This is a mechanical piping plan drawing for a steam boiler replacement project at the Northern Arizona VA Health Care System in Prescott, Arizona. The drawing, dated 08 APR 2026 with Addendum #2 issued 06/29/2026, depicts Level 1 mechanical systems including three new water tube steam boilers (SB-1, SB-2, SB-3) to be installed on existing concrete pads in the boiler room. The project requires comprehensive piping modifications including new boiler feed water supply lines throughout the facility, new steam headers with pressure sensors, new blowoff tanks, replacement of the condensate storage tank, and installation of fuel oil piping connections. All new steam and boiler feed water piping must be verified with X-ray to ensure proper welding seals.
Key work items include replacing existing pipe hangers where pipe is being replaced, installing new chemical feed systems with dissolved solids sensors, modifying the existing gas detection system, providing new exhaust gas analyzers integrated into the control system, installing a new packaged heat pump with refrigerant piping to a rooftop condensing unit, adding make-up air louvers with steam radiators, and installing temporary boiler connections for emergency use. The contractor must phase new work with demolition to minimize downtime, schedule facility shutdowns 21 days in advance, seal all pipe penetrations through exterior walls and mechanical room walls with fire-rated caulk, and coordinate pipe hanger locations with structural elements. The drawing includes detailed keynotes addressing specific installation requirements and modifications to accommodate the new boiler system infrastructure.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
E
C
B
GENERATOR ROOM
BOILER ROOM
STORAGE
SB-3
SB-2
SB-1
BOILER 1
BOILER 2
BOILER 3
8 9
FM-1
TO TEMPORARY SKID BOILERS
(SEE SHEET PHASING PLAN)
13 14
13 14
13 14
6 10 15
56 10 15
8"ø HPS UP
(TYP. 3)
(TYP. 3)
(TYP. 3)
(TYP. 3)
(TYP. 3)
(TYP. 3)
(TYP. 3)
(TYP. 3)
3"ø BFS UP
8"ø HPS UP
8"ø HPS UP
2"ø V UP 1 1/2"ø BO
(TYP. 2)
2"ø V UP 1 1/2"ø BO
(TYP. 2)
1 1/2"ø BO
(TYP. 2)
IU-122
1 1/2"ø BO
1 1/2"ø BO
2"ø V UP
14"/14"FO SA18"/18"FO SA
SD-1
(TYP. 4)
LV-1 24
BT-1
67 5 4 3
A
D
REFRIGERANT
PIPING TO OU-1
(E)8"ø EA
CONDENSATE DRAIN
PIPING
8"ø HPS 1 1/2"ø BFS
LV-4 24
TO SEWER
2 1/2"ø DCW
2"ø DCW
3"ø DCW
2"ø DCW
(E)4"ø DCW
3/4"ø DCW
2"ø LPS
2"ø LPS
2"ø HPR
8"ø HPS
8"ø HPS UP
6"ø HPS UP
6"ø HPS UP
6"ø HPS UP
6"ø HPS UP
4"ø HPS UP
4"ø HPS UP
1"ø HPS UP
2"ø LPS
4"ø G
3/4"ø PG
4"ø G
3/4"ø PG
(E)1"ø CA
1"ø FOR
2"ø LPS 2"ø LPR 2"ø BFR
2 1/2"ø BFS 3"ø CT 3"ø SW 3"ø DCW
2"ø HPR
2 1/2"ø BF-1 2 1/2"ø BF-2
1 1/2"ø BO 3/4"ø HPR
2"ø BFR DN
2"ø SS DN
3"ø BFS
3"ø BFS
2"ø BFR
2 1/2"ø BF-1 UP
2 1/2"ø BF-2 UP
1 1/2"ø BO
1 1/2"ø HPR
1 1/2"ø BF-1
1 1/2"ø BF-2
2"ø FOS 1"ø FOR 2"ø FOS
1"ø FOR
1"ø FOR
3"ø V UP
2"ø BFR DN
2"ø FOS
1 1/2"ø BF-1
1 1/2"ø BF-2
3/4"ø LPR
(TYP. 3)
2"ø LPR
2"ø G3/4"ø PG
1"ø CA
1"ø FORFOS/R
2 1/2"ø FOS
2"ø FOR
2 1/2"ø CTS DN
1"ø CTR DN
3/4"ø DCW
2"ø LPR
3"ø DCW 3"ø SW
6"ø HPS 8"ø HPS
3"ø CT
2"ø LPS 2"ø HPR
TYP
3"ø SW
(TYP. 2)
(TYP. 2)
1"ø CTR UP
2 1/2"ø CTS
2 1/2"ø CT
1 1/2"ø BFS
1 1/2"ø BFS 4"ø G
6"ø HPS 2"ø G
1 1/4"ø FOS/R
FOS/R
324 S. State St., Suite 400 Salt Lake City, UT 84111
800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT / ENGINEERS SEAL:CONSULTANTS:
321 4 5 6 7 8 9 10
B
IM
/2
R e p la c e S te a m
B o ile rs
/2
-M e c h C e n tr a l.
rv t
/3
/2
:1
:4
P
M
MP101
LEVEL 1 MECHANICAL PIPING PLAN
REPLACE STEAM BOILERS
NORTHERN ARIZONA VA HEALTH CARE SYSTEM
500 N. STATE HWY 89
PRESCOTT, ARIZONA 86313
649-22-104
08 APR 2026 KMK CDN
1 CONTRACTOR TO PHASE NEW WORK WITH DEMOLITION TO MINIMIZE DOWNTIME.
NEW WORK TO BE INSTALLED PRIOR TO FINAL DEMOLITION.
2 SCHEDULE SHUTDOWNS AND SWITCH OVER THE FACILITY. PROVIDE PLAN FOR
APPROVAL 21 DAYS IN ADVANCE.
3 ALL PIPE PENETRATIONS THROUGH EXTERIOR WALLS, ROOFING, STAIRWAY
WALLS AND MECHANICAL ROOM WALLS TO BE SEALED WITH FIRE RATED CAULK.
4 EXISTING BOILER PIPING SUPPORT TO BE MODIFIED TO SUPPORT NEW STEAM
PIPING.
5 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE
HANGERS WHERE PIPE IS BEING REPLACED.
6 ALL NEW STEAM AND BOILER FEED WATER PIPING SHALL BE VERIFIED WITH X-RAY
TO ENSURE THAT WELDING IS PROPERLY SEALED.
1 INSTALL NEW WATER TUBE STEAM BOILER ON EXISTING CONCRETE PAD. MODIFY
EXISTING PAD AS REQUIRED.
2 INSTALL NEW BLOWOFF TANK AND EXTEND NEW PIPING AS SHOWN.
3 INSTALL FLOW METER AT LOCATION SHOWN.
4 NEW BOILER BLOW DOWN PIPING TO NEW BLOWDOWN TANK.
5 PROVIDE NEW MANUAL 3 WAY VALVE WITH SWITCH FOR GAS CHANGEOVER.
6 PROVIDE NEW BOILER GAS FUEL TRAIN AND METER PER VA SPECIFICATIONS.
7 PROVIDE NEW WATER FEED METERS AND VALVING.
8 REPLACE EXISTING CHEMICAL FEED SYSTEM WITH NEW DISSOLVED SOLIDS
SENSOR.
9 REPLACE EXISTING CHEMICAL TANKS AND ASSOCIATED FEED PUMPS.
10 CONTRACTOR SHALL MODIFY EXISTING GAS DETECTION SYSTEM AS REQUIRED TO
INCORPORATE INTO NEW CONTROLS SYSTEM. EXTEND TESTING PORTS AS
REQUIRED TO ALLOW FOR TESTING FROM GROUND LEVEL.
11 PROVIDE NEW EXHAUST GAS ANALYZER. INTEGRATE INTO NEW CONTROL SYSTEM
WITH PROVISION FOR APPLYING CALIBRATION AND TEST GASES FROM FLOOR
LEVEL.
12 INSTALL NEW AUTOMATIC CHEMICAL FEEDER FOR DEAERATOR IN SAME LOCATION
AS EXISTING.
13 CONTRACTOR TO OFFSET VENT AS NECESSARY TO ALLOW NEW BOILER AND
ASSOCIATED SAFETY VALVES TO BE INSTALLED. SEE SHEET ME502.
14 VENT ON BOILER STEAM DRUM TO EXTEND THROUGH ROOF.
15 PROVIDE NEW SPRING LOADED PIPE HANGAR. COORDINATE LOCATION WITH
STRUCTURAL.
16 INSTALL NEW AUTOMATIC CHEMICAL FEEDER FOR BOILERS IN SAME LOCATION AS
EXISTING.
17 INSTALL NEW AUTOMATIC CHEMICAL FEEDER FOR CONDENSATE TANK IN SAME
LOCATION AS EXISTING.
18 BOILER METERS TO BE REPLACED WITH NEW BOILER CONTROL SYSTEM.
19 NEW CONTROL PANELS TO BE INSTALLED.
20 EXISTING COMPRESSOR TO REMAIN.
21 EXISTING AIR TANK TO REMAIN.
22 INSTALL NEW PACKAGED HEAT PUMP AT LOCATION SHOWN. EXTEND NEW
SUPPLY/RETURN DUCTWORK AS INDICATED. SIZE AND INSTALL REFRIGERANT
PIPING PER MANUFACTURER'S LITERATURE AND EXTEND TO CONDENSING UNIT ON
ROOF OU-1. EXTEND 3/4" CONDENSATE DRAIN TO LANDSCAPE AS SHOWN.
23 INSTALL NEW TEMPERATURE SENSOR AT LOCATION SHOWN 48" AFF.
24 INSTALL MAKE-UP AIR LOUVER 12" ABOVE GRADE. INSTALL STEAM RADIATOR ON
INTERIOR OF LOUVER AND EXTEND STEAM AND CONDENSATE RETURN PIPING TO
NEAREST MAIN.
25 REPLACE EXISTING CONDENSATE STORAGE TANK. CONTRACTOR TO INSTALL NEW
PIPING AS SHOWN.
26 INSTALL NEW BOILER FEED SUPPLY PIPING THROUGHOUT PLANT AS SHOWN.
27 REPLACE EXISTING STEAM HEADER. PROVIDE NEW STEAM HEADER PRESSURE
SENSOR TO BE INTEGRATED INTO NEW BOILER CONTROL SYSTEMS.
28 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE
HANGERS WHERE PIPE IS BEING REPLACED.
29 NEW FEED WATER PIPING TO ECONOMIZERS AND BOILERS.
30 INSTALL NEW FUEL OIL PIPING AT POINT OF CONNECTION SHOWN.
31 INSTALL PIPE HANGER AT LOCATION SHOWN. CONTRACTOR SHALL BE
RESPONSIBLE FOR FINAL SHOP DRAWING LAYOUT.
32 PROVIDE STEAM, NATURAL GAS, AND BOILER FEEDWATER TEMPORARY
CONNECTIONS AS INDICATED AT LOCATION SHOWN FOR EMERGENCY BOILER
CONNECTION.
33 BOILER STEAM PIPING FOR TEMPORARY BOILERS SHALL BE SUPPORTED FROM
BUILDING STRUCTURE AND TEMPORARY BOILER SKID AT THIS LOCATION. ALL
PIPING SHALL BE PROPERLY ANCHORED AND ADEQUATELY PROTECTED FROM
ACCIDENTAL DAMAGE AND APPROVED BY VA PRIOR TO INSTALLATION.
34 BOILER NATURAL GAS PIPING FOR TEMPORARY BOILERS SHALL BE SUPPORTED
FROM BUILDING STRUCTURE AND GO UNDERGROUND OUTSIDE OF BUILDING.
REFER TO GI-003 FOR CONTINUATION.
35 1-1/4" FOS/R FOR TEMPORARY BOILERS SHALL BE SUPPORTED FROM BUILDING
STRUCTURE AND GO UNDERGROUND OUTSIDE OF BUILDING. REFER TO GI-003 FOR
CONTINUATION.
SHEET KEYNOTES
GENERAL SHEET NOTES
SCALE: 1/4" = 1'-0"F2
MECHANICAL NEW PLAN -LEVEL 1
EXPIRES 06/30/27
Da t e S i gned
KOSOR
44759
KEVIN M.R
e g i s t e r e d
Pr o f es s i o na l Eng i nee r (M echan i c a l )
C E
R T
I F I C A T E N
O
AR IZONA , U . S .A .
01/29/26
Revisions: Date:
ADDENDUM #2 06/29/2026
N O
R
TH
| Sheets |
| MP101 - LEVEL 1 MECHANICAL PIPING PLAN |
File details come from the government source that posted it. Updated .