Prescott Replace Steam Boilers (Project No. 649-22-104) Federal contract opportunity
Solicitation number
36C26226B0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This is a mechanical engineering drawing for a basement piping plan related to steam boiler replacement at the Northern Arizona VA Health Care System facility located in Prescott, Arizona. The drawing, designated as Sheet MP100, was issued on 08 APR 2026 and is part of Project Number 649-22-104, Building 111, with Addendum #2 dated 06/29/2026.

The drawing specifies comprehensive mechanical work requirements for the replacement of existing steam boilers and associated piping infrastructure. Key contractual requirements include: phasing new work with demolition to minimize facility downtime, with new installations completed prior to final demolition; scheduling facility shutdowns and switchover with 21-day advance approval; sealing all pipe penetrations through exterior walls, roofing, and mechanical room walls with fire-rated caulk; modifying existing boiler piping support systems; replacing all existing pipe hangers where pipe is being replaced; verifying all new steam and boiler feed water piping with X-ray inspection to ensure proper weld sealing; replacing existing sump pumps while retaining the existing waste pump; installing a new pressure relief valve (PRV) station in phases (1/3 valve first, followed by 2/3 valve after operational verification); and submitting plans for approval to reduce downtime. The drawing includes detailed piping configurations with various pipe diameters (2" to 8"), material designations (HPS, LPS, DCW, CT, SW), and shows connections to the drainage system. The document is sealed by Kevin M. Kosor, a registered Professional Engineer in Mechanical Engineering (Certificate No. 44759), with certification valid through 06/30/2027.

View the file

Other files for this federal contract opportunity

Other files attached to Prescott Replace Steam Boilers (Project No. 649-22-104), newest first.
File Type Posted
Award Notice 36C26226C0255.pdf PDF
Amendment 0004 - Solicitation 36C26226B0017.pdf PDF
Attachment 28 - HA101 - BASMENT AND FIRST FLOOR ASBESTOS ABATEMENT PLAN.pdf PDF
Attachment 26 - FX101 - FIRST FLOOR AND MEZZANINE FIRE PROTECTION PLAN.pdf PDF
Attachment 25 - Maricopa Association of Governments Uniform Standard Details.pdf PDF
Attachment 24 - Section 33 10 00 - Water Utilities_Revised.pdf PDF
Attachment 23 - EE501 - ELECTRICAL DETAILS.pdf PDF
Attachment 21 - ME502 - MECHANICAL DETAILS.pdf PDF
Attachment 14 - Section 01 32 16.13 - Network Analysis Schedules.pdf PDF
Attachment 13 - VAMC Archeological Sensitivity Map.pdf PDF
Attachment 22 - MP102 - MECHANICAL PIPING PLAN - UPPER LEVEL.pdf PDF
Attachment 18 - ENG Form 4288 - Submittal Register.pdf PDF
Attachment 17 - Utilities Drawing.pdf PDF
Attachment 16 - Section 23 22 13 - Steam and Condensate Heating Piping.pdf PDF
Amendment 0003 - Solicitation 36C26226B0017.pdf PDF
Attachment 27 - EL202 - MEZZANINE FLOOR PHOTOMETRIC PLAN.pdf PDF
Attachment 20 - MP101 - LEVEL 1 MECHANICAL PIPING PLAN.pdf PDF
Attachment 15 - Section 00 01 10 - Table of Contents_Revised.pdf PDF
Attachment 12 - Revised Design Narrative and Option Descriptions.pdf PDF
RFI Notice 01 - Solicitation No. 36C26226B0017.pdf PDF
Amendment 0002 - Solicitation 36C26226B0017.pdf PDF
Attachment 11 - Site Visit Sign-in Sheet.pdf PDF
Amendment 0001 - Solicitation 36C26226B0017.pdf PDF
Attachment 06 - Asbestos Survey Report.pdf PDF
Attachment 03 - Drawings.pdf PDF
Attachment 07 - Design Narrative and Option Descriptions.pdf PDF
Attachment 04 - Wage Rate Determination.pdf PDF
Attachment 01 - Statement of Work.pdf PDF
Solicitation 36C26226B0017.pdf PDF
Attachment 10 - Site Visit Map.pdf PDF
Attachment 08 - Structural Calculations.pdf PDF
Attachment 05 - Lead Based Paint Inspection Report.pdf PDF
Attachment 09 - VHA Boiler Associated Plant Safety Device Testing Manual.pdf PDF
Attachment 02 - Specifications.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

C

67 5

D

8"ø HPS

8"ø HPS 3"ø LPS

2"ø LPS 6"ø HPS 2"ø DCW

3"ø CT

2"ø LPS

3"ø DCW 3"ø SW

TYP

(E)8"ø HPS

(E)3"ø LPS

(E)6"ø HPS

(E)2"ø LPS

TO DRAINAGE SYSTEM

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT / ENGINEERS SEAL:CONSULTANTS:

321 4 5 6 7 8 9 10

B

IM

/2

R e p la c e S te a m

B o ile rs

/2

-M e c h C e n tr a l.

rv t

/3

/2

:1

:0

P

M

MP100

BASEMENT MECHANICAL PIPING

PLAN

REPLACE STEAM BOILERS

NORTHERN ARIZONA VA HEALTH CARE SYSTEM

500 N. STATE HWY 89

PRESCOTT, ARIZONA 86313

649-22-104

08 APR 2026 KMK CDN

SCALE: 1/4" = 1'-0"F5

MECHANICAL NEW PLAN - BASEMENT

SHEET KEYNOTES

GENERAL SHEET NOTES

1 CONTRACTOR TO PHASE NEW WORK WITH DEMOLITION TO MINIMIZE DOWNTIME.

NEW WORK TO BE INSTALLED PRIOR TO FINAL DEMOLITION.

2 SCHEDULE SHUTDOWNS AND SWITCH OVER THE FACILITY. PROVIDE PLAN FOR

APPROVAL 21 DAYS IN ADVANCE.

3 ALL PIPE PENETRATIONS THROUGH EXTERIOR WALLS, ROOFING, STAIRWAY

WALLS AND MECHANICAL ROOM WALLS TO BE SEALED WITH FIRE RATED CAULK.

4 EXISTING BOILER PIPING SUPPORT TO BE MODIFIED TO SUPPORT NEW STEAM

PIPING.

5 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE

HANGERS WHERE PIPE IS BEING REPLACED.

6 ALL NEW STEAM AND BOILER FEED WATER PIPING SHALL BE VERIFIED WITH X-RAY

TO ENSURE THAT WELDING IS PROPERLY SEALED.

1 REPLACE EXISTING SUMP PUMPS. EXISTING WASTE PUMP TO REMAIN.

2 CONTRACTOR TO INSTALL NEW PRV STATION. INSTALL 1/3 VALVE FIRST. INSTALL

2/3 VALVE AFTER NEW 1/3 VALVE IS OPERATIONAL AND SUBMIT PLAN FOR

APPROVAL TO REDUCE DOWN TIME.

3 CONTRACTOR SHALL INCLUDE IN BID REPLACEMENT OF ALL EXISTING PIPE

HANGERS WHERE PIPE IS BEING REPLACED.

EXPIRES 06/30/27

Da t e S i gned

KOSOR

44759

KEVIN M.R

e g i s t e r e d

Pr o f es s i o na l Eng i nee r (M echan i c a l )

C E

R T

I F I C A T E N

O

AR IZONA , U . S .A .

01/29/26

Revisions: Date:

ADDENDUM #2 06/29/2026

N O

R

TH

Sheets
MP100 - BASEMENT MECHANICAL PIPING PLAN

File details come from the government source that posted it. Updated .