This document package includes drawings and specifications for mechanical HVAC system repairs and upgrades at the Raymond G. Murphy VA Medical Center in Albuquerque, New Mexico. The scope of work involves repairing the Sterile Processing Service sewer system and upgrading equipment areas in Building 41. Drawings show the existing basement layout, proposed demolition plans, new work plans including mechanical, piping, and control details. Specifications include schedules for ductwork, fans, air handling units, controls points, and sequence of operations. The solicitation number is 36C26224B0007 with an estimated value over $250,000. The contracting agency is the Department of Veterans Affairs.

View the file

Other files

File Type Posted
C01 Award Notice of 36C26224C0167.pdf PDF
S06 36C26224B0007 0006.pdf PDF
S06 ATTACHMENT 4 - REVISED WAGE DETERMINATION NM20240044 01-06-2024.pdf PDF
S06 36C26224B0007 0005.pdf PDF
AMENDMENT 0004 - ATTACHMENT A - GEOTECHNICAL REPORT.pdf PDF
AMENDMENT 0004 - ATTACHMENT C - ASBESTOS SURVEY REPORT.pdf PDF
AMENDMENT 0004 - ATTACHMENT B - SECTION 26 12 19.pdf PDF
AMENDMENT 0004 - ATTACHMENT 4 - REVISED WAGE DETERMINATION NM20240001.pdf PDF
S06 36C26224B0007 0004.pdf PDF
S06 36C26224B0007 0003.pdf PDF
S06 36C26224B0007 0002 01-30-2024.pdf PDF
S06 36C26224B0007 0001 01162024.pdf PDF
ATTACHMENT 4 - WAGE DETERMINATION NM20230044 06-09-2023.pdf PDF
ATTACHMENT 1D - Drawings-Architectural.pdf PDF
ATTACHMENT 1H - Drawings-Electrical.pdf PDF
ATTACHMENT 1A - Drawings-General.pdf PDF
ATTACHMENT 1E - Drawings-Fire Protection.pdf PDF
ATTACHMENT 1F - Drawings-Plumbing.pdf PDF
ATTACHMENT 1C- Drawings-Structural.pdf PDF
ATTACHMENT 1B - Drawings-Civil.pdf PDF
ATTACHMENT 2 - 501-21-101 Bid Spec Complete-Updated.pdf PDF
ATTACHMENT 3 - RFI FORM 501-21-101.docx DOCX document
ATTACHMENT 1I - Drawings-Telecommunications.pdf PDF
S02 36C26224B0007.docx DOCX document
S02. 36C26224B0007 Pre-Solicitation Notice.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

HVAC PIPING TYPES

GENERAL DUCT SYMBOLS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACU AIR CONDITIONING UNIT

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION

INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CARBON MONOXIDE

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

A

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FCW FORWARD CURVED WHEEL (FAN)

E

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

D

DB DECIBELS

Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

FSD COMBINATION FIRE / SMOKE DAMPER

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

J

J INTENTIONALLY LEFT BLANK

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

H

HU HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPC HIGH PRESSURE STEAM CONDENSATE RETURN

HPS HIGH PRESSURE STEAM (61-300 PSIG)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HC HOT WATER HEATING COIL

HHP HEATING HOT WATER PUMP

HHR HEATING HOT WATER RETURN

HHS HEATING HOT WATER SUPPLY

HHUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I

L

L LITER

L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPC LOW PRESSURE STEAM CONDENSATE RETURN

CLPC LOW PRESSURE STEAM CONDENSATE (CLEAN)

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPS LOW PRESSURE STEAM (0-15 PSIG)

CLPS LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

M

M METER, SI UNIT

M/s METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPC MEDIUM PRESSURE STEAM CONDENSATE

RETURN

MPS MEDIUM PRESSURE STEAM (16-60 PSIG)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

P

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER (SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

O

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

OSD ORGANIC SOIL FILTER

Q

Q INTENTIONALLY LEFT BLANK

T&PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

DSD DUCT SMOKE DETECTOR

SD SMOKE DAMPER

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

R

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

REA RELIEF AIR

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

T

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

U

X INTENTIONALLY LEFT BLANK

W

W WATTS

WAG WASTE ANESTHESIA GAS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WF WATER FILTER

WFM WATER FLOWMETER

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

X

V

GENERAL NOTES:

A. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ACCURATELY ILLUSTRATE THE

SCOPE OF WORK BUT ARE STILL DIAGRAMMATIC IN NATURE.

B. MECHANICAL DRAWINGS DO NOT SHOW ALL ACCESSORIES TO BE INSTALLED. THE

CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SYSTEMS ARE FULLY

FUNCTIONAL AND COMPLIANT WITH APPLICABLE CODES.

C. THE EXISTING CONDITIONS DEPICTED IN THESE PLANS ARE BASED ON AS-BUILT

DOCUMENTATION AND INFORMATION OBTAINED FROM FIELD SURVEYS AND ARE AS

ACCURATE AS POSSIBLE. DUE TO OBSTRUCTIONS, CEILINGS, ETC., NOT ALL CONDITIONS

COULD BE VERIFIED. THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BID AND

NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS, OBSTRUCTIONS, OR

INCONSISTENCIES PREVENTING INSTALLATION OF THE MECHANICAL SYSTEM.

D. ALL EXPOSED UNINSULATED PIPING SHALL BE PAINTED PER THE SPECIFICATION SECTION

"PAINTING".

E. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT

TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.

F. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,

STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT

DRAWINGS.

G. MAINTAIN A MINIMUM OF 6′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,

SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.

H. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING

INSULATION IS APPLIED.

I. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE

LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS

RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.

J. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED

DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED

FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.

CWR

CWS

CD

LPC

LPS

MPC

MPS

HPC

HPS

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

HIGH PRESSURE STEAM CONDENSATE

HIGH PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM CONDENSATE

MEDIUM PRESSURE STEAM SUPPLY

LOW PRESSURE STEAM CONDENSATE

LOW PRESSURE STEAM SUPPLY

VACUUM RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

VR

CONTINUOUS BLOWDOWN

CHEMICAL FEED

BOILER BLOWOFF BO

CF

CBD

FWPD

FWPS

A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

B. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF

STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.

C. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER

APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

D. ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT

OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.

E. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN

BYPASSES, AND IN LONG PIPING RUNS (100' OR MORE) TO PERMIT DISASSEMBLY FOR

ALTERATION AND REPAIRS.

F. PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1/4" IN 10' (1" IN 40') MINIMUM.

PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW

1/2" PER 10' (1" IN 20') MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8', PITCH

BRANCH LINES TOWARD MAINS 1/2" PER FOOT MINIMUM.

G. PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1/2" PER

FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8' IN LENGTH SHALL BE

ONE SIZE LARGER THAN NOTED.

H. TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45° PREFERRED, 90° ACCEPTABLE).

I. PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE

DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT,

RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE

REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND EXPANSION JOINTS.

J. ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP

LEGS AT INTERVALS NOT EXCEEDING 200' WHERE PIPE IS PITCHED DOWNWARD IN THE

DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100' WHERE THE PIPE IS PITCHED UP SO

THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.

K. STEAM TRAPS SHALL BE MINIMUM 3/4″ IN SIZE.

L. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN

PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE

OWNER.

A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO

INSTALL COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS

SPECIFIED AND AS REQUIRED BY CODE.

B. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME

DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY

FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE

EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.

C. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR

DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING

THICKNESS.

D. PROVIDE ALL 90° SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS

OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST

SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1.5 TIMES

THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH

TURNING VANES.

E. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL

REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT

MODIFICATIONS TO SUIT.

F. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND

EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE

POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.

G. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5' MAXIMUM LENGTH.

H. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN

DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE

PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

I. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND

MAINTENANCE OF ALL FANS, VALVES, AND MECHANICAL EQUIPMENT.

J. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER

REQUIREMENTS.

PIPING GENERAL NOTES: HVAC/SHEET METAL GENERAL NOTES:

EXISTING TO BE DEMOLISHED

LIMIT OF DEMOLITION

CONNECT NEW TO EXISTINGEXISTING TO REMAIN

NEW DUCT (INSIDE DIMENSIONS: W" X D")

RS

RL

REFRIGERANT SUCTION

REFRIGERANT LIQUID

SUPPLY AIR DUCT UP

SUPPLY AIR DUCT DOWN

H

T

H

T

26-P-3

MH-100

PUMP NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (PUMP)

DETAIL NUMBER

SHEET NUMBER

SHEET NUMBER

SECTION NUMBER

THERMOSTAT

HUMIDISTAT

TEMPERATURE SENSOR

HUMIDITY SENSOR

BUILDING NUMBER WHERE EQUIPMENT IS LOCATED

26-TU-1-1

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT)

BUILDING NUMBER WHERE EQUIPMENT IS LOCATED

SERVED BY AIR HANDLER UNIT NO. 1

TERMINAL UNIT TAG

MECHANICAL EQUIPMENT TAG

1 OWNER FURNISHED, CONTRACTOR

INSTALLED EQUIPMENT DESIGNATION

EXISTING TO BE DEMOLISHED

EXISTING TO REMAIN

NEW PIPE

CONNECT NEW TO EXISTING

LIMIT OF DEMOLITION

GENERAL PIPING SYMBOLS

GENERAL ANNOTATIONS

AV

STRAINERFLOAT & THERMOSTATIC

STEAM TRAP

INVERTED BUCKET

STEAM TRAP

FLANGE CONNECTION PIPE DROP

PIPE RISER TEE DOWN

TEE UP

UNION

PRESSURE REDUCING

VALVE

BALL VALVE

ANGLE GLOBE VALVE

SAFETY RELIEF VALVE

GLOBE VALVE

MANUAL OR

AUTOMATIC AIR VENT

EXPANSION JOINT

EJ

PRESSURE AND

TEMPERATURE TEST PLUG

QUICK-COUPLE HOSE

CONNECTOR

FLOW METER

HVAC PIPING SYMBOLS

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CHR

CHS

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

HHR

HHS QV CRYOGEN VENT

DR DRIP RETURN

CAP

REDUCER (ECCENTRIC)

TYPE

AIRFLOW (CFM)

SD-1

TYPE

AIRFLOW (CFM)

RG-1

TYPE

AIRFLOW (CFM)

EG-1

SQUARE TO ROUND TRANSITION

ELBOW WITH TURNING

VANES

ROUND ELBOW

EXHAUST, RELIEF, MAKE UP, OR

OUTSIDE AIR DUCT DOWN

EXHAUST, RELIEF, MAKE UP, OR

OUTSIDE AIR DUCT UP

RETURN DUCT DOWN

RETURN DUCT UP

BRANCH DUCT WITH HIGH EFFICIENCY

TAKE-OFF (HETO) BRANCH FITTING &

MANUAL VOLUME DAMPER

BRANCH DUCT WITH CONICAL

FITTING & MANUAL VOLUME

DAMPER

DAMPERS: (BD, FD, FSD, MD, SD, VD)

BD

XX-XX

ANCHOR

TEEDIRECTION OF FLOW

S

K. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE

SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE

ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND

RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE

APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.

L. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS WHERE REQUIRED

TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED

MECHANICAL EQUIPMENT.

M. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE

COORDINATED WITH ALL OTHER TRADES INVOLVED.

N. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE

STOPPED WITH AN APPROVED FIRE STOPPING MATERIAL.

O. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.

DIRECTION OF PIPE

PITCH (DOWN)

FM

MV

HVAC VALVE SYMBOLS

PC PUMPED CONDENSATE

SPACE TAG

FLEXIBLE CONNECTOR

PUMP

REDUCER (CONCENTRIC)

GATE VALVE

BUTTERFLY VALVE

CHECK VALVE

THERMOMETER

PRESSURE GAUGE

STRAINER WITH BLOWOFF

AND HOSE CONNECTION

YR YEAR

Y

Z INTENTIONALLY LEFT BLANK

Z

M

CONTROL VALVE

CONTROL VALVE, THREE WAY

MOTOR CONTROLLED

VALVE

M

M

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

A. MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE TO REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND REMOVED AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL ROOMS AS REQUIRED. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO THE ENGINEER OF RECORD IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE

DEMOLITION WORK SHALL NOT JUSTIFY AN ADDITIONAL COST.

B. DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK REQUIRED TO KEEP

NON-SCOPE AREAS IN OPERATION. COORDINATE UTILITY SHUT-OFFS AND TEMPORARY POWER,

STORAGE, AND ACCESS NEEDED TO COMPLETE WORK WITH GENERAL CONTRACTOR AND COR.

C. REMOVAL OF EXISTING FIXTURES AND EQUIPMENT WILL REQUIRE ISOLATION OF EXISTING PIPING BRANCHES AND/OR MAINS USING SHUTOFF VALVES. INSTALL NEW ISOLATION VALVES AS REQUIRED TO

COMPLETION DEMOLITION WORK.

D. REMOVAL OF EXISTING PLUMBING FIXTURES AND EQUIPMENT WILL REQUIRE CAPPING AND SEALING EXISTING MAINS OR BRANCHES, WITHOUT LEAVING DEAD LEGS, TO KEEP REMAINING SYSTEMS IN OPERATION. THE CONTRACTOR SHALL PROVIDE PROTECTIVE MEASURES TO PROTECT THE EXISTING

OCCUPIED AREAS AND EQUIPMENT DURING THE CONSTRUCTION WORK. THE CONTRACTOR SHALL

CLEAN THE AREAS OF ALL CONSTRUCTION DIRT DAILY, AND UPON COMPLETION OF THE WORK.

E. COORDINATE REMOVAL, REPLACEMENT, AND/OR REPAIRS OF ANY EXISTING WALLS, CEILING, ETC.

REQUIRED FOR MECHANICAL DEMOLITION WORK WITH GENERAL CONTRACTOR.

F. PROVIDE TIGHTLY SEALED AND INSULATED TERMINATIONS FOR ALL PIPING, DUCTWORK, AND EQUIPMENT REMOVED FROM THE PROJECT. THERE SHALL BE NO "DEAD LEG" SECTIONS OF PIPING

WHERE WATER CAN SIT AND BECOME STAGNANT.

G. REFER TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR INSTRUCTIONS REGARDING THE

REMOVAL AND RETURN OR DEMOLITION OF EXISTING EQUIPMENT AND FIXTURES.

H. PORTIONS OF EXISTING SYSTEMS ARE SHOWN FOR CLARITY AND MAY NOT BE NECESSARY TO MODIFY OR REVISE THEM. ALL EXISTING SYSTEMS ARE SHOWN BASED ON AVAILABLE AS-BUILT DRAWINGS AND SITE SURVEYS OF ACCESSIBLE AREAS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS.

I. ALL WORK MUST BE COORDINATED AND SCHEDULED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE TO ENSURE THE LEAST AMOUNT OF DISRUPTION OF BUILDING ACTIVITIES AS

POSSIBLE.

J. ALL ACCESSIBLE ABANDONED PIPING AND DUCTWORK SHALL BE REMOVED AND PROPERLY DISPOSED

OF.

K. SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE TO

EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.

GENERAL DEMOLITION NOTES:

B-100

SPACE NAME

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :0

A

M

LEGEND AND ABBREVIATIONS

RAC 57JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

M-000

SPUR #: 1993.10

No. REVISION DESCRIPTION DATE

S A

N

P

ED

R O

DR

I V E

DR

IV

E

R

I DG

EC RE

ST

5 350

5 350

3 5

5 340

5348.7

5348.5

5347.2

5337.2

5345.6

5348.6

5347.8

5346.9

5328.7

5347.0

5347.2

5347.4

5346.8

5348.6

5348.4

5348.4

5348.3

5348.1

5348.2

5348.2

5348.2

5347.3

5346.8

5349.0

5348.75348.2

5347.2

5347.2

5346.6

5345.2

5346.5

5346.6 5347.0

5345.2

5340.7

5337.1

5340.4

5342.7

5338.4 5335.6

5339.4

5339.1

5340.1

5336.3

5342.9

5345.6

5340.8

5327.1

5322.8

5324.4

5328.4

5323.2

5322.7

5320.8

5320.5

5340.5

5339.6 5340.7 5342.8

5348.8 5350.1

5348.2

5349.4

5349.8

5351.2

5350.2

5340.8

5348.5

5348.3

5344.5

5346.6

5346.7

5344.6

5340.3

5342.4

5342.7

5347.2

5346.4

5348.6

5346.5

5345.4

5345.2

5344.4 5346.5

5344.2

5342.8

5345.2

5340.2

5340.9

5338.6

5337.8

5342.85340.9

5340.9 5342.7

5344.4

5344.4

5344.8

5345.2

5345.2

5346.7

5346.7

5348.4

5346.5

5346.5 5346.6 5347.1

5348.8

5348.3

5348.2

5347.7

5349.0

5350.6

5349.0

5326.8

5326.5

5355.0

5350.8

5348.7

5344.8

5346.4

5348.4

5332.4

5342.8

5344.7

5349.6

5340.6

5340.1

5348.5

5336.5

5339.0

5352.4

5330.4

5326.3

5328.2

5350.9

5348.4

5346.6

5341.15344.9

5345.3

5347.3

5343.5

5346.2

5346.7

5344.9

5349.1

5338.8

5340.6

5341.2

5338.6

5336.6

5337.1

5334.6

5334.6

5328.7

5328.2

5327.0

5326.7

5325.2

5324.5

W

ALL

C O U

RT

C OU RT

C OU RT

W A

LL

WALK

EN CLOSED

WALK

EN CLOSED

W

ALL

E N

CL

OS ED

W

ALK

W

ALL

W

ALL

W A

LL

W A

LL

W A

LL

W

ALL

W

ALL

W A

LL

W

AL LS

W A

LL

W A

LL

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

TEMPORARY SPS FACILITY

SE LOT NEAR BUILDING 45

RAYMOND G. MURPHY VA MEDICAL CENTER CAMPUS

N

B45

B41

STERIS TRAILER

#1

STERIS TRAILER

#2

MECHANICAL EQUIP.

TEMP-AH-1

TEMP-AH-210

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :0

A

M

MECHANICAL SITE PLAN

RAC 58 79JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

MS100

SPUR #: 1993.10

N

1/4" = 1'-0"

SITE PLAN - MECHANICAL1

KEYNOTES

10 ROUTE CONDENSATE TO NEAREST PLUMBING DRAIN.

12"x12" RA

12"ø SP. EA

14"ø SA-H

16"ø SA-C

12"ø SA-H

12"ø SP. EA

16"ø SA-C

12"x8" RA

9"ø SA-H

12"ø SA-C

12"ø SP. EA

12"x8" RA

11"ø SA-C

"x

8" R

A

8" ø

S A

-C 8" ø S

A -H

7" ø

S A

-C 7" ø S

A -H

6" ø

S A

-C

"x

6" S

A

"x

6" S

A

6" x8

S

A

8" x6

R

A

8" ø

S A

-C 8" ø S

A -H

9" ø

S A

-C 9" ø S

A -H

9" ø

S A

-C

9" ø

S A

-H

"ø

S A

-C

"ø S

A -H

7" ø

S A

-C 7" ø S

A -H

"x

S A

"x

6" S

A

"x

8" S

A

"x 8"

S A

12"x6" SA

12"x8" SA

10"x6" 10"x6" SA

14"x6" SA 14"x6" SA

20"ø SA-C

18"ø SA-H

18"x12" RA 16"x12" RA

14"ø SA-H

16"ø SA-C18"ø SA-C

16"ø SA-H

14"x14" EA

12"ø SP. EA

16"ø SP. EA

14"x11" EA

12"ø SA-H

14"ø SA-C

8"x9" EA

11"ø SA-H

12"ø SA-C 10"ø SA-C

10"ø SA-H

8"x9" EA

8"x4" SA

8"x4" SA

"x

5" S

A

"x

6" S

A

6" x6

E

A

"x

6" R

A12 "x

8" S

A

"x 8"

S A

"x

7" S

A

"x

E A

8" x8

E

A

"x

6" S

A

"x

6" R

A

"x

9" S

A

"x 8"

S A

"x

4" S

A

"x

7" E

A

"x

7" E

A

9" ø

S A

-C 9" ø S

A -H

"x

9" E

A18 "x

S A

"x

7" S

A

"x

7" S

A

"x

S

A

"ø S

A -C

"ø

S A

-H

"x

E

A

"x

S A

"ø

S P

. E A

"x

8" R

A

"x

8" S

A

"ø

S P

. E A

"x

E A

"ø

S P

. E A

"ø

S P

. E A

"x

E A

"x

R A

"ø

S A

-H

"ø

S A

-C

"ø S

A -C

"ø

S A

-H

"x

R A

"x

E A

"ø

S P

. E A

"ø

S P

. E A

"x

E A

"ø

S P

. E A

8" x4

E

A

6" x6

R

A

14"x7" SA 18"x7"

18"x7"14"x7" SA

6"x6" EA

10"x4" SA

6"x6" EA

8"x4" SA

10"x4" SA

8"x4" SA

14"x6" SA

16"ø SP. EA

6"ø SP. EA

12"x6" SA

"x

8" E

A

8" x4

E

A

9" ø

S A

-C 9" ø S

A -H

9"ø SA-C

14"x7" SA

22"x18" EA24"x20" EA

16"ø SP. EA

12"ø SP. EA

14"x14" EA

20"x16" EA

12"ø SP. EA

9"ø SA-H

11"ø SA-C

9"ø SA-H

16"ø SP. EA 13"ø SP. EA 13"ø SP. EA

1 2 3 4 5 6 7

G

H

I

11" Ø SP.

EA DN

RELOCATE SA

DIFFUSER

DEMOLISH

TO ROOM

BOUNDARY

AND CAP

D7

D7

D7

D7 D7

D7

D7 D7

D7

D7D7

D7 D7

D7

D7

D7

D9

M-501

SPS DEPARTMENT

BUILDING 41

BASEMENT LEVEL, QUAD C

N

BUILDING 41 - BASEMENT LEVEL KEY PLAN

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :0

A

M

MECHANICAL DEMOLITION PLAN -

BASEMENT INTERSTITIAL

RAC 59JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

MD101

SPUR #: 1993.10

N

1/8" = 1'-0"

B41 BASEMENT INTERSTITIAL - HVAC DEMOLITON PLAN1

DEMOLITION KEYNOTES

D7 EXISTING AIR DEVICES IN THIS AREA TO BE REPLACED ALONG WITH CEILING REPLACEMENT. PREPARE DUCTWORK FOR CONNECTION TO NEW AIR

DEVICE. CONTRACTOR TO VERIFY LOCATION.

D9 TEMPORARY FAN SHALL BE INSTALLED ALONG WITH DEMOLITION OF EXISTING EXHAUST TO ENSURE SPACE HAS PROPER VENTILATION.

DN

MECH

BD-141

VESTIBULE

BC-125

STAIR

N0-3 VESTIBULE

BC-113

IRM SIGNAL CLOSET

BC-110D

CLOSET

BC-110C

SOILED RECV &

DECONTAMINATION

BC-110

STOR

BC-127

ELECTRICAL CLOSET

BC-110E

STERILIZATION PREPARATION

BC-111

MECH EQUIP

BC-112

RECEPTION AND PGM ASST

BC-125

OFFICE OF CHIEF BIOMED

BC-125A

EQUIP TEST & STORAGE

BC-115D

WORK AREA & STOR

BC-115C

BIOMED WORK SPACE

BC-125D

OFFICE

BC-115E

BREAKDOWN

BC-115B

HALL

BC-103A

BREAK ROOM

BC-103B

TLT (F)

BC-115G

TLT

BC-104

TLT

BC-105

STOR

BC-118

STAFF WORK AREA

BC-115

RECEPTION

BC-121A

MED SUPPLY TECH

BC-121B

OFFICE

BC-123

HAC

BC-115A

TECHNICAL WORK SPACE

BC-126

PARTS RM

BC-126A

MECH RM

BC-126B

CORRIDOR

CB-17

STOR

BC-119

MECH

BC-115F

LOCKERS

BC-102

MED GAS

BC-121

CORRIDOR

CB-15

CART WASH

BC-114

CORRIDOR

CB-16

SPS CHANGE AREA

BC-103

1 2 3 4 5 6 7

G

H

I

VESTIBULE

BC-100

HAC

BC-110D

HLD DECON

BC-110B

EG-1

HLD ALCOVE

BC-110C

HLD ANTEROOM

BC-110A

2'x2'

ACCESS

PANEL

EG-3

EG-3

EG-4

2'x2' ACCESS

PANEL

3'x3' ACCESS

PANEL

3'x3'

ACCESS

PANEL

3'x3' ACCESS

PANEL

3'x3' ACCESS

PANEL

3'x3' ACCESS

PANEL

3'x3' ACCESS

PANELS

SD-6

SD-6

SD-6 SD-6

SD-6

SD-6

SD-5SD-5

SD-5 SD-5

SD-5 SD-5

SD-4SD-4

SD-4

SD-5

RG-1

RG-1

RG-1

M-501

SPS DEPARTMENT

BUILDING 41

BASEMENT LEVEL, QUAD C

N

BUILDING 41 - BASEMENT LEVEL KEY PLAN

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :0

A

M

MECHANICAL NEW WORK PLAN -

BASEMENT

RAC 60JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

MH100

SPUR #: 1993.10

N

1/8" = 1'-0"

B41 BASEMENT - HVAC NEW1

KEYNOTES

2 SPECIALTY EXHAUST UP FROM CART WASHER.

3 INSTALL NEW EXHAUST GRILL FOR HAC CLOSET AT THE APPROXIMATE LOCATION SHOWN. CONNECT TO EXISTING GENERAL EXHAUST SYSTEM.

4 INSTALL NEW TRANSFER AIR REGISTERS AND DUCT FOR VESTIBULE AT THE APPROXIMATE LOCATION SHOWN.

8 RELOCATE EXISTING AIR DEVICE AND DUCTWORK AS REQUIRED FOR FLOORPLAN MODIFICATIONS. CONNECT AT APPROXIMATE LOCATION SHOWN.

9 INSTALL NEW AIR DEVICES IN THIS AREA ALONGSIDE CEILING REPLACEMENT. NEW AIR DEVICES SHALL BE THE SAME AS EXISTING TYPES. REBALANCE AS NECESSARY, REFER TO ARCHITECTURAL DRAWINGS FOR SCOPE OF CEILING REPLACEMENT. CONTRACTOR TO VERIFY LOCATION OF EXISTING

EQUIPMENT AND NEW AIR DEVICES.

15 CONTRACTOR TO INSTALL NEW ACCESS PANEL IN THE LOCATION SHOWN. PRIOR TO INSTALLATION, CONFIRM LOCATION OF EXISTING EQUIPMENT TO

ENSURE PROPER CLEARANCE.

1 2 3 4 5 6 7

G

H

I

12x8" TRANSFER

DUCT AND GRILLES

6"x6" EA

EG-1

14"ø SP. EA

EG-3

EG-4

M-501

SPS DEPARTMENT

BUILDING 41

BASEMENT LEVEL, QUAD C

N

BUILDING 41 - BASEMENT LEVEL KEY PLAN

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :1

A

M

MECHANICAL NEW WORK PLAN -

BASEMENT INTERSTITIAL

RAC 61JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

MH101

SPUR #: 1993.10

N

1/8" = 1'-0"

B41 BASEMENT INTERSTITIAL - HVAC NEW1

KEYNOTES

1 CONNECT NEW EXHAUST FROM CART WASHER TO EXISTING SPECIALTY EXHAUST AT THE APPROXIMATE LOCATION SHOWN.

2 SPECIALTY EXHAUST UP FROM CART WASHER.

3 INSTALL NEW EXHAUST GRILL FOR HAC CLOSET AT THE APPROXIMATE LOCATION SHOWN. CONNECT TO EXISTING GENERAL EXHAUST SYSTEM.

4 INSTALL NEW TRANSFER AIR REGISTERS AND DUCT FOR VESTIBULE AT THE APPROXIMATE LOCATION SHOWN.

7 CAP EXISTING DUCTWORK AT THE APPROXIMATE LOCATION SHOWN. CONTRACTOR TO VERIFY LOCATION OF EXISTING DUCTWORK AND

EQUIPMENT.

I

41-EF15

41-ERC3

"x

E A

24"x20" EA

"x

E A

"ø

S P

. E A

"ø

S P

. E A

"ø

S P

. E A

"x

E A

"x

R A

"ø

S A

-H

"ø

S A

-C

12"x12" RA

12"ø SP. EA

14"ø SA-H

16"ø SA-C

"ø

S P

. E A

"ø

S P

. E A

D3

41-EF13

41-EF16

41-EF12

D5

MECH ROOM

BC-112

D4

I

41-EF15A

"x

E A

"x

E A

"ø

S P

. E A

"ø

S P

. E A

"x

E A

"x

R A

"ø

S A

-H

"ø

S A

-C

"ø

S P

. E A

24"x20" EA

41-EF12

41-EF16 41-EF13

41-ERC3

12"x12" RA

12"ø SP. EA

14"ø SA-H

16"ø SA-C

"ø

S P

. E A

"ø

S P

. E A

D5

24"x20" EA

MECH ROOM

BC-112

EXISTING DDC

PANEL

2 3 4

2" HPC 2" HPS

1 1/2" HPC

1 1/2" HPS

1" HPS

1" HPC

1 1/2" HPC

1 1/2" HPS

EXISTING STEAM PIPE

ROUTED IN TRENCH

BELOWSOILED RECV &

DECONTAMINATION

BC-110

STERILIZATION PREPARATION

BC-111

MECH

BC-115F

STOR

BC-119

CORRIDOR

CB-16

SPS CHANGE AREA

BC-103

1 1/2" HPC

1 1/2" HPS

SPS DEPARTMENT

BUILDING 41

BASEMENT LEVEL, QUAD C

N

BUILDING 41 - BASEMENT LEVEL KEY PLAN

2 3 4

1 1/4" LPS

2" HPC 2" HPS

1 1/2" HPC

1 1/2" HPS

1" HPS

1" HPC

1 1/2" HPC

1 1/2" HPS

EXISTING STEAM PIPE

ROUTED IN TRENCH

BELOW

SOILED RECV &

DECONTAMINATION

BC-110

STERILIZATION PREPARATION

BC-111

MECH

BC-115F

STOR

BC-119

CORRIDOR

CB-16

SPS CHANGE AREA

BC-103

1 1/2" HPC

1 1/2" HPS

D8

1 1/2" HPC

1 1/2" HPS

CART WASH

BC-114

1 1/4" LPS

1 1/2" HPC

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :1

A

M

ENLARGED HVAC PLANS

RAC 62JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

M-501

SPUR #: 1993.10

N

1/4" = 1'-0"

B41 BASEMENT MECHANICAL ROOM BC-112 - ENLARGED DEMOLITION PLAN1

N

1/4" = 1'-0"

B41 BASEMENT MECHANICAL ROOM BC-112 - ENLARGED HVAC PLAN2

N

1/4" = 1'-0"

B41 BASEMENT - PIPING ENLARGED PLAN4

N

1/4" = 1'-0"

B41 BASEMENT - PIPING ENLARGED DEMO PLAN3

KEYNOTES

5 INSTALL NEW EXHAUST FAN 41-EF15A.

11 EXISTING STEAM AND CONDENSATE PIPE FROM TRENCH BELOW.

12 ROUTE 1-1/2" LOW PRESSURE STEAM AND LOW-PRESSURE CONDENSATE TO CART WASH. CONTRACTOR TO

INSTALL PER MANUFACTURERS DETAILS.

13 CONTRACTOR TO DISCONNECT EXISTING EQUIPMENT TO ALLOW FOR DRAIN LINING. ANY SHUT DOWN NEEDS TO BE COORDINATED WITH THE COR OF THE VA BEFORE DISCONNECTING. ANY EQUIPMENT MOVED FOR DRAIN LINING WILL REQUIRE RECONNECTION ONCE THE LINING PROCESS IS COMPLETE. CONTRACTOR TO VERIFY ALL

PIPING CONNECTIONS ARE GOOD BEFORE START UP.

14 CONNECT NEW CONTROL DEVICES TO THE EXISTING DDC PANEL IN THIS APPROXIMATE LOCATION. CORRIDNATE

EXACT LOCATION WITH VA STAFF.

DEMOLITION KEYNOTES

D3 DEMOLISH EXISTING EXHAUST FAN (41-EF15). EXISTING ENERGY RECOVERY COIL ASSEMBLY IS TO REMAIN.

D4 EXISTING ENERGY RECOVERY ASSEMBLY AND ALL ASSOCIATED CONTROLS ARE TO REMAIN.

D5 EXTING CARTWASH FAN (41-EF13) IS EXISTING TO REMAIN. REBALANCE AIRFLOW TO 1,000 CFM TO MATCH NEW CARTWASH EXHAUST REQUIREMENTS. VERIFY REQUIRED EXHAUST AIRFLOW WITH ACTUAL PURCHASED

CARTWASH.

D8 DEMOLISH EXISTING PIPE FROM OLD CART WASH TO THIS LOCATION.

RETURN / EXHAUST AIR - TYPICAL

RETURN / EXHAUST

AIR MAIN DUCT

RETURN / EXHAUST GRILLE

RA/EA

RIGID DUCT

RIGID DUCT TRANSITION

BEVELED TAKE-OFF WITH

LOCKABLE VOLUME DAMPER

RETURN / EXHAUST AIR - SHALLOW PLENUM SPACE

RETURN / EXHAUST

GRILLE

RA/EA

RECTUAGULAR

RETURN PLENUM

(SAME SIZE AS GRILLE

CONNECTION SIZE)

RIGID DUCT

RETURN / EXHAUST

AIR MAIN DUCT

BEVELED TAKE-OFF

WITH LOCKABLE

VOLUME DAMPER

RECTANGULAR OR ROUND

ELBOW WITHOUT TURNING

VANES. REFER TO PLANS AND

SCHEDULE FOR DUCT SIZES

SUSPEND FROM

STRUCTURE ABOVE

PER SMACNA

GUIDELINES

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED CONNECTION

ON FAN/MOTOR SIDE

WASHER

1-1/2" MIN. TO 3" MAX. INSTALLED.

6" NOMINAL WITH MATERIAL TAUT

FLEXIBLE MATERIAL

AS SPECIFIED

1"x1/8" DRAW

BAND (TYP)

1"x1/8" BAND IRON

BOLTS ON 4" CENTERS

5/16" FLANGE

DUCT

SHEET METAL

SCREWS ON 12"

CENTERS

RIVETS ON 4"

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK

1"x1/8" BAND IRON

BOLTS ON 4" CENTERS

1" FLANGE & HEM

ALTERNATE

POSITION OF BOLT

1-1/2" POCKET

SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1-1/2" MIN. TO 3" MAX. INSTALLED.

6" NOMINAL WITH MATERIAL TAUTFLANGED CONNECTION

ON FAN/MOTOR SIDE

WASHER

FLEXIBLE MATERIAL

AS SPECIFIED

1 1/2"1/2"1/2"

CONICAL TAP WITH

LOCKABLE VOLUME

DAMPER (NOTE 3)

1-1/2" WIDE DUCT

STRAP

SUPPORT FROM

STRUCTURE INSULATED

SHEETMETAL

SUPPLY DUCT

CEILING

NOTES:

1. SEAL CONNECTIONS WITH SEALANT AND TAPE.

2. FLEXIBLE DUCT ALLOWED ONLY IN VERTICAL DROP TO AIR DEVICE. MAXIMUM RUN-OUT LENGTH IS 5'-0".

IF INSTALLED IN AN INTERSTITIAL SPACE, 8'-0" LENGTH ALLOWED.

3. PROVIDE VOLUME DAMPER IN NECK OF DIFFUSER IF INSTALLED IN AN INACCESSIBLE CEILING.

AIR DEVICE MOUNTING

FRAME. COORDINATE

WITH CEILING TYPE

SUPPLY DIFFUSER

(NOTE 3)

1.5 X DUCT DIAMETER

SHEETMETAL ELBOW

W/EXTERIOR INSULATION

PRE-INSULATED

FLEXIBLE DUCT

(NOTE 2)

DUCT COLLAR AT

DIFFUSER NECK.

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :1

A

M

MECHANICAL DETAILS & SCHEDULES

RAC 63JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

M-601

SPUR #: 1993.10

SMACNA HVAC Duct Construction Standards w/ith VA overrides. Refer to Specification section 233100 HVAC Ducts and Casings for gage and joint requirements

DUCT CONSTRUCTION SCHEDULE

DUCTS CONNECTED TO DUCT MATERIAL PRESSURE

CLASS

SEAL

CLASS

LEAKAGE

CLASS (RECT)

LEAKAGE

CLASS (RND)

SUPPLY

FAN COIL UNITS, FURNACES, HEAT PUMPS, AND TERMINAL UNITS GALVANIZED SHEETMETAL 2 A 16 8

OPERATING ROOMS (DOWNSTREAM OF HEPA FILTERS) 304 STAINLESS STEEL 2 A 16 8

CONSTANT VOLUME AIR HANDLING UNITS GALVANIZED SHEETMETAL 2 A 8 4

VARIABLE AIR VOLUME AIR HANDLING UNITS - MED PRESSURE GALVANIZED SHEETMETAL 3 A 8 4

VARIABLE AIR VOLUME AIR HANDLING UNITS - HIGH PRESSURE GALVANIZED SHEETMETAL 4 A 4 2

EQUIPMENT NOT LISTED GALVANIZED SHEETMETAL 2 A 8 4

OUTSIDE AIR

EQUIPMENT NOT LISTED GALVANIZED SHEETMETAL 2 A 16 8

RETURN

FAN COIL UNITS, FURNACES, HEAT PUMPS, AND TERMINAL UNITS GALVANIZED SHEETMETAL 2 A 16 8

CONSTANT VOLUME AIR HANDLING UNITS GALVANIZED SHEETMETAL 2 A 16 8

VARIABLE AIR VOLUME AIR HANDLING UNITS GALVANIZED SHEETMETAL 2 A 8 4

EQUIPMENT NOT LISTED GALVANIZED SHEETMETAL 2 A 16 8

EXHAUST

GENERAL CLEAN EXHAUST (ASHRAE 62.1 CLASS 1 OR 2) GALVANIZED SHEETMETAL 2 A 16 8

AIR HANDLING UNITS GALVANIZED SHEETMETAL 2 A 8 4

KITCHEN HOODS 304 STAINLESS STEEL 2 A 4 2

DISHWASHER OR HIGH HUMIDITY LOCATIONS 304 STAINLESS STEEL 2 A 4 2

FUME HOOD, LABORATORY AND PROCESS AIR (ASHRAE 62.1 CLASS 3 OR 4) 304 STAINLESS STEEL 3 A 4 2

EQUIPMENT NOT LISTED GALVANIZED SHEETMETAL 2 A 16 8

FAN SCHEDULE (EF/RF/SF)

MARK

BASIS OF DESIGN

(MODEL/MANUFACTURER) LOCATION

FAN DATA MOTOR DATA

MOUNTING

CONFIGURATION

(ARR. / DISCH.)

ELECTRICAL

WEIGHT

(LBS) NOTES

MAX

(CFM)

DESIGN

(CFM)

ESP

("WC) HP DRIVE TYPE

FLA

(A) VOLTS/PH

41-EF15A USF-22-A1 / GREENHECK BC-112 MECH ROOM 6,500 4,950 3.5 5 DIRECT ECM DIRECT 4 / CW UB 7.6 460/3 400 ALL LISTED

TEMP UNIT SCHEDULE (TEMP-AH)

MARK BASIS OF DESIGN

COOLING COIL DATA HEATING COIL DATA OUTDOOR FAN DATA INDOOR BLOWER DATA COMPRESSOR DATA PHYSICAL DATA

NOTESTOTAL (BTUH) SENSIBLE (BTUH) CAPACITY (BTUH) HP RPM AMPS FLOW (CFM) HP AMPS V/PH RATED LOAD AMPS DIMENSIONS (") WEIGHT (lb)

TEMP-AH-1 BARD / WH-30HB-C 25,400 22,700 16,426 1/5 1075 1.2 950 1/2 1.1 460/3 3.4 17.125 x 33.3 x 74.563 159 1,2,3

TEMP-AH-2 BARD / WH-30HB-C 25,400 22,700 16,426 1/5 1075 1.2 950 1/2 1.1 460/3 3.4 17.125 x 33.3 x 74.563 159 1,2

1. UNITS TO WORK IN CONJUNCTION WITH ONE ANOTHER.

2. PROVIDE UNIT WITH FACTORY MOUNTED DISCONNECT SWITCH.

3. PROVIDE UNIT WITH ELECTRIC HEATER COIL (5KW /17,000 BTU/H) ACCESSORY

1. PROVIDE INLET AND OUTLET FLANGES, FLEXIBLE CONNECTOR, NEOPRENE VIBRATION ISOLATORS, AND DISCONNECT SWITCH.

2. MECHANICAL CONTRACTOR IS TO COORDINATE THE EQUIPMENT PAD SIZE AND CONSTRUCTION WITH THE GENERAL CONTRACTOR.

3. FAN MUST BE SEISMICALLY CERTIFIED.

4. MECHANICAL AND CONTROLS CONTRACTOR SHALL REVIEW EXISTING CONTROL DEVICES AND INTERLOCKS PRIOR TO DEMOLITION OF EXISTING EXHAUST FAN. PROVIDE AND INSTALL

ALL NEW EQUIPMENT AND CONTROLS DEVICES NECESSARY TO MAINTAIN EXISTING SEQUENCE OF OPERATIONS.

5. PROVIDE BACNET MSTP CONTROLS SYSTEM COMPATIBLE WITH SIEMENS, APOGEE. COORDINATE CONTROLS WITH DIAGRAM ON M-701.

NOT TO SCALE

TYPICAL EXHAUST / RETURN AIR DEVICE DETAIL1NOT TO SCALE

FLEXIBLE EQUIPMENT CONNECTION3 NOT TO SCALE

TYPICAL SUPPLY DIFFUSER DETAIL2

M

CT

M

M

M

M

CHW

HW

DX

M

HW

IFB

ELEC

M

SD

M

SD

AFS

T

H

H

L

H

L

FRZ

T

P

T

H

H

L

H

L

O

H L

ABBREVIATIONS

AI ANALOG INPUT

A

AO ANALOG OUTPUT

AFS AIRFLOW STATION

BI BINARY INPUT

B

BO BINARY OUTPUT

BP BUILDING PRESSURE

AF AFTER FILTER

CC COOLING COIL

C

CHW CHILLED WATER

CP CIRCULATING PUMP

DX DIRECT EXPANSION

D

DP DIFFERENTIAL PRESSURE

EA EXHAUST AIR

E

EF EXHAUST FAN

CT CURRENT TRANSMITTER

FF FINAL FILTER

F

GF GAS FURNACE

G

HC HEATING COIL

H

ER ENERGY RECOVERY

BPC BUILDING PRESSURE CONTROL

HW HOT WATER

HGB HOT GAS BYPASS

IFB INTEGRAL FACE AND BYPASS

I

LAT LEAVING AIR TEMPERATURE

L

LWT LEAVING WATER TEMPERATURE

HGB HOT GAS BYPASS

AFCV AIRFLOW CONTROL VALVE

AHU AIR HANDLING UNIT

EAT ENTERING AIR TEMPERATURE

EWT ENTERING WATER TEMPERATURE

MAT MIXED AIR TEMPERATURE

M

MOA MINIMUM OUTSIDE AIR

ECM ELECTRONICALLY COMMUTATED MOTOR

NG NATURAL GAS

N

DD DIRECT DRIVE

OA OUTSIDE AIR

O

OCC OCCUPANCY

OX OXYGEN

OXS OXYGEN SENSOR

PCC PRECOOLING COIL

P

PHC PREHEAT COIL

PF PREFILTER

BAC BUILDING AUTOMATION CONTROL

RA RETURN AIR

R

R/E RETURN/EXHAUST

R/R RETURN/RELIEF

SA SUPPLY AIR

S

SF SUPPLY FAN

SD SMOKE DAMPER

RF RETURN FAN

FSD FIRE SMOKE DAMPER

TCP TEMPERATURE CONTROL PANEL

T

TA TRANSFER AIR

TMV THERMOSTATIC MIXING VALVE

TCV TEMPERATURE CONTROL VALVE

UV ULTRAVIOLET

U

VFD VARIABLE FREQUENCY DRIVE

V

SYMBOLS

EQUIPMENT

CHILLED WATER COIL

DIRECT EXPANSION COIL

HOT WATER COIL

HOT WATER INTEGRAL FACE AND

BYPASS COIL

ELECTRIC HEATING COIL

GAS FURNACE

HUMIDIFIER DISPERSION GRID

MODULATING OPPOSED BLADE

DAMPER

MODULATING PARALLEL BLADE

DAMPER

SMOKE DAMPER

BACKDRAFT DAMPER

VAV ATU MODULATING DAMPER

2-POSITION OPPOSED BLADE

DAMPER

2-POSITION PARALLEL BLADE

DAMPER

FILTER

BLOWER FAN

PLENUM FAN

PUMP

CURRENT TRANSMITTER

2-WAY MODULATING

CONTROL VALVE

THERMOSTATIC MIXING VALVE

3-WAY MODULATING

CONTROL VALVE

SENSORS & DEVICES

DUCTWORK

PIPING

ZONE

NEGATIVE SPACE DIFFERENTIAL

PRESSURE SENSOR

POSITIVE SPACE DIFFERENTIAL

PRESSURE SENSOR

ZONE OCCUPANCY SENSOR

ZONE HUMIDITY SENSOR

ZONE TEMPERATURE SENSOR

AQUASTAT

FLOW METER

PRESSURE SENSOR

TEMPERATURE SENSOR

SUPPLY AIR DUCT STATIC PRESSURE

SENSOR

RETURN/EXHAUST AIR DUCT STATIC

PRESSURE SENSOR

DIFFERENTIAL PRESSURE SENSOR

DAMPER POSITION INDICATOR

HUMIDITY SENSOR

FREEZESTAT

TEMPERATURE SENSOR

SMOKE DETECTOR

AIRFLOW STATION

VOC VOLATILE ORGANIC COMPOUND

AIRFLOW SENSOR

RHC REHEAT COIL

XX XXXX

POINT TYPE

POINT NAME

AV ANALOG VIRTUAL

BV BINARY VIRTUAL

MECHANICAL CONTROLS LEGEND

SEQUENCE OF OPERATIONS

EXHAUST FAN (41-EF15A)

GENERAL DESCRIPTION

The exhaust fan provides general exhaust ventilation to the conditioned space(s) as shown on the drawings.

OPERATING MODES

OCCUPIED MODE

The exhaust fan shall be in occupied mode per the project design conditions schedule shown on sheet M-701.

UNOCCUPIED MODE

The exhaust fan shall be in unoccupied mode for all periods not included in the occupied hours of operation.

SAFETIES, OVERRIDES, AND INTERLOCKS

LOW EXHAUST AIR STATIC PRESSURE

The unit shall be disabled via hard wired interlock at the fan start circuit upon activation of the EA duct static pressure controller.

COMPONENT CONTROL LOOPS

EXHAUST FAN CONTROL – DUCT STATIC PRESSURE

• When the HOA switch is in hand position, the variable speed exhaust fan shall operate at a speed set manually by the operator at the user interface of the drive.

• When the HOA switch is in off position, the fan shall be off.

• When the HOA switch is in auto position, the variable speed supply fan shall operate subject to the unit enable signal, and unit operating modes.

OCCUPIED MODE:

• The exhaust fan shall be enabled after the EA damper has proven operable.

• The controller shall measure the EA static pressure and modulate the exhaust fan VFD to maintain the EA static pressure setpoint. The minimum fan speed shall be determined during test and balancing.

UNOCCUPIED MODE:

The exhaust fan shall be off.

MOTORIZED DAMPER

OCCUPIED MODE:

The motorized damper shall be open. The motorized damper shall open 30 sec (adj.)

prior to activation of the exhaust fan.

UNOCCUPIED MODE:

The motorized damper shall be closed. The motorized damper shall close 30 sec (adj.) after the fan is OFF.

H

LEA OUT

M

CT

ECM

N.C.

M

AO

BI

BI

BO EF START/STOP

BI

BOEA DAMPER

EA DAMPER STATUS

EF SPEED

EF STATUS

EF FAULT

BIEA LOW STATIC SHUTDOWN BIEA STATIC PRESSURE REPLACE EXISTING

WITH NEW BACNET

MSTP DEVICE

HL

EA IN

NOTE:

DAMPER(S) , ACTUATOR(S), AND STATIC PRESSURE DEVICES ARE EXISTING. PROVIDE NEW ELECTRONIC ACTUATOR(S) AND CONTROL DEVICES NECESSARY TO INTEGRATE NEW FAN AND CONTROLS INTO THE EXISTING ECC TERMINAL.

ASSOCIATED ENERGY RECOVERY RUN-AROUND LOOP IS EXISTING TO REMAIN.

B-ASC

EXISTING ENGINEERING

CONTROL CENTER

EXISTING

NETWORK

B-ASC

B-ASC

B-AAC

BACNET

BUILDING

CONTROLLER

(B-BC)

EXISTING ETHERNET

COMMUNICATION

NOTES:

1. REUSE EXISTING COMMUNICATION NETWORK.

2. INSTALL NEW CONTROLLERS (B-AAC, B-ASC) AS REQUIRED.

MSTP COMMUNICATION

(TYPICAL)

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR SBBL COLLABORATIVE JN, INC.

100 N. STONE AVE STE 1102

TUCSON, AZ 85701-1524

(520) 620-0255

NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023

NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024

NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023

CIVIL / STRUCTURAL ENGINEER

H2B, INC.

1225 N. LOOP WEST, SUITE 800

HOUSTON, TX 77008

(713) 864-2900

MECH / ELEC / PLUMB / TECH ENGINEER

SPUR DESIGN

2519 MADISON AVE

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

HEALTHCARE PLANNER

THE INNOVA GROUP

3196 NORTH SWAN ROAD

TUCSON, AZ 85712

(520) 886-8650

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

/1

/2

:2 :1

A

M

MECHANICAL CONTROLS

RAC 64JRM

BID DOCUMENTS

REPAIR SPS SEWER AND

UPGRADE EQUIPMENT AREA

08/11/2023

501-21-101

RAYMOND G. MURPHY VAMC

1501 SAN PEDRO DRIVE SE

ALBUQUERQUE, NM 87108

M-701

SPUR #: 1993.10

4. DIVISION 23 CONTRACTOR TO PROVIDE ROOM AIR BALANCE WHERE POSSIBLE. AIR BALANCE SHALL BE NEUTRAL FOR NON-CRITICAL SPACES NOT SHOWN IN SCHEDULE.

3. ZONE LEVEL SET POINT CONDITIONS SHALL RESET TO UNOCCUPIED UNTIL PATIENT ROOM SETPOINTS ARE SATISFIED.

2. ZONE LEVEL SET POINT CONDITIONS SHALL BE AS SCHEDULED UNLESS OTHERWISE SCHEDULED OR NOTED FOR ROOM SPECIFIC SPACE CONDITIONS.

1. ZONE LEVEL OCCUPANCY HOUR SCHEDULE SHALL BE PER BUILDING OPERATING HOURS UNLESS OTHERWISE SCHEDULED.

NOTES:

SUNDAY 7:30 a.m. - 6:00 p.m.

SATURDAY 7:30 a.m. - 6:00 p.m.

MONDAY - FRIDAY 7:30 a.m. - 6:00 p.m.

BUILDING OPERATING HOURS (VERIFY WITH STATION)

MIN. AMBIENT DB TEMP (50…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .