 1/2"ø BFS

LV-4 24

TO SEWER

2 1/2"ø DCW

2"ø DCW

3"ø DCW

2"ø DCW

(E)4"ø DCW

3/4"ø DCW

2"ø LPS

2"ø LPS

2"ø HPR

8"ø HPS

8"ø HPS UP

6"ø HPS UP

6"ø HPS UP

6"ø HPS UP

6"ø HPS UP

4"ø HPS UP

4"ø HPS UP

1"ø HPS UP

2"ø LPS

4"ø G

3/4"ø PG

4"ø G

3/4"ø PG

(E)1"ø CA

1"ø FOR

2"ø LPS 2"ø LPR 2"ø BFR

2 1/2"ø BFS 3"ø CT 3"ø SW 3"ø DCW

2"ø HPR

2 1/2"ø BF-1 2 1/2"ø BF-2

1 1/2"ø BO 3/4"ø HPR

2"ø BFR DN

2"ø SS DN

3"ø BFS

3"ø BFS

2"ø BFR

2 1/2"ø BF-1 UP

2 1/2"ø BF-2 UP

1 1/2"ø BO

1 1/2"ø HPR

1 1/2"ø BF-1

1 1/2"ø BF-2

2"ø FOS 1"ø FOR 2"ø FOS

1"ø FOR

1"ø FOR

3"ø V UP

2"ø BFR DN

2"ø FOS

1 1/2"ø BF-1

1 1/2"ø BF-2

3/4"ø LPR

(TYP. 3)

2"ø LPR

2"ø G3/4"ø PG

1"ø CA

1"ø FORFOS/R

2 1/2"ø FOS

2"ø FOR

2 1/2"ø CTS DN

1"ø CTR DN

3/4"ø DCW

2"ø LPR

3"ø DCW 3"ø SW

6"ø HPS 8"ø HPS

3"ø CT

2"ø LPS 2"ø HPR

TYP

3"ø SW

(TYP. 2)

(TYP. 2)

1"ø CTR UP

2 1/2"ø CTS

2 1/2"ø CT

1 1/2"ø BFS

1 1/2"ø BFS 4"ø G

6"ø HPS 2"ø G

1 1/4"ø FOS/R

FOS/R

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT / ENGINEERS SEAL:CONSULTANTS:

321 4 5 6 7 8 9 10

B

IM

/2

R e p la c e S te a m

B o ile rs

/2

-M e c h C e n tr a l.

rv t

/3

/2

:1

:4

P

M

MP101

LEVEL 1 MECHANICAL PIPING PLAN

REPLACE STEAM BOILERS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 N. STATE HWY 89

PRESCOTT, ARIZONA 86313

649-22-104

08 APR 2026 KMK CDN

1 CONTRACTOR TO PHASE NEW WORK WITH DEMOLITION TO MINIMIZE DOWNTIME.

NEW WORK TO BE INSTALLED PRIOR TO FINAL DEMOLITION.

2 SCHEDULE SHUTDOWNS AND SWITCH OVER THE FACILITY. PROVIDE PLAN FOR

APPROVAL 21 DAYS IN ADVANCE.

3 ALL PIPE PENETRATIONS THROUGH EXTERIOR WALLS, ROOFING, STAIRWAY

WALLS AND MECHANICAL ROOM WALLS TO BE SEALED WITH FIRE RATED CAULK.

4 EXISTING BOILER PIPING SUPPORT TO BE MODIFIED TO SUPPORT NEW STEAM

PIPING.

5 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE

HANGERS WHERE PIPE IS BEING REPLACED.

6 ALL NEW STEAM AND BOILER FEED WATER PIPING SHALL BE VERIFIED WITH X-RAY

TO ENSURE THAT WELDING IS PROPERLY SEALED.

1 INSTALL NEW WATER TUBE STEAM BOILER ON EXISTING CONCRETE PAD. MODIFY

EXISTING PAD AS REQUIRED.

2 INSTALL NEW BLOWOFF TANK AND EXTEND NEW PIPING AS SHOWN.

3 INSTALL FLOW METER AT LOCATION SHOWN.

4 NEW BOILER BLOW DOWN PIPING TO NEW BLOWDOWN TANK.

5 PROVIDE NEW MANUAL 3 WAY VALVE WITH SWITCH FOR GAS CHANGEOVER.

6 PROVIDE NEW BOILER GAS FUEL TRAIN AND METER PER VA SPECIFICATIONS.

7 PROVIDE NEW WATER FEED METERS AND VALVING.

8 REPLACE EXISTING CHEMICAL FEED SYSTEM WITH NEW DISSOLVED SOLIDS

SENSOR.

9 REPLACE EXISTING CHEMICAL TANKS AND ASSOCIATED FEED PUMPS.

10 CONTRACTOR SHALL MODIFY EXISTING GAS DETECTION SYSTEM AS REQUIRED TO

INCORPORATE INTO NEW CONTROLS SYSTEM. EXTEND TESTING PORTS AS

REQUIRED TO ALLOW FOR TESTING FROM GROUND LEVEL.

11 PROVIDE NEW EXHAUST GAS ANALYZER. INTEGRATE INTO NEW CONTROL SYSTEM

WITH PROVISION FOR APPLYING CALIBRATION AND TEST GASES FROM FLOOR

LEVEL.

12 INSTALL NEW AUTOMATIC CHEMICAL FEEDER FOR DEAERATOR IN SAME LOCATION

AS EXISTING.

13 CONTRACTOR TO OFFSET VENT AS NECESSARY TO ALLOW NEW BOILER AND

ASSOCIATED SAFETY VALVES TO BE INSTALLED. SEE SHEET ME502.

14 VENT ON BOILER STEAM DRUM TO EXTEND THROUGH ROOF.

15 PROVIDE NEW SPRING LOADED PIPE HANGAR. COORDINATE LOCATION WITH

STRUCTURAL.

16 INSTALL NEW AUTOMATIC CHEMICAL FEEDER FOR BOILERS IN SAME LOCATION AS

EXISTING.

17 INSTALL NEW AUTOMATIC CHEMICAL FEEDER FOR CONDENSATE TANK IN SAME

LOCATION AS EXISTING.

18 BOILER METERS TO BE REPLACED WITH NEW BOILER CONTROL SYSTEM.

19 NEW CONTROL PANELS TO BE INSTALLED.

20 EXISTING COMPRESSOR TO REMAIN.

21 EXISTING AIR TANK TO REMAIN.

22 INSTALL NEW PACKAGED HEAT PUMP AT LOCATION SHOWN. EXTEND NEW

SUPPLY/RETURN DUCTWORK AS INDICATED. SIZE AND INSTALL REFRIGERANT

PIPING PER MANUFACTURER'S LITERATURE AND EXTEND TO CONDENSING UNIT ON

ROOF OU-1. EXTEND 3/4" CONDENSATE DRAIN TO LANDSCAPE AS SHOWN.

23 INSTALL NEW TEMPERATURE SENSOR AT LOCATION SHOWN 48" AFF.

24 INSTALL MAKE-UP AIR LOUVER 12" ABOVE GRADE. INSTALL STEAM RADIATOR ON

INTERIOR OF LOUVER AND EXTEND STEAM AND CONDENSATE RETURN PIPING TO

NEAREST MAIN.

25 REPLACE EXISTING CONDENSATE STORAGE TANK. CONTRACTOR TO INSTALL NEW

PIPING AS SHOWN.

26 INSTALL NEW BOILER FEED SUPPLY PIPING THROUGHOUT PLANT AS SHOWN.

27 REPLACE EXISTING STEAM HEADER. PROVIDE NEW STEAM HEADER PRESSURE

SENSOR TO BE INTEGRATED INTO NEW BOILER CONTROL SYSTEMS.

28 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE

HANGERS WHERE PIPE IS BEING REPLACED.

29 NEW FEED WATER PIPING TO ECONOMIZERS AND BOILERS.

30 INSTALL NEW FUEL OIL PIPING AT POINT OF CONNECTION SHOWN.

31 INSTALL PIPE HANGER AT LOCATION SHOWN. CONTRACTOR SHALL BE

RESPONSIBLE FOR FINAL SHOP DRAWING LAYOUT.

32 PROVIDE STEAM, NATURAL GAS, AND BOILER FEEDWATER TEMPORARY

CONNECTIONS AS INDICATED AT LOCATION SHOWN FOR EMERGENCY BOILER

CONNECTION.

33 BOILER STEAM PIPING FOR TEMPORARY BOILERS SHALL BE SUPPORTED FROM

BUILDING STRUCTURE AND TEMPORARY BOILER SKID AT THIS LOCATION. ALL

PIPING SHALL BE PROPERLY ANCHORED AND ADEQUATELY PROTECTED FROM

ACCIDENTAL DAMAGE AND APPROVED BY VA PRIOR TO INSTALLATION.

34 BOILER NATURAL GAS PIPING FOR TEMPORARY BOILERS SHALL BE SUPPORTED

FROM BUILDING STRUCTURE AND GO UNDERGROUND OUTSIDE OF BUILDING.

REFER TO GI-003 FOR CONTINUATION.

35 1-1/4" FOS/R FOR TEMPORARY BOILERS SHALL BE SUPPORTED FROM BUILDING

STRUCTURE AND GO UNDERGROUND OUTSIDE OF BUILDING. REFER TO GI-003 FOR

CONTINUATION.

SHEET KEYNOTES

GENERAL SHEET NOTES

SCALE: 1/4" = 1'-0"F2

MECHANICAL NEW PLAN -LEVEL 1

EXPIRES 06/30/27

Da t e S i gned

KOSOR

44759

KEVIN M.R

e g i s t e r e d

Pr o f es s i o na l Eng i nee r (M echan i c a l )

C E

R T

I F I C A T E N

O

AR IZONA , U . S .A .

01/29/26

Revisions: Date:

ADDENDUM #2 06/29/2026

N O

R

TH

Sheets
MP101 - LEVEL 1 MECHANICAL PIPING PLAN